Tag Archives: Georgia

Solar farm or fracked methane pipeline with explosions?

Which do you want? A 31 megawatt solar farm such as is building next to Albany, Georgia, built by Southern Company subsidiary Georgia Power to power 5,000 homes, and that won’t leak or explode? Or the Sabal Trail fracked methane pipeline that could blow up like


Photo: US Army/Fort Benning.


KERRY JOBE VIA AP

another Spectra Energy 36″ pipeline this morning in Pennsylvania, badly burning a man and incinerating his house? After which Spectra declared force majeure, which Bloomberg spells out as “Force majeure is declared to remove a company from contractual obligation because of events beyond its control.” So apparently any promises Spectra or Sabal Trail made to you, your city, county, or state, it can just declare force majeure and get off the hook. Even for a 40-mile-long and 4,000-foot-high plume of smoke.

Russell Grantham, AJC, 29 April 2016, Old power gives way to new power in south Georgia, Continue reading

Mutual aid, Variance, Remerton Mills Quitclaim @ RCC 2016-04-04

Only the smoke stack remains, yet Remerton Mills still took up most of the Remerton City Council agenda when Gretchen videoed there this month. The Humane Society wants to house dogs temporarily and house an adoption site for cats. This also requires a variance. Yes, apparently Remerton has more room for animals than Valdosta.

Here are links to the LAKE videos of each item, from the agenda. Also notice Remerton has Citizens to Be Heard first, like both Lowndes County and Valdosta used to have only a few years ago. Continue reading

Videos: Emergency no-bid repairs, a bridge where, and unnecessary resurfacing @ LCC 2016-04-25

5.e. Emergency Fiber Replacement to South Lowndes The FY 2017 Juvenile Justice Incentive Grant was a popular topic yesterday morning, and some Commissioners showed a little bit of scepticism about that $89,005 in emergency no-bid repairs on the agenda for yesterday morning and for voting 5:30PM this evening.

Also $634,800 for a bridge we can’t tell where, and some unknown fraction of $1,663,888.78 to resurface a road that shouldn’t be used as a highway in the first place. Who’s in charge of budget planning for the county?

At the end, there was more from the County Manager about private road Carter Way: they discovered another property owner (“at least one”) after they agreed to spend $67,822 to fix a private road.

Here are links to each of the LAKE videos, with a few notes, followed by a video playlist. Continue reading

Halliburton says fossil fuels unsustainable, lays off a third worldwide, including management

You know things are bad for fossil fuels when the biggest profiteer of them all takes an axe to itself. The fewer fossil fuel boondoggles (including more pipeline projects going belly-up), the faster investment will keep moving to renewable sun, wind, and water power, for profits, and we get clean air and water and less global warming.

“Tyler Durden”, Zerohedge, 22 April 2016, Halliburton Fires One Third Of Global Staff: “What We Are Experiencing Today Is Unsustainable”,

In a brutally frank and painfully honest first quarter operational update, Halliburton president Jeff Miller poured freezing cold water all over the “oil is stabilizing, and everything is going to be awesome” narrative. After explaining that the firm has laid off one-third of its global employees, and pointing to the collapse in sequential revenues across every business unit, Miller exclaimed: “What we are experiencing today is far beyond headwinds; it is
unsustainable.”

Due to the deadline of its merger agreement with Baker Hughes Halliburtion has delayed its earnings conference call until May 3rd and so gave an operational update. The healdlines were horrific:

Road paving and Alapaha BoatRamp in Naylor Town Hall @ LCC 2016-04-14 @ LCC 2016-04-14

Most people wanted to know which roads would be paved when, in Bemiss, to Alapaha Subdivision, and next to the new Civic Center. Steve Stalvey (Utilities), Mike Fletcher (Engineer), Joe Pritchard (County Manager), Joyce Evans (Dist. 1), George Page (VLPRA), Paige Dukes (County Clerk), Demarcus Marshall (Dist. 4), Bill Slaughter (Chairman), seated: Robert & Carolyn Dinkins They did also talk about the planned new civic center and the Alapaha Boatramp they’re building.

I thank the Chairman for clarifying his remark about paving every road in the county. He and other county officials also went on about safety being a big concern, which is news to me, on my road the county insisted on paving that became a drag race track. And what’s this about Continue reading

Emergency no-bid repairs, a bridge where, and unnecessary resurfacing @ LCC 2016-04-25

$89,005 in emergency no-bid repairs on the agenda for Monday morning and voting Tuesday evening. Agenda Sheet Also $634,800 for a bridge we can’t tell where, and some unknown fraction of $1,663,888.78 to resurface a road that shouldn’t be used as a highway in the first place. Who’s in charge of budget planning for the county?

Why is replacing the fiber optic data cable that connects the South Lowndes Data Center and the E911 Center an emergency repair for $61,020, when apparently the problem has been going on for years? Meanwhile, it’s good that it’s not an emergency that the 911 Center Core Network Equipment needs replacing for $38,621. Planning ahead is good. Is one of these items in the budget and the other not?

Another emergency not marked as such in the agenda is Continue reading

Carter Way Correction by Bill Slaughter @ LCC 2016-04-12

Thanks to Lowndes County Chairman Bill Slaughter, here’s a correction to Fixing private road Carter Way next to proposed Sabal Trail fracked methane path @ LCC 2016-04-12.

From: Bill Slaughter
Subject: Carter Way
Date: Mon, 18 Apr 2016 21:04:14 +0000

John,

I got a call today regarding comments that have been made about Agenda Item 7.h on your blog page, for clarification COWART & Sons was not awarded a contract for this emergency repair the contractor was Rountree Construction!

We requested a temporary easement from property owner Cowart & Sons to allow Rountree Construction to perform the work on a private road Continue reading

Project Max and many others 6PM this evening @ VLCIA 2016-04-19

Is the mysterious Project Max a glass container plant as everyone seems to think? An agenda suddenly appeared It’s on the agenda that suddenly appeared on the Development Authority’s website this afternoon after Gretchen called to ask where it was. She will be there with the LAKE video camera.

Valdosta-Lowndes Development Authority
Tuesday, April 19, 2016 5:30 p.m.
Development Authority Conference Room/103 Roosevelt Drive
Monthly Meeting Agenda Continue reading

Southern Company Annual Meeting @ SO 2016-05-25

Road trip to Callaway Gardens for the annual question time with Tom Fanning, questions provided by environmentalists and Southern Company (SO) stockholders from at least four states.

Energy Mix This figure from page ii of the meeting Notice illustrates both the problem and the solution for Southern Company. Natural gas has replaced coal as SO’s top energy source, and Nuclear is still in there. But renewables are up to 4%. And over on the right of the same page:

  • Growth in Renewables
    Approximately 3,800 megawatts of announced or added renewable capacity since 2012. This includes the development of what is expected to be the largest voluntary solar portfolio in the U.S. (at Georgia Power Company).

Interesting use of “voluntary”, but never mind that. If SO keeps that up, it will Continue reading

Fixing private road Carter Way next to proposed Sabal Trail fracked methane path @ LCC 2016-04-12

Cowart & Son, Carter Way If heavy rains washed out culverts on Carter Way, why would we not expect them to wash up the proposed Sabal Trail pipeline, aimed barely 500 feet to the west, downstream on Tiger Creek? And why didn’t the county mention that the company to which they just awarded an emergency no-bid contract to fix a private road owns extensive properties on that same private road? Actually, no: see correction.

The Lowndes County Tax Assessors online database shows Cowart & Son own Parcel 0017 024 of 13.09 acres on Carter Way. Yet the item 7.h. Carter Way agenda sheet for yesterday’s 12 April 2016 Regular Session of the Lowndes County Commission. mentions “Over 10 residences and a telecommunications tower” on Carter Way, but never mentions that the contractor, Cowart & Sons, just awarded that emergency no-bid contract for $67,822 to fix culverts on Carter Way, is also located on Carter Way. Actually, Rountree Construction got the contract; see correction. It’s still an emergency no-bid contract for a private road.

LOWNDES COUNTY BOARD OF COMMISSIONERS
COMMISSION AGENDA ITEM Continue reading