Category Archives: Planning

Substandard fire protection at nuclear Plant Hatch?

Does Hatch nuclear Unit 1 have substandard fire protection, like many reactors built before 1975? Protection against fires that the NRC says cause about half the core damage risk, such as at Fukushima, which is the same design as Hatch?

According to Simplyfy.org 2 Jan 2012, Fire Risk At Older Japan Reactors Shows Potential Worldwide Problem,

The [Japanese Nuclear Regulatory Authority] NRA announced recently that reactors built before 1975 likely have sub standard fire protection designs. This includes having important cables coated in fire resistant insulation, isolating and protecting cables and creating barriers to prevent fires from spreading to other areas of critical equipment.

Source: The Mainichi, 1 Jan 2013, Over 10 nuclear plants in Japan have flawed fire-prevention equipment: sources.

What else was built before 1975? Plant Hatch Unit 1 “Operating License: Issued – 10/13/1974”, according to the U.S. NRC. 100 miles from here, and the same design as Fukushima.

DOE also instituted upgrades and changes to their reactor facilities which included facility modifications as a result of Browns Ferry fire. Private sector nuclear power reactors in the US are not all fully up to the newer rules. The NRC has issued a number of exemptions that watchdog groups have criticized as being unsafe. Browns Ferry still does not meet the NRC fire rules for cables. 47 of 52 reactors in the US still do not comply with the 1980 fire regulations.

Plant Hatch is privately owned and operated. Has it been upgraded? Continue reading

Carbon bubble? Solar and wind erode coal, gas, and biomass credit quality —Moody’s

In Europe it’s already happening: solar and wind are causing bond-rater Moody’s to warn of downgrades of energy companies that depend on heat from burning coal, gas, or biomass. Moody’s earlier even warned the Bank of England of a potential carbon bubble developing. If combustion energy plants are affected like this, the credit effects will be even bigger on even-more-expensive nuclear plants, which Moody’s called a bet-the-farm risk way back in 2009.

James Murray wrote for businessGreen 6 Nov 2012, Moody’s: Renewables boom poses credit risk for coal and gas power plants: Credit ratings agency warns increases in renewable power have had ‘a profound negative impact’ on the competitiveness of thermal generation companies,

“Large increases in renewables have had a profound negative impact on power prices and the competitiveness of thermal generation companies in Europe,” said Scott Phillips, an assistant vice president and analyst at Moody’s Infrastructure Finance Group, in a statement.

“What were once considered stable companies have seen their business models severely disrupted and we expect steadily rising levels of renewable energy output to further affect European utilities’ creditworthiness.”

And not just rising, rising increasingly Continue reading

Net zero school in Bowling Green KY

Why stop with solar Lowndes High or VHS? Why not have all our elementary and middle schools generate more solar electricity than they use, and change their power bills into profits to help pay for education? A school in Bowling Green, Kentucky is already doing that.

Chuck Mason wrote for bgdailynews.com 22 December 2012, ‘Net-zero’ school pays off,

The district received a check for $37,227.31 this year. The Tennessee Valley Authority paid the school district for electricity it generated. The school district doesn’t have a power plant, per se, like the utility company. But it does have an energy producer, the first “net-zero” school in the nation: Richardsville Elementary School.

The check is tangible evidence that net-zero pays for itself and then some.

“It has exceeded expectations. We’re seeing a savings of millions of dollars in energy costs,” state Rep. Jim DeCesare, R-Bowling Green, said of the net-zero schools concept developing across the nation.

This is the same Bowling Green, Kentucky that has fast Internet access. Maybe that’s another reason the Chamber might want to consider comparing Bowling Green and Warren County to here.

-jsq

Florida Crystal River nuke down $5 billion?

Only 160 miles from here, the Crystal River nuclear reactor continues to run up a bad bill, maybe as much as $5 billion, and even other nuclear operators are reportedly starting to turn against it. Should we wait for the new nukes on the Savannah River to run up a bill that high before we cancel them?

Remember back in May?

Florida is already experiencing a likely future for the new Plant Vogtle nukes in Georgia: completion date pushed back, and customer charges raised.

Yep, that’s the one. And the bill keeps going up, as Ivan Penn wrote for the Tampa Bay Times 30 December 2012, Utilities nationwide could share the financial pain of the idled Crystal River nuclear plant,

The crippled Crystal River nuclear plant is now America’s headache.

The bill to fix it and pay for replacement power may top $5 billion. The problem?

The company that insures all 104 U.S. nuclear power plants has just $3.6 billion on hand to pay for claims.

Broken nuclear plants in California, Texas and Michigan will vie for some of that money. But Crystal River alone represents such a financial threat that the insurance company, Nuclear Electric Insurance Ltd., may demand that its member utilities pony up more money.

Is NEIL the guarantor on the bonds for the new nukes at Plant Vogtle? I think Southern Company was smarter (for SO, not for us) and got Congress to guarantee those. If so, Continue reading

Plant the seeds for viable water future

This AJC op-ed is about coastal wetlands, but much of it applies to wetlands such as cypress swamps and streams in Lowndes County and the rest of central south Georgia, especially since our state water plan for the Suwannee-Satilla Region points us at County-Level Population Projections from the Governor’s Office of Planning and Budget that project 45% growth in Lowndes County population in 20 years to 156,650 people by 2030, which means near doubling in 30 years to 2050. -jsq

David Kyler wrote for the AJC 29 December 2006, “Plant the seeds for viable coastal future”,

Recent population projections for the Georgia coast issued by 2010-2030 Change in Population of Georgia Counties Georgia Tech say nothing new. We’re growing at almost 20 percent a decade, meaning a near doubling every 35 years.

The Center for a Sustainable Coast projected a population of about 1 million by 2030 for the 11 counties in the coastal region as defined by the Department of Natural Resources, somewhat higher than the 844,000 predicted by Georgia Tech. This compares with a population of 538,469 reported in the 2000 Census report.

But the accuracy of projections is not the point. Increased population will result in more land clearing and environmental disturbance than in the past—there will be larger homes, bigger lots and fewer people per household.

National studies show up to twice as much land is

Continue reading

Solar cars and charging stations: who wouldn’t?

Tired of Southern Company CEO Fanning’s maybe “next decade” for solar power? Tired of Georgia Power’s Bowers trying to push solar off for fifty years? Let’s hear from somebody who takes on big tasks and gets them done: Elon Musk, who’s already built a rocket that is resupplying the International Space Station, and who is also building all-electric cars.

Carl Hoffman wrote for Smithsonian magazine December 2012, Elon Musk, the Rocket Man With a Sweet Ride

When he’s not launching rockets, Musk is disrupting the notoriously obdurate automobile industry (see National Treasure, p. 42). While industry giants like Chevrolet and Nissan and Toyota were dithering with electric-gasoline hybrids, this upstart kid said he would design and manufacture an all-electric car that would travel hundreds of miles on a single charge. The Tesla Roadster hit the streets in 2008 with a range of 200 miles, and the far more functional Model S, starting at $57,000, was introduced in June. It’s the world’s first all-electric car that does everything my old gasoline version does, only better. The high-end model travels 300 miles on a single charge, leaps from zero to 60 in 5.5 seconds, slows from 60 to a dead stop in 105 feet, can seat up to five, has room for mulch bags and golf clubs, handles like a race car and its battery comes with an eight-year, 100,000-mile warranty. If you charged it via solar panels, it would run off the sun. One hundred a week are being produced in a former Toyota factory in Fremont, California, and nearly 13,000 people have put deposits on them….

And since that story: Continue reading

Waste offer letter: take it or….

Unsigned trash letter from Lowndes County I received the appended unsigned letter from Lowndes County recently, which says the 5,000 residents of the unincorporated parts that currently use the county’s waste disposal sites can sign up with Advanced Disposal (of New York City) for curbside pickup or…. There is no or. So look forward to trash dumping long roadsides, in parking lots in town, and on your property. And neither outgoing County Chairman Ashley Paulk nor County Manager Joe Pritchard even had the courtesy to sign the letter.

After noting that back in June the county changed waste permit cards from 12 months to 6 months, the letter says:

At purchase, information was made available regarding possible future options for solid waste management in unincorporated Lowndes County.

So the county is backing off from claiming card buyers got a letter spelling out options. I got no such letter with card purchase.

This consideration became necessary due to revenue generated by the sale of the permit cards, not covering the cost of operating the centers.

And that’s all the accounting we get. Where is the summary of expenses for the centers compared to revenue? The VDT reported from the Commissioners’ stealth retreat back in April:

“In total, the county is currently spending $782,058.34 each year for solid waste disposal, a reduction from $1,176,207.75 in 2007.”

As I pointed out then, “So that’s a rapid reduction in cost to less than a third of what it used to be, and less than half of what it was only a year ago.” Later Joe Pritchard said those numbers didn’t include everything being spent. So what was actually being spent? We the taxpayers and we the card payers don’t know. After a long series of meetings to which the public was either not invited at all or was not invited to provide input, at its last meeting of the year (exactly as I predicted), Commissioners approved changes to the solid waste ordinance eliminating the collection sites and granted a monopoly to Advanced Disposal Services of New York City.

Former Chairman Ashley Paulk recently complained Moody AFB had become “privatized”. Yet at his last Commission meeting he presided over privatizing the county’s public service of solid waste collection.

Three new Commissioners were just sworn in yesterday, including a new chair. The new Commission in the new year is not, so far as I know, bound by the decisions of any previous Commission. It could undo the damage the old one just did. Or it could, like the old one, ignore concerns of public health, safety, and the environment that the state requires them to implement, plus concerns of local waste collection businesses, of local residents about recycling and about the lack of any other option than curbside; will the new Commission continue to kick 5,000 county residents towards curbside collection or tossing their trash in the your yard?

Unsigned trash letter from Lowndes County:

Continue reading

Industrial Authority working for solar in south Georgia @ VLCIA 2012-12-18

The Industrial Authority is working to find locations for some of the 210 MW Georgia Power got the PSC to shift from biomass to solar back in September. That’s a good next step.

Jason Schaefer wrote for the VDT 23 Dec 2012, Solar power push has Authority working to establish connections,

Since the Georgia Public Service Commission (PSC) approved Georgia Allan Ricketts, Projects and Existing Industry Manager, VLCIA, 2012-12-18 Power Company’s plan Nov. 20 to add 210 megawatts of solar power to its electrical grid, the Valdosta-Lowndes County Industrial Authority has been devising strategies to draw solar energy producers to South Georgia.

Georgia Power will issue a Request for Proposals (RFP) from solar energy collection and production companies in early 2013, according to the PSC, and the company will contract with the lowest bidders to purchase their energy and place it on the Georgia Power electrical grid for public consumption.

Georgia Power plans to add 90 megawatts to its grid from distributed generation (small companies producing between 100 kilowatts and 1 megawatt), and 120 megawatts of large utility-scale projects producing up to 20 megawatts each. The company plans to price the solar energy at $0.13 per kWh for distributed generation and up to $0.12 per kWh for utility-scale projects, according to the PSC.

This government-approved commercial push for solar energy could be a boon to sunny South Georgia as well as the greater Valdosta area specifically, and the Authority is prepared to accommodate the solar energy producers they expect.

Andrew Schruijer, Executive Director, VLCIA, 2012-12-18 “I think there’s a very good possibility of solar energy coming to South Georgia,” Executive Director Andrea Schruijer said. “Possibly in the near future.”

There’s more in the VDT story. It’s pretty much what Col. Ricketts also told me after the VLCIA meeting Tuesday a week ago. He asked me if I knew what “distributed” meant. I pointed out Georgia Power’s version of distributed was actually not very distributed, compared to Continue reading

Fracking: coming soon to a state near you?

Lest you think fracking is something that happens only in faraway places like Alberta or Pennsylvania, look at this map of North American shale gas basins, extending right through the Appalachians from Pennsylvania through West Virginia, Virginia, Tennessee, and North Carolina into Georgia, Alabama, and Mississippi.

Source: Canada fracking creates ‘test tube‘ residents in B.C., Alberta,
by Lynn Herrmann for Digital Journal 5 January 2012.

How long before Georgia Power or Southern Company decide natural gas would be even cheaper if they fracked in Georgia or Alabama or Mississippi? How long until unavoidable human error starts fracking polluting our local groundwater and rivers? For that matter, isn’t it bad enough already that other people’s water is fracked for cheap gas in Georgia?

We could just get on with solar power, which doesn’t spill.

-jsq

NRC says it’s “never been a practice” to show licensee documents to the public

After Kendra Ulrich of Friends of the Earth asked about some licensee documents related to last week’s NRC hearing in faraway Maryland on restarting California’s San Onofre nuclear reactor, NRC’s David Beaulieu expanded on NRC’s refusal to divulge the documents.

Here’s the video:

Video by Myla Reson at NRC, Maryland, 18 December 2012.

You can hear him say it’s “never been a practice” to let the public see licensee documents. But if they’re being used in making a license decision, why doesn’t that make them public documents accessible by the public? Oh, right “it’s very complex” but “it’s a yes or no question” and “I will assess”, he says. It’s good to be king!

I wonder if the public had some assurance of transparency maybe the NRC wouldn’t get so many FOIA requests?

Remember, this is the same NRC that gave 100-mile-from-here same-design-as-Fukushima Plant Hatch a 20 year license extension, and the same NRC that gave Plant Vogtle a clean bill of health at a public meeting two days before Unit 1 shut down, and the same NRC that could stop the new nukes there even if the GA PSC won’t.

What if we deployed solar power instead, on budget and on time?

-jsq