owl LAKE

Sabal Trail pipeline Easement with Lowndes County Commission 2026-01-26 [Up]

LAKE blog post.

Easement document received from Lowndes County in response to a LAKE open records request.

Pictures

MMM

[Sabal Trail pipeline Easement with Lowndes County 2016-01-26, Between Railroad Ave. and Madison Highway]
Sabal Trail pipeline Easement with Lowndes County 2016-01-26, Between Railroad Ave. and Madison Highway

STT

[NATURAL GAS UNDERGROUND PIPELINE EASEMENT AND AGREEMENT]
NATURAL GAS UNDERGROUND PIPELINE EASEMENT AND AGREEMENT
PDF

[4.a. Single Pipeline; Pipeline Depth. This Easement allows a single underground Pipeline with a maximum pipe outer diameter of thirty-six (36) inches, and with the...]
4.a. Single Pipeline; Pipeline Depth. This Easement allows a single underground Pipeline with a maximum pipe outer diameter of thirty-six (36) inches, and with the...
PDF

[7. Pipeline Construction and Maintenance.]
7. Pipeline Construction and Maintenance.
PDF

[8. As-Built Survey. By May 1, 2018, Grantee shall provide Grantor with an as-built survey (2 mylar copies, 2 hardcopies, and 1 electronic copy), which accurately reflects the location of the Pipeline, including its depth and diameter, Pipeline Systems and the Easement Area, prepared by and stamped and signed by a registered surveyor.]
8. As-Built Survey. By May 1, 2018, Grantee shall provide Grantor with an as-built survey (2 mylar copies, 2 hardcopies, and 1 electronic copy), which accurately reflects the location of the Pipeline, including its depth and diameter, Pipeline Systems and the Easement Area, prepared by and stamped and signed by a registered surveyor.
PDF

[13. Taxes. Grantee shall assume and pay the amount of any taxes lawfully assessed and applicable to Grantee and due and owing on the Pipeline, Pipeline Facilities or Easement Area.]
13. Taxes. Grantee shall assume and pay the amount of any taxes lawfully assessed and applicable to Grantee and due and owing on the Pipeline, Pipeline Facilities or Easement Area.
PDF

[15. Insurance. ... d. Environmental Liability; ($5,000,000.00 per occurrence minimum coverage; which Environmental Liability coverage amount may be a part of the General Liability coverage amount).]
15. Insurance. ... d. Environmental Liability; ($5,000,000.00 per occurrence minimum coverage; which Environmental Liability coverage amount may be a part of the General Liability coverage amount).
PDF

[17.a. Monitoring Wells; Landfill Monument. Grantee acknowledges and agrees that there are, in each case as shown on the Surveys, presently located within or near the Easement Area:...]
17.a. Monitoring Wells; Landfill Monument. Grantee acknowledges and agrees that there are
PDF

[17.e. Environmental Matters. Grantee shall be responsible for and shall comply with all applicable laws, rules and regulations, including any required authorizations, approvals, permits, licenses, or fees relating thereto or arising from Grantee’s use of the lands described....]
17.e. Environmental Matters. Grantee shall be responsible for and shall comply with all applicable laws, rules and regulations, including any required authorizations, approvals, permits, licenses, or fees relating thereto or arising from Grantee’s use of the lands described....
PDF

[17.g. Governing Law. This Grant of Easement and Agreement shall be construed, enforced and interpreted in accordance with the laws of the State of Georgia without regard to its conflicts of laws provisions.]
17.g. Governing Law. This Grant of Easement and Agreement shall be construed, enforced and interpreted in accordance with the laws of the State of Georgia without regard to its conflicts of laws provisions.
PDF

[Page 10]
Page 10
PDF

[IN WITNESS WHEREOF, this instrument is executed under seal as of the date first above written. GRANTOR:]
IN WITNESS WHEREOF, this instrument is executed under seal as of the date first above written. GRANTOR:
PDF

[GRANTEE: [SEAL] SABAL TRAIL TRANSMISSION, LLC By: Sabal Trail Management, LLC, its Operator]
GRANTEE: [SEAL] SABAL TRAIL TRANSMISSION, LLC By: Sabal Trail Management, LLC, its Operator
PDF

ExhibitA

[PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT & TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 003]
PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT & TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 003
PDF

ExhbitB

[Detail maps with monitor wells and SONAT pipeline, 2014-08-27]
Detail maps with monitor wells and SONAT pipeline, 2014-08-27
PDF

AS

[1657-PL-DG-70197-246, STA. 12859+00 TO STA. 12912+00, MP 243.54, MP 244.55, 12868+90, 2016-03-14, CL CREEK, Railroad Ave., Clyatt Mill Creek, KINDER MORGAN PIPELINE, LOWNDES COUNTY, GEORGIA, 30.6805050, -83.3264430]
1657-PL-DG-70197-246, STA. 12859+00 TO STA. 12912+00, MP 243.54, MP 244.55, 12868+90, 2016-03-14, CL CREEK, Railroad Ave., Clyatt Mill Creek, KINDER MORGAN PIPELINE, LOWNDES COUNTY, GEORGIA, https://www.google.com/maps/@30.6805050,-83.3264430,17z/data=!3m1!4b1!4m2!3m1!1s0x0:0x0