Tag Archives: Planning

New Commission meets Monday morning and Tuesday evening @ LCC 2013-01-07


Pictured: newly elected Commissioners
Page, Evans (re-elected), Slaughter, and Marshall

The Industrial Authority wants to buy some unspecified property
public defender needs renewing,
plus 4-H agent and school bus activity.
Also workers’ compensation,
and the Commission needs to approve its own schedule,
since it’s a new Commission now, with two more voting members than
last year, and a new Chairman.

Here’s

a list of the current Commission members:

  • Bill Slaughter, Chairman, At-Large
  • Joyce E. Evans, Commissioner, District 1
  • Richard Raines, Commissioner, District 2
  • Crawford Powell, Commissioner, District 3
  • Demarcus Marshall, Commissioner, District 4
  • John Page, Commissioner, District 5

Their

Commission web page

still has at the top this mission statement:

“To provide an efficient, effective and responsive local government
to all citizens of Lowndes County while maintaining the financial strength
to meet any contingency”

The county government has apparently been pretty good about that last thing
(although

that $8.9 million discrepency
could make some wonder).
On responsiveness, not so much, considering

the trash non-solution
railroaded through at the last meeting
of the previous Commission.
Maybe this new Commission will be different.

Here’s
the agenda.

-jsq

LOWNDES COUNTY BOARD OF COMMISSIONERS

PROPOSED AGENDA

WORK SESSION, MONDAY, JANUARY 7, 2013, 8:30 a.m.

REGULAR SESSION, TUESDAY, JANUARY 8, 2013, 5:30 p.m.

327 N. Ashley Street — 2nd Floor

Continue reading

Substandard fire protection at nuclear Plant Hatch?

Does Hatch nuclear Unit 1 have substandard fire protection, like
many reactors built before 1975?
Protection against fires that the NRC says cause about half
the core damage risk, such as at Fukushima, which is the same
design as Hatch?

According to Simplyfy.org 2 Jan 2012,

Fire Risk At Older Japan Reactors Shows Potential Worldwide Problem
,


The [Japanese Nuclear Regulatory Authority] NRA announced recently that
reactors built before 1975 likely have sub standard fire protection
designs. This includes having important cables coated in fire resistant
insulation, isolating and protecting cables and creating barriers to
prevent fires from spreading to other areas of critical equipment.


Source:
The Mainichi, 1 Jan 2013,

Over 10 nuclear plants in Japan have flawed fire-prevention equipment: sources
.



What else was built before 1975?
Plant Hatch Unit 1

“Operating License: Issued – 10/13/1974”
,
according to the U.S. NRC.

100 miles from here,

and the same design as Fukushima.

DOE also instituted upgrades and changes to their reactor facilities
which included facility modifications as a result of Browns Ferry
fire. Private sector nuclear power reactors in the US are not all
fully up to the newer rules. The NRC has issued a number of
exemptions that watchdog groups have criticized as being unsafe.
Browns Ferry still does not meet the NRC fire rules for cables. 47
of 52 reactors in the US still do not comply with the 1980 fire
regulations.

Plant Hatch is privately owned and operated.
Has it been upgraded?

Continue reading

Carbon bubble? Solar and wind erode coal, gas, and biomass credit quality —Moody’s



In Europe it’s already happening: solar and wind are causing
bond-rater Moody’s to warn of downgrades of energy companies
that depend on heat from burning coal, gas, or biomass.
Moody’s earlier even warned the Bank of England
of a potential carbon bubble developing.
If combustion energy plants are affected like this,
the credit effects will be even bigger on even-more-expensive
nuclear plants, which Moody’s called a

bet-the-farm risk
way back in 2009.

James Murray wrote for businessGreen 6 Nov 2012,

Moody’s: Renewables boom poses credit risk for coal and gas power plants:
Credit ratings agency warns increases in renewable power have had ‘a
profound negative impact’ on the competitiveness of thermal
generation companies
,

“Large increases in renewables have had a profound negative impact
on power prices and the competitiveness of thermal generation
companies in Europe,” said Scott Phillips, an assistant vice
president and analyst at Moody’s Infrastructure Finance Group, in a
statement.

“What were once considered stable companies have seen their business
models severely disrupted and we expect steadily rising levels of
renewable energy output to further affect European utilities’
creditworthiness.”

And not just rising, rising increasingly

Continue reading

Net zero school in Bowling Green KY



Why stop with
solar Lowndes High or VHS?
Why not have all our elementary and middle schools
generate more solar electricity than they use, and
change their power bills into profits to help pay for education?
A school in Bowling Green, Kentucky is already doing that.

Chuck Mason wrote for bgdailynews.com 22 December 2012,

‘Net-zero’ school pays off
,

The district received a check for $37,227.31 this year. The
Tennessee Valley Authority paid the school district for electricity
it generated. The school district doesn’t have a power plant, per
se, like the utility company. But it does have an energy producer,


the first “net-zero” school in the nation: Richardsville
Elementary School.

The check is tangible evidence that net-zero pays for itself and
then some.

“It has exceeded expectations. We’re seeing a savings of
millions of dollars in energy costs,” state Rep. Jim DeCesare,
R-Bowling Green, said of the net-zero schools concept developing
across the nation.

This is the same Bowling Green, Kentucky that has fast Internet access.
Maybe that’s another reason

the Chamber might want to consider comparing Bowling Green and Warren County
to here.

-jsq

Florida Crystal River nuke down $5 billion?



Only
160 miles from here,
the Crystal River nuclear reactor continues to run up a bad bill,
maybe as much as $5 billion,
and even other nuclear operators are reportedly starting to turn against it.
Should we wait for the new nukes on the Savannah River to run up a bill
that high before we cancel them?

Remember

back in May?

Florida is already experiencing a likely future for the new Plant
Vogtle nukes in Georgia: completion date pushed back, and customer
charges raised.

Yep, that’s the one.
And the bill keeps going up, as
Ivan Penn wrote for the Tampa Bay Times 30 December 2012,

Utilities nationwide could share the financial pain of the idled Crystal River nuclear plant
,

The crippled Crystal River nuclear plant is now America’s headache.

The bill to fix it and pay for replacement power may top $5 billion.
The problem?

The company that insures all 104 U.S. nuclear power plants has just
$3.6 billion on hand to pay for claims.

Broken nuclear plants in California, Texas and Michigan will vie for
some of that money. But Crystal River alone represents such a
financial threat that the insurance company, Nuclear Electric
Insurance Ltd., may demand that its member utilities pony up more
money.

Is NEIL the guarantor on the bonds for the new nukes at Plant Vogtle?
I think Southern Company was smarter (for SO, not for us)
and

got Congress to guarantee those.

If so,

Continue reading

Plant the seeds for viable water future

This AJC op-ed is about coastal wetlands, but
much of it applies to wetlands such as cypress swamps and streams
in Lowndes County and the rest of central south Georgia,
especially since

our state water plan for the Suwannee-Satilla Region

points us at

County-Level Population Projections from the Governor’s Office of Planning and Budget

that project 45% growth in Lowndes County population in 20 years to 156,650 people by 2030,
which means near doubling in 30 years to 2050. -jsq

David Kyler wrote for the AJC 29 December 2006,
“Plant the seeds for viable coastal future”,

Recent population projections for the Georgia coast issued by

2010-2030 Change in Population of Georgia Counties

Georgia Tech say nothing new. We’re growing at almost 20 percent a
decade, meaning a near doubling every 35 years.

The Center for a Sustainable Coast projected a population of about 1
million by 2030 for the 11 counties in the coastal region as defined
by the Department of Natural Resources, somewhat higher than the
844,000 predicted by Georgia Tech. This compares with a population
of 538,469 reported in the 2000 Census report.

But the accuracy of projections is not the point. Increased
population will result in more land clearing and environmental
disturbance than in the past—there will be larger homes,
bigger lots and fewer people per household.

National studies show up to twice as much land is

Continue reading

Solar cars and charging stations: who wouldn’t?

Tired of Southern Company CEO Fanning’s

maybe “next decade”
for solar power?


Tired of Georgia Power’s Bowers

trying to push solar off for fifty years?

Let’s hear from somebody who takes on big tasks and gets them done:
Elon Musk, who’s already built a rocket that is resupplying the International
Space Station, and who is also building all-electric cars.

Carl Hoffman wrote for Smithsonian magazine December 2012,

Elon Musk, the Rocket Man With a Sweet Ride

When he’s not launching rockets, Musk is disrupting the notoriously
obdurate automobile industry (see National Treasure, p. 42). While
industry giants like Chevrolet and Nissan and Toyota were dithering
with electric-gasoline hybrids, this upstart kid said he would
design and manufacture an all-electric car that would travel
hundreds of miles on a single charge. The Tesla Roadster hit the
streets in 2008 with a range of 200 miles, and the far more


functional Model S, starting at $57,000, was introduced in June.
It’s the world’s first all-electric car that does everything my old
gasoline version does, only better. The high-end model travels 300
miles on a single charge, leaps from zero to 60 in 5.5 seconds,
slows from 60 to a dead stop in 105 feet, can seat up to five, has
room for mulch bags and golf clubs, handles like a race car and its
battery comes with an eight-year, 100,000-mile warranty. If you
charged it via solar panels, it would run off the sun. One hundred a
week are being produced in a former Toyota factory in Fremont,
California, and nearly 13,000 people have put deposits on them….

And since that story:

Continue reading

Industrial Authority working for solar in south Georgia @ VLCIA 2012-12-18

The

Industrial Authority

is working to find locations for some of the
210 MW Georgia Power got the PSC to shift
from biomass to solar
back in September.
That’s a good next step.

Jason Schaefer wrote for the VDT 23 Dec 2012,

Solar power push has Authority working to establish connections
,

Since the Georgia Public Service Commission (PSC) approved Georgia

Allan Ricketts, Projects and Existing Industry Manager, VLCIA, 2012-12-18

Power Company’s plan Nov. 20 to add 210 megawatts of solar power to
its electrical grid, the Valdosta-Lowndes County Industrial
Authority has been devising strategies to draw solar energy
producers to South Georgia.

Georgia Power will issue a Request for Proposals (RFP) from solar
energy collection and production companies in early 2013, according
to the PSC, and the company will contract with the lowest bidders to
purchase their energy and place it on the Georgia Power electrical
grid for public consumption.

Georgia Power plans to add 90 megawatts to its grid from distributed
generation (small companies producing between 100 kilowatts and 1
megawatt), and 120 megawatts of large utility-scale projects
producing up to 20 megawatts each. The company plans to price the
solar energy at $0.13 per kWh for distributed generation and up to
$0.12 per kWh for utility-scale projects, according to the PSC.

This government-approved commercial push for solar energy could be a
boon to sunny South Georgia as well as the greater Valdosta area
specifically, and the Authority is prepared to accommodate the solar
energy producers they expect.


Andrew Schruijer, Executive Director, VLCIA, 2012-12-18

“I think there’s a very good possibility of solar energy
coming to South Georgia,” Executive Director Andrea Schruijer
said. “Possibly in the near future.”

There’s more in the VDT story.
It’s pretty much what
Col. Ricketts also told me after the VLCIA meeting Tuesday a week ago.
He asked me if I knew what “distributed” meant.
I pointed out Georgia Power’s version of distributed was actually not
very distributed, compared to

Continue reading

Fracking: coming soon to a state near you?

Lest you think fracking is something that happens only in faraway
places like

Alberta

or Pennsylvania,
look at
this map of North American shale gas basins,
extending right through the Appalachians from Pennsylvania through
West Virginia, Virginia, Tennessee, and North Carolina into Georgia, Alabama,
and Mississippi.


Source:

Canada fracking creates ‘test tube‘ residents in B.C., Alberta
,
by Lynn Herrmann for Digital Journal 5 January 2012.

How long before Georgia Power or Southern Company decide natural
gas would be even cheaper if they fracked in Georgia or Alabama or Mississippi?
How long until

unavoidable human error

starts fracking polluting our local groundwater and rivers?
For that matter, isn’t it bad enough already that other people’s
water is fracked for cheap gas in Georgia?

We could just

get on with solar power
,
which doesn’t spill.

-jsq

NRC says it’s “never been a practice” to show licensee documents to the public



After

Kendra Ulrich of Friends of the Earth asked

about some licensee documents related to last week’s
NRC hearing in faraway Maryland on restarting California’s
San Onofre nuclear reactor,
NRC’s
David Beaulieu expanded on NRC’s refusal to divulge the documents.

Here’s

the video:


Video by Myla Reson at NRC, Maryland, 18 December 2012.



You can hear him say it’s “never been a practice” to let the public
see licensee documents. But if they’re being used in making a license
decision, why doesn’t that make them public documents accessible by the
public? Oh, right “it’s very complex” but “it’s a yes or no question”
and “I will assess”, he says. It’s good to be king!

I wonder if the public had some assurance of
transparency maybe the NRC wouldn’t get

so many FOIA requests?

Remember, this is the same NRC that gave

100-mile-from-here same-design-as-Fukushima
Plant Hatch

a

20 year license extension,

and the same NRC

that gave Plant Vogtle a clean bill of health
at a public meeting two days before Unit 1 shut down,

and the same NRC that could stop the new nukes there

even if the GA PSC won’t.

What if we deployed solar power instead, on budget and on time?

-jsq