Lowndes Area Knowledge Exchange (LAKE)

[prev][index][next] [index to photographs]

staff has verified that the Petitions are ready for LCBOC consideration, including the verification that at least 2/3 of the owners’ signatures for the proposed lot additions have been obtained, and testing the financial solvency of the addition. Additionally, notice for the proposed district has been advertised in the VDT and signs have been posted to advertise the public hearing on the Petition. The current charge for the basic decorative street lighting district is $61.50 per lot per year.

Basic Decorative Street Lighting Districts — Grove Pointe, Phase V, Sec. 3, The Landings, Phase 4, and Val Del Estates, Phases 4 and 5
Packet: 4 Presentations, 4 Appointments, 2 Rezonings, 1 Dec. Lighting, 16 For Consideration, 1 Pump Station Upgrade @ LCC
8 December 2025

 
staff has verified that the Petitions are ready for LCBOC consideration, including the verification that at least 2/3 of the owners’ signatures for the proposed lot additions have been obtained, and testing the financial solvency of the addition. Additionally, notice for the proposed district has been advertised in the VDT and signs have been posted to advertise the public hearing on the Petition. The current charge for the basic decorative street lighting district is $61.50 per lot per year.
bigger PDF