Sabal Trail pipeline Easement with Lowndes County Commission 2026-01-26 [Up]
LAKE blog post.
Easement document received from Lowndes County in response to a LAKE open records request.
Sabal Trail pipeline Easement with Lowndes County 2016-01-26, Between Railroad Ave. and Madison Highway
NATURAL GAS UNDERGROUND PIPELINE EASEMENT AND AGREEMENT
PDF
4.a. Single Pipeline; Pipeline Depth. This Easement allows a single underground Pipeline with a maximum pipe outer diameter of thirty-six (36) inches, and with the...
PDF
7. Pipeline Construction and Maintenance.
PDF
8. As-Built Survey. By May 1, 2018, Grantee shall provide Grantor with an as-built survey (2 mylar copies, 2 hardcopies, and 1 electronic copy), which accurately reflects the location of the Pipeline, including its depth and diameter, Pipeline Systems and the Easement Area, prepared by and stamped and signed by a registered surveyor.
PDF
13. Taxes. Grantee shall assume and pay the amount of any taxes lawfully assessed and applicable to Grantee and due and owing on the Pipeline, Pipeline Facilities or Easement Area.
PDF
15. Insurance. ... d. Environmental Liability; ($5,000,000.00 per occurrence minimum coverage; which Environmental Liability coverage amount may be a part of the General Liability coverage amount).
PDF
17.a. Monitoring Wells; Landfill Monument. Grantee acknowledges and agrees that there are
PDF
17.e. Environmental Matters. Grantee shall be responsible for and shall comply with all applicable laws, rules and regulations, including any required authorizations, approvals, permits, licenses, or fees relating thereto or arising from Grantee’s use of the lands described....
PDF
17.g. Governing Law. This Grant of Easement and Agreement shall be construed, enforced and interpreted in accordance with the laws of the State of Georgia without regard to its conflicts of laws provisions.
PDF
Page 10
PDF
IN WITNESS WHEREOF, this instrument is executed under seal as of the date first above written. GRANTOR:
PDF
GRANTEE: [SEAL] SABAL TRAIL TRANSMISSION, LLC By: Sabal Trail Management, LLC, its Operator
PDF
PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT & TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 003
PDF
Detail maps with monitor wells and SONAT pipeline, 2014-08-27
PDF
1657-PL-DG-70197-246, STA. 12859+00 TO STA. 12912+00, MP 243.54, MP 244.55, 12868+90, 2016-03-14, CL CREEK, Railroad Ave., Clyatt Mill Creek, KINDER MORGAN PIPELINE, LOWNDES COUNTY, GEORGIA, https://www.google.com/maps/@30.6805050,-83.3264430,17z/data=!3m1!4b1!4m2!3m1!1s0x0:0x0
|