Tag Archives: boatramp

Maps for Naylor Boat Ramp, Frank’s Creek Bridge, and Deloach Road @ LCC 2015-02-10

300x186 Naylor Boat Ramp aerial, in Maps from board packet, by John S. Quarterman, 10 February 2015 The three maps arrived by email for the engineering items in the Lowndes County Commission Monday Work Session and Tuesday Regular Session. The rest of the response to that Open Records request did not, so I’ll have to go back again to pick up the rest of it on paper. And the other Open Records request, for Continue reading

Videos: Devine tabled, Naylor boat ramp, no HB 170 or animals @ LCC 2015-02-10

Nothing was said about the GA HB 170 state tax grab from local governments, even though both school boards and the Valdosta City Council already passed resolutions against it. No citizens spoke about animals, or about anything else, not even in the Public Hearings, except for me thanking the Commission about the Naylor Boat Ramp.

The Devine Subdivision at Tillman Crossing was tabled at request of applicant to try to sort out continuing concerns about safety and congestion, while REZ-2015-01 Gramercy 2 and REZ-2015-03 Scurry Property, were unanimously approved. No citizens spoke for or against any of them.

You the taxpaying public didn’t get to see any of the materials in the board packet beyond the one-page agenda item forms, before the Commission voted last night, unless you were in the Commission Chambers or watched the LAKE videos of yesterday morning’s Work Session. The open records request for those rezonings came back with paper maps, despite my request for electronic format; at least the paper maps were in color this time. I asked again for electronic format, and will post them soon even if I have to scan them. The other open records request, for maps and materials for the engineering agenda items, came back with no maps at all, so I sent it back to be satisfied. Both County Planner Jason Davenport and County Engineer Mike Fletcher said they had never seen those open records requests, and they’d both be happy to email electronic copy if they were authorized to do so by the County Clerk.

All the other items were unanimously approved: Continue reading

Videos: 3 rezonings, boat ramp, bridge, utilities, new public defender @ LCC 2015-02-09

The only rezoning to get much time was the Devine Subdivision at Tillman Crossing, at this morning’s Work Session of the Lowndes County Commission. Maps were displayed for that and REZ-2015-01 Gramercy 2 and REZ-2015-03 Scurry Property, but the board packet is still not on the county’s website. I filed an open records request, asking for them to be emailed, and got a telephone callback saying they were ready for pickup, which means I won’t get them until tomorrow, and you may not see them until after tomorrow evening’s voting Regular Session.

Tuesday evening there will be Continue reading

Partial packet items! @ LCC 2015-02-09

This agenda includes links to the Commission Agenda Item form for each item! That’s not all yet, since it does not link to the numerous maps and other materials for each of the three rezoning items, for example. But it’s progress! And the meeting dates also now appear. Good show! Also the name of the engineering firm is in the document for Professional Surveying and Engineering Services for Naylor Boat Ramp.

See also the LAKE videos of the 26 January 2015 Planning Commission meeting for background on the three rezonings, which are in this LCC agenda as REZ-2015-01 Gramercy 2, Old Pine Rd, R-1 to R-10, Water and Sewer, ~4.1 acres, REZ-2015-02 Devine Subdivision, Tillman Crossing Rd, R-1 to R-10, Water and Sewer, ~24 out of ~72 acres, and REZ-2015-03 Scurry Property, Skipper Bridge Rd, R-A to R-1, Well and Septic, ~1.97 acres, plus Public Hearing fo the Abandonment of Deloach Road E (CR 95).

Proposals are also in this agenda for Preliminary Engineering Services for Exit 22 and 29 Utility Relocations, Professional Surveying and Engineering Services for Naylor Boat Ramp, and Proposal for Bridge Foundation Investigation for Morven Road Bridge Replacement, plus a 2015 Public Defender Services Contract & 2015 Operating Contract.

LOWNDES COUNTY BOARD OF COMMISSIONERS
PROPOSED AGENDA
WORK SESSION, MONDAY, FEBRUARY 9, 2015, 8:30 a.m.
REGULAR SESSION, TUESDAY, FEBRUARY 10, 2015, 5:30 p.m.
327 N. Ashley Street – 2nd Floor

Continue reading

Video: SPLOST Facility Update with boatramp @ LCC 2015-02-05

The Naylor boat ramp might be finished this fall, and here’s a list of other SPLOST expenditures, from yesterday’s Lowndes County Commission Annual Planning Meeting.

County Manager Joe Pritchard asked Chad McLeod Project Manager and Mike Fletcher County Engineer to come forward, saying “Turn in your book to that tab….” A book you, the taxpaying public reader, do not have. The county can publish board packets on their new website if they want to.

McCleod presented current facilities for SPLOST VII, after a long introduction by Pritchard, who said McLeod was the county’s liaison with Parks and Rec (VLPRA) and the Sheriff’s Department and other offices. McLeod said VLPRA projects are built by the county and turned over to VLPRA for administration, except for two projects at Freedom Park, which are being managed by VLPRA due to House Bill 489. He listed dollar amounts. I couldn’t catch all of them, but here are some of them: Continue reading

The rest of the videos @ LCC 2015-02-05

The rest of the videos from Thursday are up, as they meet again this morning at 8:30 AM. The new videos are about Revenue and Tax Update, SPLOST Facility Update (including boat ramp), Budget Management, Solid Waste Management, Litter Control, and an unscheduled Closed Session.

All yesterday’s videos are added now to the original post.

-jsq

Videos: Audit report and finance @ LCC 2015-02-05

Update2 2015-02-06: Why HB 170 is bad –Harrison Tillman
Update 2015-02-06: The rest of the videos from Thursday are up, as they meet again this morning at 8:30 AM. The new videos are about Revenue and Tax Update, SPLOST Facility Update (including boat ramp), Budget Management, Solid Waste Management, Litter Control, and an unscheduled Closed Session.

Videos are already up for the audit report and finance from day 1 of the Lowndes County Commission Annual Planning Meeting. More to come. Meanwhile, see also Gretchen’s notes about the new boatramp on the Alapaha River and illegal trash dumping. Continue reading

Alapaha Boat Ramp progress @ LCC 2015-02-05

They’ve been working with Dr. Acree on land aquisition, and with GA-DNR 300x225 Beach at site of planned Naylor Park, in Alapaha River Outing, by John S. Quarterman, for WWALS.net, 24 August 2014 on flow levels and ramp placement, as well as anticipation of survey and final designs, they said during the SPLOST agenda item, reports Gretchen from the Lowndes County Commission retreat. No word of when they anticipate completing the boat ramp, and it sounds like they haven’t actually purchased the land yet.

-jsq

Alapaha River Water Trail @ VLCIA 2014-08-19

I talked about the Water Trail that WWALS Watershed Coalition, Inc. is developing on the Alapaha River with a tiny grant from the Georgia River Network, and how that was a plus for local economic development that wouldn’t cost VLCDA a dime. They seemed to like that, at the 19 August 2014 Regular Meeting of the Valdosta-Lowndes County Development Authority.

Here’s the video, followed by some pictures, links, and notes:

Continue reading