Here are the board packet materials for the Work Session and Regular Session, both tomorrow, Tuesday, July 14, 2026, of the Lowndes County Commission.

About the communications tower in Langdale Park, the packet still does not include the Propagation maps that are required by ULDC 5.05.05.B and 5.05.05.E; see Verizon tower in Langdale Park? @ GLPC 2026-06-29.

[Packet: New Library Board, Wisenbaker Rd rezoning, communications tower in Langdale Park, Pre-Disaster Logistics, Juvenile Justice, Lift Station Bypass @ LCC 2026-07-14]
Packet: New Library Board, Wisenbaker Rd rezoning, communications tower in Langdale Park, Pre-Disaster Logistics, Juvenile Justice, Lift Station Bypass @ LCC 2026-07-14

How are the County Commissioners supposed to decide without all the evidence, this “quasi-judicial decision whether the standards for a telecommunications tower in Section 5.05.05 of the ULDC are met”?

The agenda sheet says, “At the Planning Commission, the applicant’s representative spoke in support, while one citizen spoke in opposition, claiming that inadequate information was available to the GLPC for their consideration. Staff presented the information to the GLPC, who found it sufficient to recommend approval (7-2).”

If the information presented to the Planning Commission was sufficient, why does this County Commission packet include an additional signed and sealed letter from an engineer, which says, “As part of the proposed telecommunications site listed above, we are designing the site in compliance with the Section 5.05.04 (A) of the Lowndes County, Georgia Land Development Code….”

That would appear to satisfy the letter of ULDC 5.05.05.E. Unfortunately, it may not be accurate.

I still don’t see any of these points addressed:

  • An inventory in VALORGIS of the applicant’s existing towers or alternative tower structures. See ULDC 5.05.05.B.2
  • An argument for why Langdale Park would not be a “historic district” or a “scenic view corridor.” See 5.05.05.G.5
  • An argument for why hiking trails cleared by numerous citizens would not be public rights of way. See 5.05.05.I.I. and the Right-of-Way definition on page 1-25.

[Bailey Lively, P.E., As part of the proposed telecommunications site listed above, we are designing the site in compliance with the Section 5.05.04 (A) of the Lowndes County, Georgia Land Development Code]
Bailey Lively, P.E., As part of the proposed telecommunications site listed above, we are designing the site in compliance with the Section 5.05.04 (A) of the Lowndes County, Georgia Land Development Code
PDF

Here’s a picture I took this morning of a Verizon survey red flag to the left (east) of the Langdale Park White Trail A, just south of Hyta Mederer Drive.

[VZ Tower survey marker next to Langdale Park White Trail A, 2026-07-13 --jsq for LAKE]
VZ Tower survey marker next to Langdale Park White Trail A, 2026-07-13 –jsq for LAKE

The White Trail A goes north to south along the lot line marked L10 on this Verizon Specific Purpose Survey map.

The red flag and the marker on the ground near it are presumably marking the northwest corner of “The TOWERS LLC PREMISES”.

The borders of the trail right of way are marked by the sawed ends of logs cut by many volunteers for a public hiking trail. Why would this not count as a public right of way? And why is that survey marker not too close to it?

[Specific Purpose Survey]
Specific Purpose Survey
PDF

LAKE got these packet materials today (Monday) around noon, after I remembered Sunday to send the open records request. It had been queued up for automatic sending, but on the wrong date.

The documents we received are on the LAKE website. Images of each page are below. They also include the minutes for the June 22 Work Session, the June 23 Regular Session, and the June 26 Special Called Meeting to Adopt the FY 2027 Budget.

If the county simply put the entire PDFs of the board packet materials on its own website, as many other counties smaller and larger have been doing for years, nobody would have to go through this rigamarole.

For the two Public Hearing items, the Wisenbaker Road rezoning and the communications tower in Langdale Park, see also the LAKE videos of the preceding Planning Commission meeting.

-jsq

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!
http://www.l-a-k-e.org/blog/donate

[PROPOSED AGENDA]
PROPOSED AGENDA
PDF

[Page 2]
Page 2
PDF

Lowndes County Library System Board of Trustees

[The Board shall be composed of nine (9) residents of Lowndes County who are appointed by the Board of Commissioners of Lowndes County as the only governmental agency supporting the System on a regular basis.]
The Board shall be composed of nine (9) residents of Lowndes County who are appointed by the Board of Commissioners of Lowndes County as the only governmental agency supporting the System on a regular basis.
PDF

[Application of William Booth]
Application of William Booth
PDF

[Page 5]
Page 5
PDF

[Application of J. Elveta Miller]
Application of J. Elveta Miller
PDF

[Page 7]
Page 7
PDF

[Page 8]
Page 8
PDF

[Application of Greg Moore]
Application of Greg Moore
PDF

[Page 10]
Page 10
PDF

[Page 11]
Page 11
PDF

[Application of Debra Carruth]
Application of Debra Carruth
PDF

[Application of Jane Peeples]
Application of Jane Peeples
PDF

[Application of Gary Wisenbaker]
Application of Gary Wisenbaker
PDF

[Application of Mary Beth Brownlee]
Application of Mary Beth Brownlee
PDF

[Page 16]
Page 16
PDF

REZ-2026-14 Ray Colding, 6808 Wisenbaker Rd., Lake Park, ~8.5ac, M-1 & R-A to M-2, County Water and Septic

[to unify the zoning to allow for a saw mill operation and related services.]
to unify the zoning to allow for a saw mill operation and related services.
PDF

[GLPC recommended approval 9-0.]
GLPC recommended approval 9-0.
PDF

[Rezoning request]
Rezoning request
PDF

[SURVEY for Ray Colding]
SURVEY for Ray Colding
PDF

[Industrial and Intensive Zoning Districts]
Industrial and Intensive Zoning Districts
PDF

[Page 22]
Page 22
PDF

[Page 23]
Page 23
PDF

[Page 24]
Page 24
PDF

[Page 25]
Page 25
PDF

[Page 26]
Page 26
PDF

[Table: Minimum Lot area and width]
Table: Minimum Lot area and width
PDF

[4.03.20 Industrial Uses with Nuisance Features]
4.03.20 Industrial Uses with Nuisance Features
PDF

[Zoning Location Map]
Zoning Location Map
PDF

[Future Development Map]
Future Development Map
PDF

[WRPDO Site Map]
WRPDO Site Map
PDF

TWR-2026-02 Bermuda Run, New 159-foot Telecommunications Tower near North Valdosta Road and Hyta Mederer Drive

[The decision to be made by the Board of Commissioners is not a zoning decision. It is a quasi-judicial decision whether the standards for a telecommunications tower in Section 5.05.05 of the ULDC are met.]
The decision to be made by the Board of Commissioners is not a zoning decision. It is a quasi-judicial decision whether the standards for a telecommunications tower in Section 5.05.05 of the ULDC are met.
PDF

[GLPC recommended approval 7-2.]
GLPC recommended approval 7-2.
PDF

[Baker Donelson et al.]
Baker Donelson et al.
PDF

[As required by your local regulations, attached with this application please find the following:]
As required by your local regulations, attached with this application please find the following:
PDF

[The radio signal emitted from the tower is a fixed technology dictated by physics.]
The radio signal emitted from the tower is a fixed technology dictated by physics.
PDF

[Communications Tower NEPA Addendum]
Communications Tower NEPA Addendum
PDF

[CHECKLIST SUMMARY Terracon.com]
CHECKLIST SUMMARY Terracon.com
PDF

[* Federal Airways & Airspace * * Summary Report: New Construction * * Antenna Structure *]
* Federal Airways & Airspace * * Summary Report: New Construction * * Antenna Structure *
PDF

[Structure is beyond notice limit by 8975 feet.]
Structure is beyond notice limit by 8975 feet.
PDF

[Therefore, this tower will not be lighted unless specially requested by the FAA.]
Therefore, this tower will not be lighted unless specially requested by the FAA.
PDF

[Fall Certification Letter]
Fall Certification Letter
PDF

[FEMA CONDITIONAL LETTER OF MAP REVISION COMMENT DOCUMENT]
FEMA CONDITIONAL LETTER OF MAP REVISION COMMENT DOCUMENT
PDF

[Page 46]
Page 46
PDF

[Page 47]
Page 47
PDF

[+ A copy of the public notice distributed by your community stating its intent to revise the regulatory floodway, or a signed statement by]
+ A copy of the public notice distributed by your community stating its intent to revise the regulatory floodway, or a signed statement by
PDF

[Page 49]
Page 49
PDF

[Page 50]
Page 50
PDF

[Zoning Location Map]
Zoning Location Map
PDF

[Future Development Map]
Future Development Map
PDF

[WRPDO Site Map]
WRPDO Site Map
PDF

Award of Pre-Event Disaster Logistics Support Services

[The proposed contracts are pre-event, on-call agreements and do not obligate the County to expend funds. Services will be utilized only as needed through task orders issued in support of emergency response, recovery, exercises, special events, or other authorized activities. Establishing these contracts in advance of adisaster will help ensure rapid deployment of critical resources while supporting compliance with federal procurement requirements a disaster will help ensure rapid deployment of critical resources while supporting compliance with federal procurement requirements and eligibility for reimbursement under disaster assistance programs, including FEMA Public Assistance.]
The proposed contracts are pre-event, on-call agreements and do not obligate the County to expend funds. Services will be utilized only as needed through task orders issued in support of emergency response, recovery, exercises, special events, or other authorized activities. Establishing these contracts in advance of adisaster will help ensure rapid deployment of critical resources while supporting compliance with federal procurement requirements a disaster will help ensure rapid deployment of critical resources while supporting compliance with federal procurement requirements and eligibility for reimbursement under disaster assistance programs, including FEMA Public Assistance.
PDF

[Page 55]
Page 55
PDF

[Evaluation scorecard]
Evaluation scorecard
PDF

[Page 57]
Page 57
PDF

Acceptance of FY2027 Juvenile Justice Incentive Grant

[BUDGET IMPACT: $325,000 - Fully reimbursed by CJCC]
BUDGET IMPACT: $325,000 – Fully reimbursed by CJCC
PDF

[Page 59]
Page 59
PDF

[written approval notice of an award activation from the Criminal Justice Coordinating Council. All project costs]
written approval notice of an award activation from the Criminal Justice Coordinating Council. All project costs
PDF

[score are eligible for Incentive Grant programming.]
score are eligible for Incentive Grant programming.
PDF

[Any requests to have funds allocated in a manner that does not comply with the 70/30 rule must be justified in a]
Any requests to have funds allocated in a manner that does not comply with the 70/30 rule must be justified in a
PDF

[Page 63]
Page 63
PDF

[OTHER RESPONSIBILITY MATTERS; AND DRUG-FREE WORKPLACE REQUIREMENTS]
OTHER RESPONSIBILITY MATTERS; AND DRUG-FREE WORKPLACE REQUIREMENTS
PDF

[(e) Notifying the agency, in writing, within 10 calendar days]
(e) Notifying the agency
PDF

[On behalf of the Applicant, and in support of this application for a grant]
On behalf of the Applicant, and in support of this application for a grant
PDF

[Page 67]
Page 67
PDF

[School Violence Act program, I assure as required by 34 U.S.C. § 10552(a) (3),]
School Violence Act program, I assure as required by 34 U.S.C. § 10552(a) (3),
PDF

[Please allow this letter]
Please allow this letter
PDF

[Audit Requirements]
Audit Requirements
PDF

[This Agreement is executed by and between Evidence Based Associates, LLC, a]
This Agreement is executed by and between Evidence Based Associates, LLC, a
PDF

[Page 72]
Page 72
PDF

[Either party may terminate this Agreement for cause upon providing notice to]
Either party may terminate this Agreement for cause upon providing notice to
PDF

[H. Notices:]
H. Notices:
PDF

[Page 75]
Page 75
PDF

[Page 76]
Page 76
PDF

[services to parents, and development of a standardized written consent form]
services to parents, and development of a standardized written consent form
PDF

[Page 78]
Page 78
PDF

[Page 79]
Page 79
PDF

Lift Station Bypass Pump Request for Proposal

[BUDGET IMPACT: $1,718,895.00 FUNDING SOURCE: (X) GEFA Loan; two bids, BBA Pumps scored highest]
BUDGET IMPACT: $1,718,895.00 FUNDING SOURCE: (X) GEFA Loan; two bids, BBA Pumps scored highest
PDF

June-22-2026-Work-Session-Minutes

[Page 1]
Page 1
PDF

[Page 2]
Page 2
PDF

[Page 3]
Page 3
PDF

June-23-2026-Minutes–Public-Hearing-Presentation-of-the-Proposed-FY-2027-Budget

[ADJOURNMENT]
ADJOURNMENT
PDF

June-23-2026-Regular-Session-Minutes

[Page 1]
Page 1
PDF

[Page 2]
Page 2
PDF

[Page 3]
Page 3
PDF

[ADJOURNMENT]
ADJOURNMENT
PDF

June-30-2026-Minutes–Special-Called-Meeting-to-Adopt-the-FY-2027-Budget

[ADJOURNMENT]
ADJOURNMENT
PDF

P-2026-07-11

[Public Hearing sign, Hyta Mederer Road @ North Valdosta Road, 2026:07:11 08:43:13, 30.8874895, -83.3150696]
Public Hearing sign, Hyta Mederer Road @ North Valdosta Road, 2026:07:11 08:43:13, https://www.google.com/maps/@30.8874895,-83.3150696,17z/data=!3m1!4b1!4m2!3m1!1s0x0:0x0

[Langdale Park entrance sign, 2026:07:11 08:43:28, 30.8874895, -83.3150696]
Langdale Park entrance sign, 2026:07:11 08:43:28, https://www.google.com/maps/@30.8874895,-83.3150696,17z/data=!3m1!4b1!4m2!3m1!1s0x0:0x0

P-2026-07-13

[Verizon Tower Premises survey marker next to Langdale Park White Trail A, 2026-07-13 --jsq for LAKE]
Verizon Tower Premises survey marker next to Langdale Park White Trail A, 2026-07-13 –jsq for LAKE

One thought on “Packet: New Library Board, Wisenbaker Rd rezoning, communications tower in Langdale Park, Pre-Disaster Logistics, Juvenile Justice, Lift Station Bypass @ LCC 2026-07-14

  1. Pingback: Agenda: New Library Board, Wisenbaker Rd rezoning, communications tower in Langdale Park, Pre-Disaster Logistics, Juvenile Justice, Lift Station Bypass @ LCC 2026-07-14 | On the LAKE front

Leave a Reply

Your email address will not be published. Required fields are marked *