§ 7.1.12 The Owner acknowledges that accelerated or fast-track design and construction, or phased construction, providesDesign-Build Contract for Lowndes County Animal Shelter | | Packet: 4 Presentations, 4 Appointments, 2 Rezonings, 1 Dec. Lighting, 16 For Consideration, 1 Pump Station Upgrade @ LCC | | 8 December 2025 |
|
|