Category Archives: Lowndes County Commission

Videos: Two rezonings and a lease @ LCC 2013-03-11

A surprising number of questions were asked by Commissioners at yesterday morning’s Work Session, yet still nobody asked about the well near one of the proposed rezonings. We had a microphone failure during the first few items; sound picks up as the Commissioners start asking questions on 5.b. REZ-2013-04. Because of the sound glitch you can’t tell that for sure from the videos that nobody discussed SPLOST, but Gretchen was there from call to order to adjournment, and she didn’t hear anything about SPLOST. Maybe they’ll say something about it tonight at their 5:30 PM Regular Session, at which they vote on these rezonings and contract.

Here’s the agenda with links to the videos and some notes.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, MARCH 11, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, MARCH 12, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

SPLOST deal?

All over the news today: Lowndes County Chairman Bill Slaughter on radio 105.9 this morning; Lowndes County Board of Commissioners and Valdosta City Council reach a SPLOST deal (VDT).

The Lowndes County Board of Commissioners and the City of Valdosta reached an agreement Monday on how to divide the seventh cycle of the Special Purpose Local Option Sales Tax, which both entities will push to appear for a second time on November ballots after its defeat in 2012.

Last week, the city requested that State Rep. Amy Carter withdraw the bill that would have allowed Valdosta to put a MOST or Municipal Option Sales Tax on the ballot, which would have earned a penny in sales tax for the city, who would not be required to share that money with Lowndes County or other cities.

After negotiations over the phone and via email, County Commission Chairman Bill Slaughter and Mayor John Gayle signed an official agreement for SPLOST VII Monday afternoon.

How could this be?

Continue reading

Florida sink hole evicts church

More sinkholes in Florida in the same Floridan Aquifer that’s under us, this time evacuating a church. Maybe sinkhole safety should be important here, too.

WCTV carried an AP story today, Suspected Sinkhole Forces Church Move

Pastor Rick Shuck told WBBH in Fort Myers on Monday the sinkhole has caused uneven floors, cracks in the walls and a hole in the ground so large that a landscaper fell into it.

Shuck says they had to end Faith Community Church’s Sunday service early because “it’s just not safe anymore.” He says some cracks in the walls are a half-inch wide and part of the auditorium floor has dropped about 4 1/2 inches.

Geological engineers say it’s definitely a sinkhole. But the church’s insurance company sent engineers who determined there is no problem. So next month the two sides are heading to mediation.

That second picture above was taken in Lowndes County, showing printouts of analysis by a VSU professor of sinkholes under a yard in Lowndes County. And they’re under Michael McCormick’s shed (see picture on the right), and they’re in his garage.

The same Floridan Aquifer is underground here as in Florida. Perhaps something needs to be done about sinkholes right here in Lowndes County?

-jsq

Scorecard on Internet and Energy at the Bird Supper

Gretchen Quarterman, Dexter Sharper, Bill Slaughter, and others at the Bird Supper in Atlanta

On the 27th of February I posted Internet and Energy at the Bird Supper and Gretchen and I went to the Bird Supper in Atlanta and discussed those four bills with legislators. Our local elected officials were lobbying on the same side of many of the same bills. It’s past crossover day now, when bills are supposed to be approved by one house of the Georgia legislature in order to be taken up by the other. How did that come out? We all beat the mighty telcos and cablecos on two bills! But Georgia Power is even mightier, and won on two bills. Plus one legislator’s name is connected with 3 out of 4 of those bills. And our local delegation cancelled itself out on the one vote that actually went to the floor.

Internet Access: help stop two telecommunications bills

The local Industrial Authority, Chamber of Commerce, Valdosta City Council, and Lowndes County Commission have recently realized that fast Internet access is essential to attract businesses, for their employees to work at home, for applicants to apply for jobs, for students to submit assignments, and for general quality of life. And there’s good news from the legislature!

Continue reading

Agenda: Two rezonings and a lease @ LCC 2013-03-11

REZ-2013-03 Rezoning for Jeremy Valler, Knight s Academy Rd. R-21 to R-A, Well/Septic, ~10.4 Five minutes, or maybe ten each for Monday’s Work Session and Tuesday’s Regular Session of the Lowndes County Commission?

Here’s the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, MARCH 11, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, MARCH 12, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    1. Work Session — February 25, 2013
    2. Regular Session — February 26, 2013
  5. Public Hearings
    1. REZ-2013-03 Rezoning for Jeremy Valler, Knight’s Academy Rd. R-21 to R-A, Well/Septic, ~10.4 acres
    2. REZ-2013-04 Doug Thompson Property, 3432 Bemiss Rd. C-H (conditional) to C-H, Comm. Well & Comm. Sewer, 1.28 acres
  6. Bid — Land Application Site (LAS) Farm Lease
  7. Reports-County Manager
  8. Citizens Wishing to be Heard Please State Name And Address

-jsq

Sinkholes in Florida, and in Lowndes County, Georgia

The sinkhole that formed under a man’s bed and pulled him in has made a lot of news in Florida, plus another one a few miles away. But the news seems to neglect why those sinkholes are forming. Could it be the same reason sinkholes are forming in Lowndes County, Georgia? And will the Lowndes County Commission do anything about that before we see news about somebody here falling into a sinkhole?

Will Hobson, Laura C. Morel and Jodie Tillman wrote for the Tampa Bay Times 1 March 2013, Seffner sinkhole 911 call: ‘Bedroom floor just collapsed’,

Jeremy Bush just went to bed when he heard what sounded like a car hitting the house. Then screams from his brother Jeffrey’s bedroom.

“Help me! Help me!”

Someone flipped the lights. Jeremy, 36, threw the door open, revealing a sight that defied belief: The earth had opened beneath his brother’s bedroom and was swallowing everything in it. The tip of Jeffrey’s mattress was the only thing left, and it was sinking into a churning sinkhole.

The Tampa Bay Times has a long series on what happened afterwards, rescue workers who didn’t find him, the demolition of the house, objects found, etc. They never quite get around to saying why the sinkhole was there. They first say (Shelley Rossetter 2 March 2013),

Continue reading

The rest of the story on waste water —Tim Carroll

Received today from Valdosta City Council Tim Carroll, who sent it to a long list of people, apparently responding to the VDT's recent article and editorials.

All,

During my tenure as a city councilman, I have tried to keep everyone updated on events and issues with our city. I want to share and email I sent out recently that hopefully you will agree is important information. In regards to today's paper — the story has some serious errors and omissions. First of all in 2009- all we saved from the flood was the pump station. No sewage treatment was taking place and contrary to what the VDT says, then as we are now — raw sewage was going into the river. It lasted about a month in 2009. With the decision to pull equipment/tanks etc so they would not be destroyed this year — we not only saved a lot of tax payer money….but we will be able to bring the plant back on line in about a week. Reducing by several weeks the amount of sewage going into the river. In regards to city water systems being compromised — considering our water plant is 10-15 miles north of the WWTP and the amazing fact that the river flows south — your water is completely safe. Do we like discharging raw sewage into the river? Of course not. During the flood it was going to happen either way.

I want to add one other note — the men and women in our Utility department, fire, police, sanitation, engineering etc, etc Floridan Aquifer have been working long days this past week trying to manage flooding issues. They deserve our thanks. It is very frustrating for those whose homes and businesses were threatened by the flood. It is very frustrating to our city employees who have worked so hard to manage this crisis.

So as Paul Harvey says — “here is the rest of the story”.

I think Council Carroll is a bit cavalier about the city's wells being upstream of the wastewater treatment plant, because while the river may flow south, it's not clear how the Floridan Aquifer flows, especially with multiple 800 foot deep wells sucking water out of it. Also I wonder what people downstream of the Withlacoochee Wastewater Treatment Plant think of all that raw sewage coming down at them, especially considering some of them have wells downstream.

However, he makes a number of points that the VDT omitted, including a plan to do something about the situation, and appended is his "rest of the story".

Continue reading

VDT v Valdosta Re Wastewater

The VDT has apparently decided the City of Valdosta is to blame for the Withlacoochee Wastewater Woes, and has made its case in a story and two editorials. They seem to have forgotten about the overflow in 2012 already. And the VDT seems to have forgotten about it and its editor's own apparent roles in the loss of the recent SPLOST election that would have funded a new wastewater plant.

Jason Schaefer wrote for the VDT today, Money saved at river's expense: EPD investigates cause of sewage release as waters recede,

When the flooding occurred in April 2009, the City made extraordinary efforts to hold back the flooding, bringing in dirt and heavy machinery to build a berm around the influent pump station and other treatment equipment, working round the clock.

The efforts were successful. The treatment plant remained on during the duration of the flood, and Valdosta's raw sewage remained contained, though the facility incurred damages to its electrical and biological purification systems, according to Utilities Director Henry Hicks.

This year, the City opted for a different approach—cut electricity to the underwater portions of the plant, submit to the flooding and clean up afterwards.

The plant was “taken offline” Thursday at 9 a.m. “to prevent further damage to equipment and associated electrical and control systems,” according to a statement issued by the Department of the City Manager.

The City stated that as a result of the shutdown, “untreated sewage will be discharging directly into the river” at a rate of between five and six million gallons of raw sewage per day.

In addition, the floodwaters were allowed into the plant and around the remaining portions of the berm that was constructed in 2009 during the rising flood. Only half of the berm now remains, as the other half was removed to allow access to the lower portions of the plant, Hicks said.

So far, this year's response strategy seems to have saved the City money. In 2009, about $500,000 was spent in manpower, equipment and supplies to build the berm alone, and the plant, kept running, incurred significant damages though raw sewage was kept out of the river. This year, the money was not spent on the berm or to prevent the flooding, and at least 15 to 20 million gallons of raw sewage will have been released into the Withlacoochee by the time the plant is back online.

There's more in the story, which is well worth a read. Also note this inserted in the middle of the story:

Editor Kay Harris contributed to this story.

The VDT cites the EPA report, National Enforcement Initiative (FY 2011 – 2013) Keeping Raw Sewage and Contaminated Stormwater Out of Our Nation’s Waters, (more about that EPA initiative here) and continues:

Continue reading

Videos of the Withlacoochee River in flood

Here are pictures and videos of the Withlacoochee River at GA 122 18 Feb 2013 Withlacoochee River @ GA 122 27 Feb 2013 Withlacoochee River @ GA 122 on 18 February 2013 (on the left when the river was rising) and 27 February 2013 (on the right, when it was clearly in flood stage).

Pictures and videos of the Withlacoochee River at GA 122 by John S. Quarterman and Gretchen Quarterman for WWALS Watershed Coailition.


Brandon Powers for the VDT
And the Valdosta Daily Times has discovered video! VDT posted 25 February 2013, The effects of rain, which includes video of numerous locations around Lowndes County. This is all relevant to the Withlacoochee Wastewater Woes for Valdosta and Lowndes County.

-jsq

Withlacoochee Wastewater Woes for Valdosta and Lowndes County

AP picked up the story about flooding at Valdosta's Withlacoochee wasterwater treatment plant, citing the VDT and the City as sources. The City of Valdosta thinks the County should contribute to replacing the plant, or maybe the legislature will authorize a municipal option sales tax (MOST).

AP in GPBNews 1 March 2013, Valdosta Treatment Plant Floods,


Authorities shut down a Valdosta wastewater treatment plant as a river flooded critical buildings and structures. The city estimates an average of 5 million to 6 million gallons of untreated sewage will discharge daily into the Withlacoochee River until the flood waters recede and the plant can resume operation. (Photo Courtesy of John S. Quarterman via Flickr.)
VALDOSTA, Ga. —

Authorities shut down a south Georgia wastewater treatment plant as a river flooded critical buildings and structures.

Valdosta city officials said power at the plant was shut down Thursday to prevent further damage to equipment and control systems.

The city estimates an average of 5 million to 6 million gallons of untreated sewage will discharge daily into the Withlacoochee River until the flood waters recede and the plant can resume operation.

The AP story continues, but let's cut to the sources.

Continue reading