Category Archives: Transparency

Vogtle reactor vessel sitting unprotected at Savannah port

What happened to Plant Vogtle’s new reactor vessel after it was in a train wreck a week ago? It went back to Savannah port and sits there unprotected and unguarded.

Thomas Clements wrote for the Aiken Leader 14 January 2013, Vogtle AP1000 Nuclear Reactor Vessel Discovered Unprotected, Stranded in Savannah Port since December 15 Shipment Failure,


Tom Clements, Alliance for Nuclear Accountability

The reactor pressure vessel (RPV) for the chronically delayed Vogtle AP1000 reactor construction project near Waynesboro, Georgia sits stranded and seemingly unprotected in the port of Savannah. The special railroad car carrying the 300-ton vessel had unknown mechanical problems on December 15 on exiting the port. The NRC has said that the vessel only got one-quarter mile before a sound was heard and the car stopped. Plans by Westinghouse and Southern Company to move the vessel are unknown. It is also unknown if the railroad car can be repaired and used or if the railroad company which owns the line is concerned that the rail car might break down again on its line in an in accessible place. Meanwhile, the apparently unguarded reactor might be subject to sabotage and sits in apparent violation of NRC quality assurance and “administrative control” regulations.

The article includes links to several more pictures taken 13 January 2013 by Tom Clements of Alliance for Nuclear Accountability, such as this one with the bridge clearly visible:

Continue reading

Industrial Authority: new website, same old agenda tonight @ VLCIA 2013-01-15

The Industrial Authority has a spiffy new website under a new domain, buildlowndes.com, and with their new logo, formerly only on their facebook page. Their meeting agenda for tonight, however, is the same old recycled content-free placeholder.

I sure don’t miss the old hexagon menu, the new menu is up top and usable before they waste a bunch of space with stock photos. The Our Team page even links to the Linkedin profiles of Andrea Schruijer and Meghan Duke. While Allan Ricketts does have a Linkedin profile, it’s not very fleshed out and they don’t link to it.

The Recent Investments page is interesting, although it would be more so if Continue reading

Gretchen LCDP v. Austin Scott GA-08 on WCTV

Gretchen with LAKE video camera Hearing a representative was in town, Gretchen took the LAKE video camera down to the Chamber of Commerce. Greg Gullberg of WCTV invited her to rebut Rep. Austin Scott (R GA-08) in her role as Chair of the Lowndes County Democratic Party (LCDP). After some back and forth, the WCTV story shows transparency winning, and Gretchen with the last word.

Rep. Scott GA-08 Gretchen as LCDP Chair

But their [sic] is one thing they both agree on.

“I quite honestly think both sides ought to put their budgets on C-Span and maybe we ought to have those negotiations on C-Span,” said Scott.

“So I’m all for having everything all out on the table for all citizens to see,” said Quarterman.

Scott speaking Gretchen speaking

Hey, what if the Lowndes County Commission put its board packets and budgets out on the web for all us taxpayers to see?

Here’s the WCTV video. The video Gretchen took will follow.

Continue reading

Fire in Texas nuclear reactor

Do fires at nuclear plants like Plant Hatch actually still occur? Yep, at the South Texas Nuclear Project, just this week. And that STP Unit 2 is a different design and newer (1989) than Hatch 1 or 2. Austin has been trying to sell its share in that lemon since 1981. Even TEPCO cancelled plans for new reactors there in 2011, due to cost overruns and the Fukushima disaster. What say we cancel our new nuclear lemons at Plant Vogtle?

According to the NRC event report for 9 January 2013:

UNUSUAL EVENT DECLARED DUE TO MAIN TRANSFORMER FIRE

“Fire in Unit 2 main transformer 2A. Reactor trip. Two train of offsite power lost to Unit 2.”

“An Unusual Event was declared based on EAL HU-2—Fire or explosion in protected area or switchyard which affects normal plant operations.”

At 1655 CST, South Texas Unit 2 declared an Unusual Event due to a main transformer fire. Unit 2 tripped from 100% power and is currently at 0% power in Mode 3. The transformer fire is out. In addition to the loss of the main transformer, several safety related electrical busses and non-safety electrical busses lost offsite power. The appropriate emergency diesel generators started and powered the safety related busses. Unit 2 is currently stable and on natural circulation due to the loss of power to the reactor coolant pumps. Auxiliary feedwater is functioning as required and decay heat is being removed through the steam generator atmospheric relief valves. Unit 1 was unaffected by the event.

The licensee notified the NRC Resident Inspector.

Notified DHS SWO, FEMA, DHS NICC and NuclearSSA via email.

According to the NRC, they still don’t know Continue reading

Videos: money and transparency @ LCC 2013-01-08

The new Commission with the new portrait got to hear about money and transparency right away. And a surprise alcoholic vote caused by their lack of transparency.


Crawford Powell (Dist. 3), Richard Raines (Dist. 2), Bill Slaughter (Chairman), Joyce Evans (Dist. 1), John Page (Dist. 5), Demarcus Marshall (Dist. 4).

Here’s the agenda, with links to videos, and a few notes, followed by a video playlist. See also the Monday Work Session.

Continue reading

How are we paying on something that was 100% paid off? —John S. Quarterman @ LCC 2013-01-08

Why are we furloughing librarians to save $30,000 when we apparently floated bonds for unbudgeted millions on the county palace? That’s essentially what I asked the Lowndes County Commission at their 8 January 2013 Regular Session. Nobody had an answer.

Just to add to what Commissioner Lee said, in addition to everyone appreciating all your service, I’m sure we all appreciate all his long years of service.

Of course there are some things that have come up since he was first on the Commission. For example, Internet access.

The Internet is the roads of the future.

Perhaps funding that might be as important as striping roads. It’s a thought.

For more on that, see what Idelle Dear said just before.

And I really appreciate that clock there. It’s a sign that sometimes change is good.

At least they are doing a few things differently.

When this building complex was opened in 2010, the county put out a double-sheet flyer saying it was completely paid off out of SPLOST money, with zero dollars owed. I’m wondering how it is that then, either in November or December, the Commission just before your one here, refinanced bonds that included I think it was six or seven million dollars for this very building complex? I’m very confused by that. I wonder if someone could clarify how we’re paying on something that was completely 100% paid off with zero owed.

It’s actually about $8.9 million. Why are we paying that? Nobody answered. County Manager Joe Pritchard, pictured below, on that 2010 flyer I mentioned, paid no attention.

A prominent local member of the fourth estate said nobody was allowed to answer. Actually, the Commission’s own Policies and Procedures for Citizens Wishing to be Heard include these lines:

Continue reading

Make available packets Commisioners see? —Gretchen Quarterman @ LCC 2013-01-08

Gretchen Quarterman thanked and congratulated Commission members at the 8 January 2013 Lowndes County Commission Regular Session.

Then she reminded them she ran on a platform of transparency, and she asked them to make Commission packets available to the public, and move CWTBH to the beginning of the meeting so citizens can comment before the commissioners vote.

Here’s the video:

Make available packets Commisioners see? —Gretchen Quarterman
Regular Session, Lowndes County Commission (LCC),
Video by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE), Valdosta, Lowndes County, Georgia, 8 January 2013.

-jsq

$30,000 saved by library furloughs, $millions for building construction —Idelle Dear @ LCC 2013-01-08

Idelle Dear noted we’re up to 12 library furlough days, and reported a flaw in that picture to the 8 January 2013 Lowndes County Commission Regular Session.

I looked across the street and there are millions of dollars being spent on the construction of the hospital, construction of the VSU Health Sciences building. And yet what is happening, because this is a mandatory furlough for all employees, is that people who are employed by the South Georgia Regional Library, most of whom are minimum wage, work part time, rely on the income: they are going to lose out….

We’d heard about these state-mandated furlough closings at a library board meeting. Idelle Dear spelled out some of the consequences, and made some telling comparisons.

Something is wrong with this picture, and I realize there are different kinds of money, but something is wrong with this picture if we can spend millions and millions of dollars on construction of these buildings and yet shut down the library and the employees who are in low income are going to be affected.

She said she wasn’t sure most people even knew about all this. And she heard somebody had said most people have Internet at home, but

Continue reading

Stripe some roads! —Former Commissioner Richard Lee @ LCC 2013-01-08

The ghost of Commissions Past, in the form of former Commissioner Richard Lee, pointed his finger at the Commission and staff at the 8 January 2013 Lowndes County Commission Regular Session.

Richard Lee congratulated the current Commissioners on being willing to serve. He pointed at Commissioner Joyce Evans as having been to this rodeo before. He said they could trust County Manager Joe Pritchard. And he asked them to find money to stripe roads.
So if y’all can find some coins, and Mr. Prichard has a real knack for doing that, we’d appreciate it up in my end of the county.

That’s curious, since Mr. Pritchard can’t seem to to keep the solid waste collection stations open, or for to keep libraries open, or even for a bus for 4-H without children doing much of the heavy lifting.

But Mr. Lee is confident Mr. Pritchard can find funds to stripe roads in Mr. Lee’s neighborhood!

Here’s the video:

Continue reading

Vogtle nuclear reactor train wreck

Ever wondered what a nuclear reactor vessel looks like? Here’s one that’s literally a train wreck, on its way to Plant Vogtle on the Savannah River.

Rob Pavey wrote for the Augusta Chronicle 10 January 2013, Vogtle reactor vessel slips between Savannah, Burke County,

A 300-ton reactor vessel bound for Plant Vogtle was stranded briefly in south Georgia this week after a malfunction with the specially designed rail car moving the nuclear component from Savannah to Burke County. Workers examine a rail car that was transporting a 300-ton reactor vessel from the Port of Savannah to the Plant Vogtle nuclear site in Burke County. A misalignment between the cargo platform and the rail car caused the component to be returned to Savannah.

“The platform that contained the RV (reactor vessel) during transport became misaligned with the Schnabel railcar, so the railcar stopped immediately,” said Georgia Power Co. spokesman Mark Williams. “The platform and car were re-aligned the same day and safely returned to the port.”

The Schnabel railcar, which features extra axles that help distribute and support the weight of heavy objects, did not break, he said. Georgia Power would not divulge the location of the incident.

I wonder what the locals think. We’d ask them, if we knew where they were.

Well, that’s the only mishap so far, right?

Continue reading