Tag Archives: LAKE

All new U.S. energy was solar in October 2013

While ten nukes were shut down or cancelled in 2013, solar power continues its compound-interest-curve ever-faster deployment. Zero (0) new nukes were built in 2013 and in October all new U.S. utility-scale power was solar. Unfortunately, the biggest of those was Southern Company’s Campo Verde, which powers California, not Georgia or the southeast, but that is changing now.

Todd Woody wrote for The Atlantic 26 November 2013, Solar Energy Was America’s Sole New Power Source in October: Get ready for a photovoltaic building boom.

In October, power plants generating 530 megawatts of electricity came online in the United States. And every single electron put on the grid came from the sun, according to a report released today.

That’s apparently not even counting rooftop solar.

The report is Solar the sole capacity completed in October, at 530 MW, by Althena Enguerra for SNL 25 November 2013. Continue reading

EU could cut 40% emissions with little cost: and we can, too

If Europe can do it, the U.S. can do it. And we know Georgia can get a third of its power from wind, and even Spain is north of Mississippi, Alabama, Georgia, and Florida, which have a lot more sun for solar power than anywhere in Europe. Solar power is already winning, even in Georgia. Let’s help it win even faster, plus wind.

PR from Potsdam Institute for Climate Impact Research (PIK) 16 January 2014, EU could cut emissions by 40 percent at moderate cost,

The costs of achieving a more ambitious EU climate target are estimated to be moderate. Upscaling greenhouse-gas emissions reduction from the current 20 percent by 2020 to 40 percent by 2030 would be likely to cost less than an additional 0.7 percent of economic activity.

And that apparently doesn’t count the additional economic activity that would be produced by all those wind and solar deployments, not to mention related activities like electric cars. This is actually a pessimistic study, because it doesn’t account for such likely positive corollaries.

Many options to choose from—wind power could expand sevenfold

Continue reading

U.S. #58 out of 90 in broadband cost

Stacey Higginbotham wrote for GigaOm 16 January 2014, Two charts that show how crappy U.S. broadband is,

Despite the deployments of a few gigabit networks by Google and the spread of faster cable technology, U.S. broadband is falling behind. It’s expensive both as a monthly bill and on a per-megabit basis when compared to the rest of the world. For example, at $89 per month on average, U.S. residents pay more for broadband than residents in 57 other countries including Canada, Bulgaria, Colombia and the U.K. That’s right, the U.S. ranks 58 out of 90 countries.

The research, from research firm Point Topic concludes that the higher broadband prices are “caused by lower investment in infrastructure as well as lower take-up which prevents them from benefiting from economies of scale.” To get the above data the firm compared the prices paid for residential broadband and includes standalone and bundled services offered over DSL, fiber and cable broadband in the fourth quarter of 2013.

Per-country comparisons like this are hard to act on, but even at the country level we know Continue reading

TPP Environment chapter released by Wikileaks

No penalties and no proposed criminal sanctions in TPP for environmental destruction, in sharp contrast to the U.S. proposal for new criminal penalties for “unintentional infringements” intellectual property.

Secret Trans-Pacific Partnership Agreement (TPP) – Environment Consolidated Text

Today, 15 January 2014, WikiLeaks released the secret draft text for the entire TPP (Trans-Pacific Partnership) Environment Chapter and the corresponding Chairs’ Report. The TPP transnational legal regime would cover 12 countries initially and encompass 40 per cent of global GDP and one-third of world trade. The Environment Chapter has long been sought by journalists and environmental groups. The released text dates from the Chief Negotiators’ summit in Salt Lake City, Utah, on 19-24 November 2013.

The Environment Chapter covers what the Parties propose to be their positions on: environmental issues, including climate change, biodiversity and fishing stocks; and trade and investment in ‘environmental’ goods and services. It also outlines Continue reading

Wind for 1/3 of Georgia electricity, plus solar

“Georgia has about 14.5 gigawatts of feasibly developed offshore wind energy potential–enough power to provide one-third of Georgia’s current electrical needs.”

And the wind blows at night when the sun doesn’t shine. Add solar for the peak power day, and there’s no excuse for coal, nuclear, or natural gas.


Georgia’s Offshore Wind Energy Potential Showcased at CoastFest, by Allie Brown for SACE 15 October 2013.

Georgia Power and Southern Company know this. When will they act on it?

PS: Owed to Danielle Jordan

-jsq

Videos: 2 agreements, education, jail, alcohol, and a health care presentation @ LCC 2014-01-13

They vote tonight at 5:30PM. Probably there won’t be a repeat of yesterday morning’s presentation by District Health Director Dr. Grow. The county wants an architect for a new roof and shower in one jail pod; it’s considering two interagency agreements, one for Valdosta Inspections for Lake Park and the other for the county extension, plus setting election qualifying fees and a Special Assessment Rate for 2014. There’s a beer license and acceptance of infrastructure for part of Grove Pointe Subdivision.

Here’s the agenda with links to the videos:

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JANUARY 13, 2014, 8:30 a.m.
REGULAR SESSION, TUESDAY, JANUARY 14, 2014, 5:30 p.m.
327 N. Ashley Street — 2nd Floor
Continue reading

Change orders in DeKalb County

Manipulating construction contracts landed two former DeKalb County school employees in prison.

Rhonda Cook wrote for the AJC 9 December 2013, Former DeKalb schools COO gets 15 years: Judge rejects former superintendent Crawford Lewis’ deal for no jail time,

Prosecutors allege Reid sent work to her husband by presenting new work at Columbia as an extension of what he was already contracted to do and then Pope allegedly overcharged the district.

Prosecutors also contend Continue reading

Actually, green solar power is winning

An article that dismisses without investigation the fastest growing industry in the world, solar power, after solar has become cheaper than any other energy source, is not a serious article.

Richard Smith wrote for Truthout 9 January 2014, Green Capitalism: The God That Failed. Sure, there are lots of good points in there (such as we need a carbon tax, but it’s not enough), but given that only 90 companies account for 2/3 of GHG emissions saying we can’t change that without crashing the world’s economy is like saying we can’t deal with horse manure in cities in 1900 without crashing the world’s economy, and people did say things like that back then.

Most of the world’s oil and gas is used to produce power, so once we convert to solar and wind, we’ll have plenty of remaining petroleum for other uses such as lubrication.

Saying in 2014 that solar and wind can’t power the world is like saying in 1994 that Continue reading

Nottinghill resolved, Spectra profit sharing? Planning Commission transparency? @ LCC 2013-12-10

The Commission’s designated first speaker confused order with good. Chairman Bill Slaughter required a sitting judge to go to the podium to speak, even though he had not required that for multiple Spectra pipeline reps the previous morning. Nottinghill is finally resolved, after yet more probing questions by Commissioners; more than they asked the Spectra reps. A VSU professor and a landowner asked very good questions about the pipeline, a KLVB board member gave a report, and Gretchen asked the Commission to post Planning Commission minutes online.

Two people were appointed; one spoke. The two beer licenses, a liquor license, the decorative special tax lighting district for Windstone, the contracts, the resolution to ask the legislature for an additional judge, and the bids were all approved with little discussion. The settlement for back pay it turns out didn’t actually involve employees having to sue to get paid.

Here’s the amended agenda with the two added items, plus links to the videos and a few notes. See also the previous morning’s Work Session.

LOWNDES COUNTY BOARD OF COMMISSIONERS
AMENDED AGENDA
WORK SESSION, MONDAY, DECEMBER 9, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, DECEMBER 10, 2013, 5:30 p.m.
327 N. Ashley Street — 2nd Floor
Continue reading

Sabal Trail not a common carrier with open access in Georgia –Mindy Bland @ LCC 2013-12-10

A local landowner said that with no open access in Georgia, Sabal Trail Transmission should have no standing to use Georgia eminent domain law. And Sabal Trail must comply with local, state, and federal laws and ordinances, including ones that could be passed by the Lowndes County Commission, she said at their 10 December 2013 Regular Session.

For example, a depth ordinance, or an ordinance requiring a minimum distance from homes or schools. Or a tax on the pipeline easement. She recommended PipelineSafetyInfo.com. She asked for the Commissioners to use their voice.

As WCTV quoted her in their coverage, she said,

I don’t want to have to fear for my children as they sleep at night.

County Manager Joe Pritchard shuffled papers and alleged County Attorney Walter G. Elliott yawned during these citizen presentations.

Mindy Bland noted Commissioner Powell had asked for Continue reading