Category Archives: Planning

Duke and Progress to buy Santee-Cooper’s Summer nuke?

I erred in saying Duke owns nuclear Summer Station in North Carolina: it’s actually owned by SCANA and Santee Cooper. But I wasn’t as wrong as I thought. It looks like somebody’s been pressuring Duke and Progress, the two utilities currently maybe merging, to buy Summer.

John D. Runkle, attorney for NC WARN, hand-delivered a letter to Robert Gruber Executive Director Public Staff of the NC Utilities Commission on 18 June 2012, Re: INVESTIGATION — Duke-Progress Merger

In preparing comments on the Duke-Progress merger on behalf of the NC Waste Awareness and Reduction Network (NC WARN), we came across several reports that South Carolina officials, including the South Carolina Public Service Commission, were pressuring the utilities to purchase the State-owned Santee Cooper’s shares of the V.C. Summer Nuclear Generating Station.

Santee Cooper owns one-third of the present reactor and 45% of the proposed units 2 and 3. Based on the recent cost estimate of $9.8 billion, buying Santee Cooper’s share would add about $4.5 billion to the cost of the merger. But those are low-ball estimates; other nuclear units in the Southeast are projected to cost roughly twice as much. Realistically, purchasing Santee Cooper’s share would likely add much more to the cost of the merger.

We were unable to find any filings in either the South Carolina or North Carolina dockets regarding the V.C. Summer Station. If a purchase of nuclear units in South Carolina has been made a condition to the merger, it should be part of the public record, and not as some backroom negotiation.

I’d like to see that.

Even more I’d like to see this:

Continue reading

Live streaming of Public Service Commission Forum tonight

All candidates for the Georgia Public Service Commission at a forum tonight, 7-9PM 12 July 2012. GA PSC is the body that says Georgia Power can charge its customers for cost overruns for the new nukes at Plant Vogtle; the new nukes that will suck up even more water and are already sucking up lots of money through the stealth tax Construction Work in Progress (CWIP) charge on Georgia Power customer bills. GA PSC did require Georgia Power to buy 50 MW of solar, but that’s pennies compared to the dollars Georgia Power and Southern Company are shovelling into that pit by the Savannah River. Who will stand up and say enough nuclear is too much, and let’s get on with solar and wind?

Georgia Interfaith Power and Light blogged today, PSC Debate Tonight,

Tonight, GIPL is joining forces with 14 local organizations to host a Political Forum with this year’s candidates for the Public Service Commission.

We’re having technical difficulties with the live web stream. We hope it will be up and running tonight, but if not, the debate will be posted online this week. You can check this website tonight at 7pm for live web streaming, or watch our twitter feed @GeorgiaIPL for updates.

When: Thursday, July 12, 7 – 9 p.m.
Where:
Glenn Memorial UMC’s Auditorium/Sanctuary
1660 N. Decatur Road
Atlanta, GA 30307

All four challengers in the 2012 race have confirmed their attendance. Participants

Continue reading

AP nuclear slant through omission

What's missing in AP's reporting and analysis of nuclear cost overruns?

AP published this Tuesday, News Guide: Nuclear industry facing cost pressures, perhaps as a companion to its story of the same day, Building costs increase at US nuclear sites. Like that story, the news guide is full of accurate and useful information about nuclear cost overruns, and even this good bit of analysis:

Q: Why do building costs matter to customers?

A: Because customers ultimately pay for the construction costs as part of their monthly power bills. The more a plant costs, the more customers will pay.

Yep, Georgia Power customers are already paying through that stealth tax, the construction work in progress (CWIP) charge for new nuke electricity they won't get for years if ever.

Yet something is missing. Can you spot it?

Hint:

Q: How does that compare with building coal- or gas-powered plants?

Good question, and AP correctly answers that nuclear plants are far pricier than coal or gas plants.

But are those three the only sources of energy? Where is the comparison to solar and wind power?

Well, maybe AP won't do it, but here it is already, Georgia Power deploys 1 MW solar; could have done 330 MW by now. Short version: for less than the amount of federal loan guarantees for Plant Vogtle, Southern Company could have built Georgia more solar energy production per capita than Germany, the world leader, has.

Why are we letting Georgia Power and the Southern Company pour our money down that pit near the Savannah River when they could be spending it to deploy solar and wind for more jobs, energy independence, and more profit for Georgia Power and SO? Oh, and clean air and plenty of clean water, too.

-jsq

Unemployed need public transit to get to jobs: T-SPLOST doesn’t help

If you're unemployed, you may not be able to afford a car: then how do you get to work even if you can find a job? As our own Industrial Authority's Community Assessment of last October said, we need public transportation to promote business by getting employees to jobs. T-SPLOST doesn't do that: it would widen more roads and build no public transportation.

Peter S. Goodman wrote for Huffington Post today, Unemployment Problem Includes Public Transportation That Separates Poor From Jobs

CHATTANOOGA, Tenn. — In the two months since he lost his job driving a delivery truck for a door company, Lebron Stinson has absorbed a bitter geography lesson about this riverfront city: The jobs are in one place, he is in another, and the bus does not bridge the divide.

Stinson lives downtown, where many of the factories that once employed willing hands have been converted into chic eateries. The majority of jobs are out in the suburbs, in the strip malls, office parks and chain restaurants that stretch eastward. Most of this sprawl lies beyond reach of the public bus system, and Stinson cannot afford a car.

The report Janus Economic did for VLCIA 11 October 2011, Community & Economic Assessment: Lowndes County says:

There is a plan for a public transportation system in Valdosta-Lowndes County but it currently lacks funding for implementation. Under current budget constraints it will be difficult to implement such a project, but businesses in the industrial parks and outlying areas may want to implement a limited transportation system if they discover that employee attendance is an issue.

That would be the plan for $7.5 million for a four line bus system that got cut first pass from the T-SPLOST project list, while widening a few miles of Old US 41 North got raised from $8 million to $12 million and is still in the final list.

T-SPLOST would promote more sprawl of exactly the kind we don't need. Let's not do that.

-jsq

Southern Co. nuclear cost overruns expected? Let’s build solar and wind on time and on budget!

So if Southern Company expected cost overruns at Plant Vogtle, why didn’t they make a better estimate in the first place? What incentive do they have not to continue running up the cost and delaying completion, since they get to keep charging Georgia Power customers for construction, including for cost overruns, while floating $8.3 billion in federally guaranteed loans? Where is the financial integrity in all that?

AP reported yesterday, and even Fox News carried it, Building costs increase at US nuclear sites. They’re not talking about housing prices near the sites, either.

America’s first new nuclear plants in more than a decade are costing billions more to build and sometimes taking longer to deliver than planned, problems that could chill the industry’s hopes for a jumpstart to the nation’s new nuclear age.

Licensing delay charges, soaring construction expenses and installation glitches as mundane as misshapen metal bars have driven up the costs of three plants in Georgia, Tennessee and South Carolina, from hundreds of millions to as much as $2 billion, according to an Associated Press analysis of public records and regulatory filings.

Those problems, along with jangled nerves from last year’s meltdown in Japan and the lure of cheap natural gas, could discourage utilities from sinking cash into new reactors, experts said. The building slowdown would be another blow to the so-called nuclear renaissance, a drive over the past decade to build 30 new reactors to meet the country’s growing power needs. Industry watchers now say that only a handful will be built this decade.

“People are looking at these things very carefully,” said Richard Lester, head of the department of nuclear science and engineering at the Massachusetts Institute of Technology. Inexpensive gas alone, he said, “is casting a pretty long shadow over the prospects” for construction of new nuclear plants.

AP continues with a list of late and over-budget nuke projects, including Southern Company’s Plant Vogtle $800 million over and seven months late, TVA’s Watts Bar plant $2 billion over and 3 years late, Duke’s Plant Summer SCANA and Santee Cooper’s Summer Station $670 million over and a year late.

Southern Co. and others in the nuclear business say cost overruns are expected in projects this complex…

So why are they wasting our money on nukes when they could be deploying a lot more solar and wind on time and on budget?

…and that they are balanced out by other savings over the life of the plant. Southern Co. expects Plant Vogtle will cost $2 billion less to operate over its 60-year lifetime than initially projected because of anticipated tax breaks and historically low interest rates.

Get that? “anticipated tax breaks” that leave we the taxpayers Continue reading

SPLOST, LOST, TSPLOST Forum: Tuesday, July 10

The Chamber is holding a T-SPLOST event tonight. According to the announcement:

Make Sense of the 1 Cent Tax and know before you vote. Valdosta Lowndes Industrial Authority to host TSPLOST, LOST and SPLOST Forum for Young Professionals providing an opportunity for an informative discussion regarding the upcoming referendum.TSPLOST Referendum

Presenters at the forum will be Mayor John Gayle (City of Valdosta), Larry Hanson-City Manager (City of Valdosta), Andrea Schruijer (Valdosta Lowndes Industrial Authority) and Caitlyn Cooper (ConnectGeorgia).

At this forum YPs are encouraged to exchange and share ideas, questions and concerns about the legislation above. Leave more informed as a knowledgeable voter regarding the upcoming referendum on July 31. Please join other YPs in a supportive setting to listen, learn and voice your opinions.

LOCATION:

bas bleu
123 N. Patterson Street.
Valdosta, Ga 31601

TIME:

5:30 to 6:30 p.m.
Click here to RSVP or call 229-247-8100
*Drinks and menu items available

Of these speakers, Mayor Gayle is famously for T-SPLOST, Larry Hanson previously appeared to be against it. I don't know Andrea Schruijer's position on T-SPLOST. ConnectGeorgia is pro-T-SPLOST, so presumably Caitlyn Cooper is, too. So this is likely to be a pro-T-SPLOST forum.

In any case, remember T-SPLOST is on the primary ballot for 31 July 2012, and early voting has already started, so you can vote on it today.

-jsq

Budget, boards, and abandonment @ LCC 2012-06-26

The Lowndes County Commission appointed people to four boards, approved a budget for next fiscal year, made some unspecified changes to this year’s budget, and demonstrated they could both stop speeding traffic on a rural road and put a cap on a construction contract! All this in one meeting, their Regular Session of 26 June 2012.

Here’s the agenda. Here are videos of the previous morning’s Work Session. And here are videos of the 5PM (actually 4:57PM) budget hearing.

Here’s a video playlist:

Budget, boards, and abandonment
Regular Session, Lowndes County Commission (LCC),
Video by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE), Valdosta, Lowndes County, Georgia, 26 June 2012.

-jsq

Closing one end of Brinson Drive to stop speeders @ LCC 2012-06-26

Closing one end of a dirt road to stop speeders: it turns out the county can do that, after all! And it’s a popular thing to do.

One spoke against, but changed to be for. Three others spoke for. The agenda item at the 26 June 2012 Regular Session of the Lowndes County Commission was

7. Public Hearing: Abandonment of a Portion of Brinson Drive
  • John L. Lewis who lives in Lanier County but owns property at 4718 Brinson Road spoke against closing Brinson Drive. County Engineer Mike Fletcher clarified that they weren’t closing the whole road; they were abandoning a portion of it near Pikes Pond Road, making Brinson a dead end to stop speeding through traffic. Lewis seemed mollified.
  • Richard Rigby spoke for the closing of Brinson Road, saying it was the greatest thing the Commission had done in the last ten years, other than keeping Haunted House Road open.
  • Amanda Parker spoke for closing Brinson Drive; she lives on Oak Hill Drive at the end of Brinson and almost got run over that morning.
  • Loretta Steed spoke for closing Brinson Drive; she lives on Pikes Pond Road near one end of Brinson. She said she had been against the closing until she learned from Rigby that the county was keeping Haunted House Road open. Instead she wanted to know how it would be closed so as to stop the speeders from getting on it. Chairman Paulk said a culvert would be removed.
  • Commissioners voted unanimously to close one end of Brinson Drive.

Three years ago in a similar situation, the county insisted on paving Quarterman Road instead. Quarterman Road, which, unlike Brinson Drive, doesn’t even go anywhere. Paving resulted in speeders and drag racers through a residential neighborhood. As resident Carolyn Selby put it:

You designed a mile and a half straight-away, and they have come. Welcome to the Quarterman Road Drag Strip!

The county continues to insist speed humps are out of the question. It’s good to hear Commissioners have become concerned about safety somewhere in the county.

-jsq

Mickey Tillman recognized @ LCC 2012-06-26

As an unscheduled item at the 26 June 2012 Regular Session, Lowndes County Chairman Ashley Paulk and County Manager Joe Pritchard recognized the many years of service of Mickey Tillman. Here's an excerpt from what Joe Pritchard said:

Mickey was hired in 1975. Lowndes County was referred to as the Commission of Roads and Revenue. and the county had a population of approximately 60,000 people and was served by 150 employees. Today of course Lowndes County serves nearly 110,000 citizens with an employee base of 575. Mickey has been a part of this historical growth and he has been instrumental in the early development of several key services that continue to meet the needs of the citizens today.

Then the Commissioners posed for photographs with Mickey Tillman.

Here's the video:

Mickey Tillman recognized
Regular Session, Lowndes County Commission (LCC),
Video by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE), Valdosta, Lowndes County, Georgia, 26 June 2012.

-jsq

Started early, no new information, no questions: Second and final budget hearing @ LCC 2012-06-26

Your last chance to hear about the budget for Lowndes County was 26 June 2012, just before the Commission’s Regular Session. It went really fast; even faster than the first budget hearing. And, as you can see, this second hearing started three minutes early: 4:57 Eastern, before the public notice time of 5PM.

Here’s the actual budget. In this second hearing, Finance Director Stephanie Black sped through her slides, so for more explanation see the videos the first budget hearing. This time she did allude to a budget adjustment coming up in the immediately-following Regular Session, but she didn’t say what it was. The second time she mentioned it, she said “We’ve received some information” about a revenue reduction, but she didn’t say what that information was. Commissioners either already knew what it was, or didn’t care, because nobody asked any questions. It’s almost like the Commission doesn’t want us knowing what they’re thinking of doing with our money until they’ve already decided.

See also the previous post about Public Works expenditures.

Here’s a video playlist:

Second and final budget hearing, Lowndes County Commission (LCC), Valdosta, Lowndes County, Georgia, 26 June 2012
Videos by Gretchen Quarterman for Lowndes Area Knowledge Exchange (LAKE).

-jsq