Videos: Water treatment upgrade because GA-EPD Consent Order, Lift Station Pump Repair, Condemnation along Twin Lakes Road, VAWA, Extension Office, Red Cross @ LCC Work 2026-01-26

The longest items at the Work Session this morning were 11 minutes of 6.a. Extension Office Update By Joshua Dawson and 8 minutes of 6.b. American Red Cross Update By Jacqueline Shoemaker.

If you weren’t there, you can only see them here in these LAKE videos, since the Lowndes County Commission does not publish videos of its Work Sessions.

They vote tomorrow evening at 5:30 PM, on spending $214,412.00 on the Spring Creek plant and $24,400.00 on a sewage pump repair at the Peterson Road Lift Station.

If they don’t make a deal before then, they’ll vote on paying $12,400.00 as a condemnation price to get some road and drainage right of way along Twin Lakes Road.

Plus there’s $26,371.00 cash match for a VAWA grant.

Other items include a resolution to sell surplus water meters and a Special Assessment Rate for 2026.

[Collage @ LCC Work 26 January 2026]
Collage @ LCC Work 26 January 2026

Below are links to each LAKE video of each agenda item, with a few notes by Gretchen Quarterman, followed by a LAKE video playlist.

See also the agenda and the board packet, received in response to a LAKE video playlist, and available on the LAKE website.

If you wonder why Lowndes County does not put its own board packets on its own website, maybe you’d like to ask them that.

Here is the LAKE video playlist:
https://youtube.com/playlist?list=PLshUv86fYkiHAmxmLAa7L1RAJjekEgvXM&si=eQAbXIhQ7JryK3Ge

-jsq

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!
http://www.l-a-k-e.org/blog/donate

One thought on “Videos: Water treatment upgrade because GA-EPD Consent Order, Lift Station Pump Repair, Condemnation along Twin Lakes Road, VAWA, Extension Office, Red Cross @ LCC Work 2026-01-26

  1. Pingback: Packet: Water treatment upgrade because GA-EPD Consent Order, Lift Station Pump Repair, Condemnation along Twin Lakes Road, VAWA, Extension Office, Red Cross @ LCC 2026-01-26 | On the LAKE front

Leave a Reply

Your email address will not be published. Required fields are marked *