Tag Archives: LAKE

Videos: Moody, Moody, acre, water, and SPLOST VI @ LCC 2013-08-12 @ LCC 2013-08-12

The “SPLOST VII Agreement” has been drafted among the county and the local cities, but it isn’t quite done yet, you can’t see what they’re still considering, and there was no mention of any public hearings. A local engineering firm is apparently going to get two no-bid contracts, one for the Alapaha Water Treatment Plant and one for the county’s Land Application Site. A local attorney represented both a bond refinancing and Moody Housing. Many renewal contracts were presented, and the long-running juvenile justice item saw some progress. They ended with an Executive Session but didn’t say what for. Chummy lot, those Commissioners and staff and attorneys and engineers.

Here’s the agenda, with links to the videos and a few notes, including a few links to related posts.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, AUGUST 12, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, AUGUST 13, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
  1. Call to Order
  2. Invocation

    That’s only in the Regular Session, which is 5:30 PM Tuesday 13 August 2013.

  3. Pledge of Allegiance to the Flag

    That’s only in the Regular Session, which is 5:30 PM Tuesday 13 August 2013.

  4. Minutes for Approval

    Chairman Bill Slaughter said: “Please take a look at those before tomorrow night.”

    Continue reading

REZ-2013-09 Moody Housing, Val Del Rd @ LCC 2013-08-12

County Planner Jason Davenport said the proposed Moody Family Housing was “in the Nelson Hill neighborhood”, and there were at least 30 pages of updates, but the County Clerk wouldn’t show them to LAKE without an Open Records Request, which hadn’t yet been satisfied at the end of the day. Commissioners had some questions about acreage and traffic, some of which were answered by the ubiquitous Attorney Bill Holland, and others of which were not answered very well by County Engineer Mike Fletcher, at this morning’s Work Session of the Lowndes County Commission.

6.b. REZ-2013-09 Moody Housing, Val Del Rd R-1 to Residential PD, LC Water & Sewer, ~64 acres

Davenport said:

As of last Friday we did receive an updated site plan as well as some elevations from the applicants to let us know exactly what the houses would look like, what they’re anticipating. The site plan did have four changes and I’ll hand these out to you in just one minute. We added some notes about the uses. We wanted to make them show us where their proposed signage was and we wanted to make them clarify who would be maintaining the open space and the green space….

He passed those updates out, but the County Clerk refused to supply copies for LAKE without an Open Records Request. Gretchen filed an ORR, but if the county takes the statutory three days, we won’t get copies, nor will you, before the Commission votes tomorrow evening..

Here’s Part 1 of 2: Continue reading

Dump CCA and other private prison stocks now –smart analysts

If business is so good, why did CCA lose two contracts for new prisons in Georgia last year when neither the state nor the feds had enough prisoners to fill them? And why was the private prison in Ocilla nearly sold at auction? Why this year was Gladiator School closed and two other CCA prisons cancelled? And all that was before U.S. DoJ announced today it will “avoid charging certain low-level and nonviolent drug offenders with crimes that carry mandatory minimums”.

Ed Arnold wrote for Memphis Business Journal 23 July 2013, Corrections Corp. of America debunks Anonymous report,

As reported on Monday, the computer hacking collective known as Anonymous Analytics published a blog warning investors that a declining prison population and reforms designed to reduce incarceration rates in the U.S. point to shrinking revenue for Corrections Corporation of America (NYSE: CXW) going forward.

CCA flatly denied the Anonymous Analytics conclusions in a statement.

CCA apparently didn’t dare link to the actual report. Anonymous Analytics wrote 9 July 2013, Corrections Corporation of America: The Dismantling of a National Disgrace, Continue reading

Avoid charging low-level and nonviolent drug offenders –U.S. DoJ

It’s about time! The War on Drugs has failed, admits the U.S. Department of Justice, by saying it will “avoid charging certain low-level and nonviolent drug offenders with crimes that carry mandatory minimums”.

Ryan J. Reilly wrote for Huffpo today, Eric Holder Outlining New Justice Department Drug Sentencing Reforms,

The Justice Department will avoid charging certain low-level and nonviolent drug offenders with crimes that carry mandatory minimums, Attorney General Eric Holder will announce Monday. The policy shift will allow certain defendants — those without ties to large-scale organizations, gangs or cartels — to avoid what Holder called “draconian mandatory minimum sentences.”

Holder, in a speech before the American Bar Association in San Francisco on Monday, Continue reading

Millstone 3 nuke down since Friday, NRC tells us Monday

Friday a reactor tripped off, and NRC got around to telling us about it today: Millstone 3, 3.2 miles WSW of New London, Connecticut, about half way between Boston and New York. I hear a few people live around there. That’s its second downtime in six months. Why is nuclear considered reliable baseload? Distributed solar power wouldn’t all be down at once, and wouldn’t risk irradiating millions of people.

Here’s Event Number 49260: Continue reading

Moody, Moody, acre, water, and SPLOST VI @ LCC 2013-08-12

Does “SPLOST VII Agreement” mean the SPLOST lists are a done deal and there will be no public hearings? Two Moody and one small rezoning cases move from the Planning Commission to the County Commission. And that Alapaha Water Treatment Plant is back on the agenda for tomorrow morning and voting Tuesday evening by the Lowndes County Commission.

Here’s the agenda, with a few links to related posts.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, AUGUST 12, 2013, 8:30 a.m.
REGULAR SESSION, TUESDAY, AUGUST 13, 2013, 5:30 p.m.
327 N. Ashley Street – 2nd Floor
Continue reading

Little guys must stick to the letter of the ULDC @ GLPC 2013-07-29

An individual with a request about family land got told by staff he didn’t fit the letter of the zoning code, in sharp contrast to the Moody Housing item which got to slide on traffic, safety, use of local contractors, and vague affirmations from the developer that maybe there’d be no mold or unpaid subcontractors this time. Walkout Most of the attendees didn’t care, and walked out as soon as this item started. But some of the Commissioners did care.

County Planner Jason Davenport said nobody is currently renting the property and “you have the recommendation from staff”.

Stubbs The applicant said the land had been deeded by grandmother to family members years ago, and one now wanted to sell his part. The TRC’s analysis said the request didn’t meet ULDC requirements and the TRC’s recommendation was laconic: Continue reading

No mold or unpaid contractors this time for Moody Housing @ GLPC 2013-07-29

Unlike Moody AFB’s last go at privatizing housing, no mold or unpaid contractors this time, or so we’re told. But not so solid assurances that local contractors will be used. And what if this new thing turns into something radically different like Nelson Hill did only a short way up Val Del? GLPC Voting

Speaking for that proposed privatized Moody housing on Val Del Road, Lawyer Tom Kurrie said this was “an opportunity for our community”. He spelled out that the proposal was “90 homes for off-base houses, for enlisted personnel, non-commissioned officers, and officers”, with gates. He went on about Balfour Beatty‘s experience in building such housing, and their option to build Phase II, although at the moment they’re only requesting Phase I. He said “the unfortunate issue that took place with the prior development” would not occur with this one.

I can guess he’s referring to the mold issue, Beth Mahoney detailed in Little Rock Military Families Examiner 6 April 2009.

Or since he lauded Balfour Beatty’s credit rating, maybe he was referring to the nonpayment of subcontractors, as Kari L. Sands wrote for VDT, 4 March 2007, Military housing woes: Non-payment forces work on military housing project to stop.

Preferred Builders and Renovators, LLC., the Home Builders Association of South Georgia and CMS/ Dumpster Co. are among those affected. Subcontractors are alleging that Continue reading

Gated Moody housing on Val Del Road, REZ-2013-09 @ GLPC 2013-07-29

Only 81 of 396 proposed units have been built at current Moody Family Housing on Roberts Road. Why should we build more on Val Del Road?

At the 29 July 2013 Greater Lowndes Planning Commission meeting, County Planner Jason Davenport said that in addition to the initial materials for GLPC, he’d provided an update about Magnolia Grove, which was Phase I of Moody Family Housing. The real reason for the rezoning wasn’t stated in the initial materials given to GLPC. In the materials obtained through open records request, we can see that the GLPC agenda item contained the boilerplate “The general motivation in this case appears to be so that the subject property can be developed at a greater residential density.” In the update it’s assumed that the real reason is housing for Moody personnel, since Magnolia Grove is the existing Moody housing off of Roberts Road. Which isn’t even built out yet, as you can see in this map from the county Tax Commissioners, so why does Moody need more housing?

Lots of interesting back history in that July 29th GLPC Lowndes County Rezoning Update – 2, to which I’ve added Continue reading

TRC and GLPC recommended subdivision that doesn’t improve traffic or safety, REZ-2013-09

What is so important about yet another subdivision of 360,910 square feet in 173 houses when we have a glut of houses that the TRC unanimously recommended it despite significant defects and omissions? According to Technical Review Committee (TRC) analysis, REZ-2013-09 Moody Family will not lessen congestion in the streets or secure safety from fire, panic, and other dangers. TRC also said the application didn’t meet ULDC standards and in somewhat tortured language: “although not a proposed condition, it should be noted on this request that a future traffic study will be required.” Why not require these things before even sending the application to the Planning Commission?

In email to the Greater Lowndes Planning Commissioners of 23 July 2013, forwarded to the applicants 29 July 2013, July 29th GLPC Lowndes County Rezoning Materials,

2) REZ-2013-09 Moody Family, 0072 191, Val Del Rd, 64.92 ac., 2 lots, R-1 to Residential PD, County Utilities

a) The TRC recommended approval of the request unanimously.

b) Additionally, although not a proposed condition, it should be noted on this request that a future traffic study will be required. Acceleration lanes/Deceleration lanes and/or a dedicated left turn lane may be required.

Rumor has it that this development is being pushed not by Moody AFB, rather by Continue reading