Tag Archives: Baxley

Solar Baxley City Hall



Baxley City Hall has solar panels, in Appling County, home to nuclear Plant Hatch.
Why?
The solar installation will
generate most during the most expensive electrical power times of the day;
it will pay for itself in ten years,
and it’s lower power bills from then on.
Baxley City Council approved the project unanimously in December,
to be paid for out of reserves with no financing,
and the solar system is already installed and working.
Any local city or county hereabouts could do the same thing.

Renee O’Quinn wrote for the Baxley News-Banner 19 December 2012,

City approves installation of solar panels at City Hall
,

Continue reading

Another rat at Fukushima: cooling down third time in five weeks

It doesn’t take a tsunami to take down Fukushima: rats can do it repeatedly.


Mainich.jp
, and

Google Translate version
,

Inspection and rat carcasses found cooling system stop: Unit 2 Fukushima Daiichi nuclear power plant


(23 minutes 15:22 April last update) 01 minutes 13:22 April Mainichi Shimbun in 2013




From state = Fukuichi live camera of Fukushima Daiichi nuclear power plant of 50 at around 2:00 pm

The 22nd, TEPCO announced that it had stopped the cooling system of
the spent fuel pool of Unit 2 Fukushima Daiichi nuclear power plant.
Since the corpse of two dogs rat is found inside the transformer in
the outdoors, I will check the equipment.

According to the Nuclear Regulatory Agency and Tokyo Electric Power,
15 at around 10:00 am the same day, workers found a dead rat in the
two animals terminal near the pool cooling transformer inside.
Remove the mouse, stop the power for inspection of equipment 35 at
around 11:00 the same. expected start is 3 to 4 hours later.

Water temperature of the pool of power stop time is 13.9 degrees.
There is enough time to rise up to 65 degree of operational safety,
TEPCO has “no problem. Administrative stopped just in case for
inspection” he said. [Torii true flat]

Reuters’ version,

Fukushima nuclear cooling system offline for 3rd time in 5 weeks
,
adds:

Last month, a 29-hour power supply halt affecting nine facilities,
including four spent fuel pool cooling systems, was caused by a rat
touching exposed wires in a temporary switchboard, triggering a
circuit breaker.

In early April, the No.3 unit’s spent fuel pool cooling system
stopped, after workers appeared to have had inadvertently caused a
power outage when they were trying to install a net to keep small
animals from crawling into the reactor building. (Reporting by Risa
Maeda; Editing by Chris Gallagher)

Apparently that net didn’t work.
Should we trust our safety to nuclear plants that can be shut down by rats?
The

tritium-leaking

reactors at Plant Hatch at Baxley

are the same design as at Fukushima
.
Former U.S. NRC Chairman Jaczko says

we should phase them all out
while
former Indian Atomic Energy Regulatory Board Chair Gopalakrishnan says the reactors currently building in India, already three years behind schedule and now found to incorporate numerous defects and deficiencies amid gross lack of transparency, must be stopped.
We know a better way:
solar and wind power.
Let’s get on with that.

-jsq

Owed to Masaichi Shiozaki.

Calculate how much Vogtle is costing you —Mandy Hancock

Received yesterday, related to

Georgia Power forges ahead with expensive nukes
.
-jsq

For those of you concerned about nuclear energy, here are some quick, meaningful actions you can take today.
Maybe you aren’t concerned about nuclear energy. I bet you ARE concerned about $$$$.

Learn more
about how Georgia Power is getting your money at the state and federal
level. All US taxpayers all over the US are basically cosigning a loan for
$8.3 B
for the Vogtle reactors. Simultaneously, Georgia Power is raising
your electric rates to fund the pre-construction costs by pulling the same
advanced cost recovery scheme as SC and FL. You can learn more about the
controversy surrounding the loan guarantees

here



Calculate how much Vogtle is costing you on your monthly bill

(Look for “Nuclear Construction Cost Recovery Rider:”)

-Mandy Hancock

He is in the business of selling energy, not saving it. —Michael G. Noll

Received yesterday on

Georgia Power forges ahead with expensive nukes
. -jsq

Thanks for posting this John!

Mr. Bowers’ visit and his comments are almost comical, particularly his
quote that “the government is stimulating for renewables to give them a
running chance but, when you remove them, the question is can they run
on their own two feet?”



A good question! Fact is that neither coal nor nuclear would be able to
“run on their two own feet” if it wasn’t for the large subsidies both have
received for decades. Now these are nicely hidden subsidies so that the
average consumer thinks he is getting a bargain, without realizing that it
is us, the consumers, who have actually paid for this “inexpensive rate”.

At the same time truly renewable and clean energies

Continue reading

Georgia Power forges ahead with expensive nukes

Would you buy two new nukes from a company that ran over budget by a factor of 13 last time it built nuclear reactors at the same site? When one of those reactors got shut down for days
a couple mnths ago? When another reactor even closer to us was discovered leaking radioactivity into our aquifer?
A company that got the state to agree it could keep all its profit and socialize any cost overruns by passing them on to you, the customers? Well, Georgia Power CEO Paul Bowers thinks you should trust such a company to build nukes for gapower’s profit you!

Today in the VDT David Rodock wrote,

Georgia Power discusses nuclear, solar, energy costs



Georgia Power president and CEO Paul Bowers visited Valdosta late last
week to talk nuclear energy, solar and what the company has been doing
to cut energy costs for their customers.

Yet another dignitary visits without telling the public first.

Anyway, much of the story is about how cost-effective and safe

Continue reading