Tag Archives: LAKE

What’s the Industrial Authority’s Plan?

Appended is my LTE in the VDT today. I’ve added links. -jsq

What is the Industrial Authority’s plan to bring in real clean jobs?

MAGE SOLAR is hiring for the first of 350 jobs in its photovoltaic (PV) solar manufacturing plant in Dublin, Georgia, with half the population of Valdosta, in Laurens County, with half the population of Lowndes County. They’ve parlayed their position between the Atlanta airport and the Savannah seaport for many new clean jobs.

Suniva of Norcross’s second PV plant with its 500 jobs went to Michigan. Saginaw Valley calls itself Solar Valley and collaborates with governments, academia, and industry, winning thousands of clean jobs in wind and solar manufacturing and generating plants.

The Saginaw News remarked (7 Nov 2010): Continue reading

VLCIA biomass event Q&A

Here are videos that illustrate the VDT’s point today in What We Think:
While officials continue to downplay local citizen anger about current projects, citizens are organizing in a variety of ways to affect change the next election cycle. When Sterling Chemical came to Lowndes County in the 1990s, citizens were told the project was a “done deal,” and so it was. Sterling is still here, but those in office at the time aren’t, and the director of the Industrial Authority at the time is no longer here either.

As has been shown worldwide, citizens are tired of being told what’s best for them, having no say so in how their tax dollars are spent, and having their concerns ignored.

Until officials understand that it is coming from all directions and not just led by a few malcontents, the swell will continue to grow. And those who continue to ignore the anger and frustration do so at their own peril.

Maybe the VDT is referring to this kind of response from the VLCIA panel on 6 Dec 2010:
“these things do prop up the local economy, period, end of discussion.”
A previous questioner who had a job in Vietnam notes he was lied to about Agent Orange and asks “can you assure me that I won’t be affected by this?” Continue reading

Where’s the wood to come from and who will buy the electricity?

Here’s video of what I asked at the recent VLCIA biomass event (6 Dec 2010) and the answers from the panel.

So there’s actually not any new study of wood sourcing (Brad Lofton told me after the meeting that the study had been “completed” after we met in June), and the study that exists is not publicly available. Someone from Sterling promised me after the meeting to redact the private parts of the wood sourcing study and provide the rest for public distribution. We’ll see.

Regarding my question about who will buy the electricity and whether we’ll end up like Plant Scherer, selling electricity to Florida while keeping the pollution here, the answer was: Continue reading

Contact Information for Elected and Appointed Officials

National, state (Georgia), and local (Lowndes County, Valdosta, Hahira, Lake Park, Remerton, and Dasher) elected officials, plus a selection of local appointed officials, including the Valdosta-Lowndes County Industrial Authority Board of Directors:
Roy Copeland Gary Minches Mary B. Gooding Norman Bennett Jerry Jennett

All of the above on the same page.

This is not every local elected or appointed official yet; if there are others you want to contact, let LAKE know and we’ll go ahead and add them.

-jsq

Videos: McDonald’s vs. Foxborough Sign Variance

The corpulent corporate giant asked for a variance, and met with unexpected opposition, as well as unexpected results. The formal title of the item was VAR-2010-15 McDonald’s Corp. (4601 Foxborough Avenue), on the agenda of the Valdosta-Lowndes County Zoning Board of Appeals (ZBOA). McDonald’s was “Requesting a Variance to the maximum square footage allowed for drive-thru signage.” Lowndes County Zoning Administrator Carmella Braswell. introduced the case, and Chair Allan Strickland mentioned pictures of other fast food restaurants with signs within ordinance limits.

A McDonald’s employee and his lawyer presented their case, in which we learned that McDonald’s wants two signs for a large total variance and that McDonald’s doesn’t want to do custom signs.

Well-known local lawyer Gary Moser stepped up to speak for over 200 residents of the Foxborough neighorhood who don’t want a McDonald’s at their entrance. Continue reading

On What Basis Does ZBOA Decide?

How does the Valdosta-Lowndes County Zoning Board of Appeals (ZBOA) base its decisions? Well, its members are appointed by two different local governments, of the City of Valdosta and Lowndes County, and each government provides its own criteria. Here they are: Continue reading

Who is ZBOA?

The current members of the Valdosta-Lowndes County Zoning Board of Appeals (ZBOA) are:
City of Valdosta
Allan Strickland, Chair
Laverne Gaskins
Scott Orenstein, Vice-Chair
Nancy Hobby
Paul Alvarado
Lowndes County
Gretchen Quarterman
Dr. William Houseal
Dave Kirk
Here they are at their 14 Sep 2010 meeting:

Left to right: Laverne Gaskins, Gretchen Quarterman, Paul Alvarado, Allan Strickland (Chair), Scott Orenstein (Vice-Chair), and Dr. William Houseal. (Nancy Hobby and Dave Kirk were not present at that meeting.)

According to the city’s web page about them:

The ZBOA is a joint board consisting of eight appointed citizens, four each for the City of Valdosta and Lowndes County. Members are appointed for three year terms. City board members are appointed by the Mayor-Council based on their experience in land development, their familiarity with the City of Valdosta Zoning Ordinance, and their willingness to commit sufficient time to the board in order to be an effective board member.
What do they do? Continue reading

First Friday, Valdosta, 3 Sep 2010

Downtown Valdosta was bustling Friday night:

That’s Albert in the hat bending my ear.

There was food, there was blown glass and much other artwork, and bands. As previously mentioned, SAVE was educating people about the problems with biomass. More pictures in the flickr set.

First Friday, Valdosta, Lowndes County, Georgia, 3 September 2010, Pictures and videos by Gretchen Quarterman for LAKE, the Lowndes Area Knowledge Exchange.

-jsq

Proposed Solar Plants

OK, let’s look at “solar” in the online interactive map from Joel Achenbach’s story about The 21st Century Grid in the July 2010 National Geographic. It’s easy to count the proposed solar power plants in Georgia: zero. Yet there’s one in Virginia, one in Maryland, and at least three in Florida, adding to the currently largest solar plant in the country near De Soto, Florida. The map legend repeats the GEFA canard that
The Southwest is a solar-power hotbed. To supplement fossil fuel plants, long-distance transmission lines stretch from the Mojave Destert, which has plenty of sun.
Yes, that’s true, but what about this. At least three solar plants are proposed around San Antonio and Austin, which are not in the area of the southwest the map blurb is referring to. In fact, the largest solar plant in the country is proposed for Austin. Austin is one degree of latitude south of Valdosta, and has been leading the country in solar deployment for many years now. Texas in general almost doubled renewable energy generation between 2004 and 2006 while Georgia did nothing. Texas hasn’t stopped. When will Georgia start?

The Austin solar solution doesn’t require massive new power lines, either. It’s mostly been accomplished with solar panels on houses and business roofs; panels that wouldn’t show up on National Geographic’s map because they’re small and distributed. Which is the point: they generate power where it’s needed, and at peak times when it’s needed, namely when it’s hot and sunny out and air conditioners are running on max. There’s no reason Georgia can’t do the same.

I would continue this series by showing wind generation proposed for Georgia, but there isn’t any of that, either. There could be, off the coast.

Which makes more sense: polluting our air with more coal and biomass plants, or getting a move on with solar and wind?

-jsq

Proposed Biomass Plants

Let’s select “other” in the online interactive map from Joel Achenbach’s story about The 21st Century Grid in the July 2010 National Geographic. This map clearly shows the proposed Wiregrass LLC plant in Valdosta, as well as two plants proposed just to the south for Hamilton County, Florida, and one in Echols County, Georgia, which presumably would be the Oglethorpe Power alternative site. Several of the other plants shown are probably the other proposed Oglethorpe Power plants. Missing is Georgia Power’s Plant Mitchell in Albany, which is supposed to convert from coal to biomass. (Also if you select “nuclear”, the two Georgia Power proposed nuclear plants on the Savannah River are missing.) Apparently National Geographic edoesn’t have a complete list of proposed biomass plants. I wonder who does, if anybody?

Nonetheless, take this map of proposed biomass plants and combine it with the map of proposed new coal plants, plus the existing coal plants in Juliette, Georgia (dirtiest in the country) and Albany, and south Georgia is slated to become even more infested with polluting energy sources.

Does that seem like a good idea to you?

Next: proposed solar plants.

-jsq