Tag Archives: pipeline

Landfill is in aquifer recharge zone

In a recharge zone for our drinking water supply, the Floridan Aquifer, is the Pecan Row Landfill with its PCBs and coal ash. That proposed landfill pipeline requiring cutting through the vegetative buffer along an unnamed tributary to Spring Branch? Also at least partly in the recharge zone. Continue reading

Landfill pipeline

Apparently ADS’s landfill gas project wants to take in methane from the closed old landfill, as well, according to a public notice today that proposes a pipeline from the old Evergreen Landfill to the Pecan Row Landfill that has the natural gas turbine. Nevermind the $27,500 fine for PCBs or that coal ash in the landfill that nobody on the Lowndes County Commission or Valdosta City Council or Deep South Solid Waste Authority (SWA) can be bothered to check on. Nevermind the unaccounted for tipping fees or host fees. I wonder if cutting through that vegetative buffer will let the coal ash and PCBs reach the Withlacoochee River more easily?

Location of proposed pipeline from Evergreen Landfill to Pecan Row Landfill
The yellow path indicated for the pipeline is just a guess.

In the VDT today, PUBLIC ADVISORY NOTICE,

The proposed project located west of Valdosta, in Lowndes County, GA along Wetherington Lane near the Pecan Row Landfill facility (2995 Wetherington Lane, Valdosta, GA, 31601) involves buffer encroachments necessary to install a 30-inch gas pipeline. This pipeline will Continue reading

Path of proposed pipeline through Lowndes County

That pipeline that starts in PCB-polluted Anniston, Alabama, where would it cross Lowndes County?

Two routes, one north to south, another from Brooks County southeast to the Florida line.

Pipeline points with streets Pipeline points with imagery

On this google map, A is the land mentioned in Massive pipeline project may cross Lowndes, by Jason Schaeffer, VDT, 30 June 2013, B, C, and D several of the parcels listed in the letters Sabal Trail Transmission LLC sent Lowndes County (another is very near D). They all form pretty much a straight line north to south. The actual route probably Continue reading

Sabal Trail natural gas pipeline letters to Lowndes County

No letters from Lowndes County back to Sabal Trail were included in the open records response of last week, so should we conclude the county has not authorized surveys on any of its properties? The request to Lowndes County was for correspondence with Sabal Trail Transmission LLC about the proposed natural gas pipeline from Anniston, Alabama to Orlando, Florida, and the response included survey authorization forms for a list of parcels owned by Lowndes County, plus assorted descriptions and maps with very little detail. Sabal Trail still didn’t have a contract with Florida Power and Light, yet expected:

“Field survey work is scheduled to begin in September 2013.”

It looks like Sabal Trail sent letters about a bunch of parcels and then more about another one later. First they sent an introduction 19 June 2013 listing parcels 0146A-074-A, 0171 178, 0172 119, 0204 001, including a map. This appears to be the same map we’ve seen before posted by various news media:

[Map: 36" Greenfield Pipeline Approx. 465 Miles]
Map: 36" Greenfield Pipeline Approx. 465 Miles

Then they sent a letter 22 June 2013 with a survey authorization form for the same parcels. Then they sent separate letters 25 June 2013 for parcels 0146A-074-A, 0171 178, and 0172 119, 0204 001.

Also on 25 June 2013 Lowndes County Chairman Bill Slaughter informed us:

Lowndes County does not benefit from this proposal and has no responsibility for the approval other than that of a property owner potentially impacted by the proposed route as any other property owner in Lowndes County would be.

Apparently Sabal Trail thought of another one, because a few weeks later they sent a cover letter 15 July 2013 for Parcels 0098 003, 0098 004 with a slightly more detailed map, followed a few days later by a survey authorization form 19 July 2013.

[Map of Options A and B]
Map of Options A and B

Scans of all these letters are on the LAKE website.

-jsq

Langdale Co. and Atlanta Gas Light: first public CNG station

Talked about for a while, now it’s happened: a compressed natural gas (CNG) fueling station; first one in Georgia, apparently. I’m used to natural gas pipelines (the AGL pipeline pictured runs through my property). Unfortunately, natural gas increasingly comes from fracking. How about an electric car charging station? -jsq

PR from AGL yesterday, Atlanta Gas Light teams up with The Langdale Company to open first public CNG station under the AGL CNG Program,

Warning High Pressure Natural Gas ATLANTA—July 23, 2013—The first compressed natural gas (CNG) fueling station developed under the Atlanta Gas Light (AGL) CNG Program is now open in Valdosta, GA. Approved by the Georgia Public Service Commission (PSC) in 2012, the program is designed to expand public access to the CNG fueling infrastructure throughout the state and enhance Georgia’s role in the emerging CNG market in the southeastern U.S.

Built and maintained by Langdale Fuel, an affiliate of The Langdale Company, the new station is the first of five CNG stations awarded contracts to go into service under the AGL CNG Program. The station will offer public access to CNG fuel for transportation vehicles, adding two fueling islands to the company’s existing service station located at 1628 James P. Rogers Drive.

“Our goal in creating the AGL CNG Program was Continue reading

Videos: Attorney set different prices, Commissioners set millage date @ LCC 2013-07-09

The most interesting developments were not on the agenda. Commissioners approved dollar amounts for two purchase orders that were completely different from the ones they were quoted the morning before, with no discussion: the County Attorney quoted the new figures, asked for approval, and immediately got it. Commissioner Richard Raines still didn’t want to enforce a neighborhood covenant yet it was Commissioner Raines who made the motion last fall to let an Exclusive Franchise with Advanced Disposal Services; a covenant the county is now trying to enforce by having the County Attorney sue local business Deep South Sanitation. They said nothing about that 100 foot wide pipeline barrelling through the county. They could have the County Attorney investigate that, but they aren’t. They approved meeting for millage rate approval 8:30 AM Friday 26 July 2013: that’s for the property taxes they collect, which presumably partly go to pay the County Attorney. And the Chairman refused to let a citizen speak on a technicality.

Here’s the agenda with links to the videos and a few notes. See also videos of the previous morning’s Work Session.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 8, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 9, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

Videos: Water, Sewer, Video Arraignment, and Backups @ LCC 2013-07-08 @ LCC 2013-07-08

Not big enough, I guess:

I don’t have any interest at all in this board enforcing covenants like that.
Commissioner Richard Raines said that at yesterday morning’s Work Session about a covenant the neighbors want a rezoning applicant to sign, yet it was Commissioner Raines who made the motion last fall to let an Exclusive Franchise with Advanced Disposal Services; a covenant the county is now trying to enforce by suing local business Deep South Sanitation. They said nothing about that 100 foot wide pipeline barrelling through the county. They vote tonight, 5:30 PM.

County sound still wasn’t working, going on a month now, back in the videoing pen in the back of the room, so what you hear is what we hear back there, as recorded by the LAKE camera.

Here’s the agenda with links to the videos and a few notes.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 8, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 9, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

Water, Sewer, Video Arraignment, and Backups @ LCC 2013-07-08

A very light agenda for the Lowndes County Commission, still avoiding topics of public interest, such as that 100 foot wide pipeline barrelling through the county and the county suing a local business to the benefit of a monopoly owned by investors in New York City.

Here’s the agenda.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JULY 8, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, JULY 9, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
  1. Call to Order
  2. Invocation
  3. Pledge of Allegiance to the Flag
  4. Minutes for Approval
    1. Work Session — June 24, 2013
    2. Regular Session — June 25, 2013
  5. Public Hearing — REZ-2013-07 Leatherwood, 2402 or 2406 James Rd. R-1 and R-21 to R-10, LC Water and Sewer, ~0.71 acres
  6. For Consideration
    1. Video Arraignment for Magistrate and Juvenile Court Contract
    2. Enterprise and Backup Storage Solution Scope of Work
  7. Reports-County Manager
  8. Citizens Wishing to be Heard Please State Name And Address

-jsq

Videos: a pipeline! 2 appointments, 3 hearings, 9 considerations, and 2 bids @ LCC 2013-06-25

Got a pipeline aimed at your house? The county takes no responsibility. And videos are good for juvenile court, but still not for the Commission. Lots more; see below.

Here’s the agenda, with links to the videos and a few notes. See also the videos of the previous morning’s Work Session.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, JUNE 24, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, JUNE 25, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

35 jobs for 51 coal plants of CO2: Keystone XL Pipeline

What pollutes almost as much as one and a half coal plants per permanent job? The proposed Keystone XL Pipeline. Does that sound like a good deal to you?

Talia Buford and Darren Goode wrote for Politico 1 March 2013, State Dept. Keystone report plays down climate fears, Continue reading