8. As-Built Survey. By May 1, 2018, Grantee shall provide Grantor with an as-built survey (2 mylar copies, 2 hardcopies, and 1 electronic copy), which accurately reflects the location of the Pipeline, including its depth and diameter, Pipeline Systems and the Easement Area, prepared by and stamped and signed by a registered surveyor.STT | | Sabal Trail pipeline Easement with Lowndes County Commission | | 26 January 2026 |
|
|