Lowndes Area Knowledge Exchange (LAKE)

[prev][index][next] [index to photographs]

the proposal is for 64 residential lots for this initial phase and that detention pond and city water/sewer will be utilized. Additionally, the development plan will include a decel lane off Bemiss Rd. as well as 2 points of ingress/egress.

2025-08-25-GLPC-Minutes-DRAFT
Packet: Two Lowndes County Cases, Commercial on Stewart Circle, Tower on Rocky Ford Road @ GLPC
29 September 2025

 
the proposal is for 64 residential lots for this initial phase and that detention pond and city water/sewer will be utilized. Additionally, the development plan will include a decel lane off Bemiss Rd. as well as 2 points of ingress/egress.
bigger PDF