Tag Archives: HAVLC

Videos: Comprehensive Plan, rezonings, tower, Hospital Authority, elections @ LCC 2021-11-09

All the main items breezed by unanimously, including the Comprehensive Plan and the Hospital Authority re-appointment of Ben Copeland, at the Lowndes County Commission Regular Session, November 9, 2021.

The only things taking longer than three minutes were the County Manager’s Report and Citizens Wishing to Be Heard about how the Board of Elections is appointed and funded.

[Comprehensive Plan, Communications Tower, Manager's Report, Electios]
Comprehensive Plan, Communications Tower, Manager’s Report, Electios

Below are LAKE videos of each agenda item with a few notes, followed by a LAKE video playlist. See also the LAKE videos of the previous morning’s Work Session, the agenda and Board packet, and, for the rezonings and the tower, the LAKE videos of the preceding Planning Commission meeting.

For the Comprehensive Plan, see also the LAKE videos of the preceding Comprehensive Plan Update Meeting 2 and the Character Area Maps for it, the Lowndes County Commission Regular Session before that, and the quite lengthy first Comprehensive Plan Public Hearing.

Videos: One Valdosta-Lowndes, Troupville River Camp, Hospital Authority re-appointment, Godfrey rezoning, VAWA staffing @ LCC 2021-11-08

By far the longest item at 33 minutes at the Lowndes County Commission Work Session was a presentation about One Valdosta-Lowndes (OVL).

[OVL River Camp, Hospital Authority appointment, Godfrey rezoning, VAWA staffing]
OVL River Camp, Hospital Authority appointment, Godfrey rezoning, VAWA staffing

Second longest at almost five minutes was 8.e. Request For Cash Match Increase For VAWA ASG Salary Supplement, about the Violence Against Women Act. Third at four minutes was 7.c. REZ-2021-24 Barry Godfrey, Mt. Zion Church Road.

The likely re-appointee to the Hospital Authority did attend.

Everything else got little discussion, including the final approval of the Comprehensive Plan Update.

They voted the following Tuesday evening.

Below are LAKE videos of each agenda item, with a few notes, followed by

Comprehensive Plan approval, Hospital Authority re-appointment, 3 small rezonings, AT&T cell tower, Regional Transit, LMIG Restriping, Budget Calendar, Second Harvest, Code Red @ LCC 2021-11-08

The Lowndes County Commission will probably re-appoint Ben Copeland to the Hospital Authority, and approve three rezonings, only one (REZ-2021-24 Barry Godfrey) apparently controversial, as well as an AT&T telecommunications tower, Tuesday evening after hearing them Monday morning.

The item with the biggest effect is the 2021 Comprehensive Plan Adoption.

[REZ-2021-24 Barry Godfrey, Mt. Zion Church Road; TWR-2021-01 CitySwitch II, LLC, Bemiss Road, New 265' Telecommunications Tower]
REZ-2021-24 Barry Godfrey, Mt. Zion Church Road; TWR-2021-01 CitySwitch II, LLC, Bemiss Road, New 265′ Telecommunications Tower

The big ticket near-term item is for roads, 2021 LMIG Safety Action Plan Restriping.

Cost What
$281,529.502021 LMIG Safety Action Plan Restriping
$32,266.00Request for Cash Match Increase for VAWA ASG Salary Supplement
$31,500.00Code Red Annual Renewal
$345,295.50Total

See the agenda. The board packet is on the LAKE website, received in response to a LAKE open records request.

For the Comprehensive Plan, see the LAKE videos of the preceding Comprehensive Plan Update Meeting 2 and the Character Area Maps for it, the Lowndes County Commission Regular Session before that, and the quite lengthy first Comprehensive Plan Public Hearing.

For the rezonings and the telecommunications tower, see also the LAKE videos of the preceding Planning Commission meeting.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, NOVEMBER 8, 2021, 8:30 a.m.
REGULAR SESSION, TUESDAY, NOVEMBER 9, 2021, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

  1. Call to Order Continue reading

Updated Packet: Lowndes County Commission @ LCC 2019-05-14

Lowndes County did supply the items missing from the May 14 and 15, 2019 board packet, on 11 June 2019, and those items are now on the LAKE website.

[Letter]
Letter

LAKE looks forward to the county putting all these packet documents on the county’s own website, along with the agenda and agenda sheets.

-jsq

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!

Packet: Lowndes County Commission @ LCC 2019-05-14

Update 2019-07-09: Missing items supplied by the county.

Here’s the mysterious Moody AFB “Helicopter Corridor and Class D Airspace” map from item 6.c. TWR-2019-01 Value Concepts, Inc., US Hwy 84 E. E-A, New 300′ Telecommunications Tower on the May 13 and 14, 2019, Lowndes County Commission agenda.

[Page 24]
Page 24

This in the agenda packet, now on the LAKE website, including files returned by the county in response to a LAKE open records request. The county supplied those files on a USB drive, for which it charged LAKE $6.65.

Missing from what the county sent: Continue reading

Videos: Tower, appointments, sewer main, boat ramp, water trails, Paddle Georgia @ LCC 2019-05-14

All three rezonings breezed through, except slightly the longest was the tabling of the proposed 300′ communications tower off of US 84 East. The tower had the most people: those sitting in the back.

Surprisingly, one of the two Authority appointments was not the incumbent. None of the candidates were introduced, and none spoke.

One Citizen spoke, me, on behalf of WWALS, thanking them and inviting them.

Commissioner Clay Griner was not present. The other four voting Commissioners unanimously approved everything, including the one tabling. At least two staff speakers were not introduced, one not named except by last name, and one never named at all.

Below are Continue reading

Videos: Tower and online packets @ LCC 2019-05-13

As expected, the longest item was about the 300′ communications tower proposed south of US 84 E. Second was bids for rotary mowers (really). And a Commissioner wanted to know what’s a blade.

Afterwards, at 9AM, was a special appearance by Tax Commissioner Rodney Cain and his staff, which at 16 3/4 minutes, took almost as long as the entire Work Session.

In between, Commissioners answered my question: Continue reading

378x872 Coleman Road along Val-Tech Road to James Road, Map, in Coleman Road force main, by John S. Quarterman, for www.l-a-k-e.org, 13 May 2019

Sewer main replacement, 2 Authority appointments, roads and rezonings @ LCC 2019-05-13

Appointments to two more Authorities with no prior public notice nor requests for applicants: the Hospital Authority and the Airport Authority.

About the Hospital Authority:

HISTORY, FACTS AND ISSUES: The term of Dr. Mary Richardson on the Hospital Authority of Valdosta and Lowndes County will expire on June 1, 2019. Ms. Shirley Garland, Mrs. Elsie Napier, and Dr. Mary Margaret Richardson’s names have all been submitted for appointment.

For the Airport Authority, Anthony Payton’s term is up and he wants to be reappointed.

Lowndes County Commissioners will be hearing about a bunch of purchases and bids. Two of them are water items: Georgia Department of Transportation – TIA Project Agreement – Hightower Road/Cooper Road NE Paving and Drainage Improvements and Professional Services for Coleman Road Lift Station Force Main Replacement. Look at this about that lift station:

HISTORY, FACTS AND ISSUES: Lowndes County received a Proposal from Lovell Engineering for the engineering and construction plan preparation for Coleman Road lift station force main replacement. Coleman Road force main has experienced repeated failures and is in need of replacement. Coleman Road force main is the beginning of the main trunk line that transports waste water from the north Lowndes region to the LAS. Costs will be 9% of construction.

Lowndes County is replacing a sewer main because it has failed before. Wait, is this the same main from back in October, when Commissioners approved $99,935 to fix “The 16” force main between Coleman Road lift station and James Road”?

Coleman Road along Val-Tech Road to James Road, Map
Map: VALORGIS.

There are two transportation items: that TIA paving and drainage project, and Professional Engineering and Surveying Services for TIA Projects.

The two rezonings and the communications tower from the recent Planning Commission meeting are on the agenda.

No, we haven’t posted the LAKE videos of that Planning Commission meeting yet. Yes, we will do so soon. Meanwhile, Lowndes County has its own video equipment and editing software and could video Planning Commission meetings, and budget meetings, for that matter.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, MAY 13, 2019, 8:30 a.m.
REGULAR SESSION, TUESDAY, MAY 14, 2019, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading