owl LAKE

Packet: Old State Road Subdivision, Salem Church tower again, Hahira setbacks, Valdosta C-C and P-D @ GLPC 2026-08-31 [Up]

LAKE blog post:

Item found on lowndescounty.com:

Items received from Lowndes County, Hahira, and Valdosta in response to a LAKE open records request.

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!

MMM

[Collage, Packet @ GLPC 2026-08-31 --LAKE]
Collage, Packet @ GLPC 2026-08-31 --LAKE

GLPC-Agenda-August-2026

[3. REZ-2026-17, 4. TWR-2026-01, HA-2026-02]
3. REZ-2026-17, 4. TWR-2026-01, HA-2026-02
PDF

REZ-2026-17-GLPC-Packet

[to facilitate subdivision of the property into lots that conform to the applicable requirements of the local zoning ordinance.]
to facilitate subdivision of the property into lots that conform to the applicable requirements of the local zoning ordinance.
PDF

TWR-2026-01-GLPC-Packet

[to construct a new ~365-foot telecommunications tower on a 10,000 sf leased area on Old Valdosta Road near Salem Church Road to fill an alleged gap in the existing coverage area.]
to construct a new ~365-foot telecommunications tower on a 10,000 sf leased area on Old Valdosta Road near Salem Church Road to fill an alleged gap in the existing coverage area.
PDF

[Says county commissioners can vote to refer to ZBOA, which could then send it back to the county]
Says county commissioners can vote to refer to ZBOA, which could then send it back to the county
PDF

[5.05.00 TELECOMMUNICATION TOWERS 5.05.01 Purpose]
5.05.00 TELECOMMUNICATION TOWERS 5.05.01 Purpose
PDF

[5.05.04 Procedures]
5.05.04 Procedures
PDF

[More procedures]
More procedures
PDF

[5.05.05 Development Standards]
5.05.05 Development Standards
PDF

[E. Availability of Suitable Existing Structures for Collocation]
E. Availability of Suitable Existing Structures for Collocation
PDF

[H. Signage]
H. Signage
PDF

[L. Noise]
L. Noise
PDF

[5.05.06 Removal of Abandoned Towers]
5.05.06 Removal of Abandoned Towers
PDF

[To ZBOA: Variance request for placement of tower on parcel 0008 010]
To ZBOA: Variance request for placement of tower on parcel 0008 010
PDF

[Page 12]
Page 12
PDF

[Page 13]
Page 13
PDF

[RF Justification with propagation maps SALEM CHURCH]
RF Justification with propagation maps SALEM CHURCH
PDF

[Verizon Service Area]
Verizon Service Area
PDF

[Existing Verizon sites list around proposed site SALEM CHURCH]
Existing Verizon sites list around proposed site SALEM CHURCH
PDF

[Verizon: Distance of proposed site to the existing VZW sites]
Verizon: Distance of proposed site to the existing VZW sites
PDF

[Inventory of existing towers around the SALEM CHURCH search are -- Google earth map]
Inventory of existing towers around the SALEM CHURCH search are -- Google earth map
PDF

[Inventory of existing towers around the SALEM CHURCH search area -- Table]
Inventory of existing towers around the SALEM CHURCH search area -- Table
PDF

[Verizon: Existing LTE Coverage]
Verizon: Existing LTE Coverage
PDF

[Verizon: Proposed LTE Coverage with SALEM CHURCH_Site — 350 feet Rad. Center]
Verizon: Proposed LTE Coverage with SALEM CHURCH_Site — 350 feet Rad. Center
PDF

[OVERALL SITE PLAN OVERLAY]
OVERALL SITE PLAN OVERLAY
PDF

[OVERALL SITE PLAN with distances]
OVERALL SITE PLAN with distances
PDF

[FENCE DETAILS]
FENCE DETAILS
PDF

[LANDSCAPING DETAILS]
LANDSCAPING DETAILS
PDF

[Signage]
Signage
PDF

[FAA DETERMINATION OF NO HAZARD TO AIR NAVIGATION]
FAA DETERMINATION OF NO HAZARD TO AIR NAVIGATION
PDF

[Page 28]
Page 28
PDF

[Page 29]
Page 29
PDF

[BASIS FOR DECISION]
BASIS FOR DECISION
PDF

[Frequency Data for ASN 2025-ASO-18699-OE]
Frequency Data for ASN 2025-ASO-18699-OE
PDF

[Verified Map for ASN 2025-ASO-18699-OE]
Verified Map for ASN 2025-ASO-18699-OE
PDF

[B=T Group is pleased to submit this “Fall Certification Letter” for the 355’ guyed tower to be constructed at the Salem Church (US-GA-5707) site.]
B=T Group is pleased to submit this “Fall Certification Letter” for the 355’ guyed tower to be constructed at the Salem Church (US-GA-5707) site.
PDF

[Zoning Location Map]
Zoning Location Map
PDF

[Future Development Map]
Future Development Map
PDF

[WRPDO Site Map]
WRPDO Site Map
PDF

HA-2026-02 Terry Belanger, 504 Stagecoach Trail, Map and Parcel 0046D 196

[proposing a building addition on the rear side of their residence, which would be approximately 10 feet from the rear property line, instead of meeting the minimum required setback distance of 20 feet.]
proposing a building addition on the rear side of their residence, which would be approximately 10 feet from the rear property line, instead of meeting the minimum required setback distance of 20 feet.
PDF

VA-2026-09 Dale and Robin Watts, 2480 East Park Avenue, 8.2 ac

[to eliminate the existing split-zoning status and establish consistent zoning across the entire parcel, thereby allowing the property to be more effectively marketed and positioned for future development.]
to eliminate the existing split-zoning status and establish consistent zoning across the entire parcel, thereby allowing the property to be more effectively marketed and positioned for future development.
PDF

VA-2026-10 RST Construction, NW corner of Cherry Creek Rd & Lake Laurie Dr

[to replat and develop the property with 87 single-family dwellings in phases on small individual lots, arranged throughout a designated open space area along a private street system that has gated access from the public streets outside the development. Lot sizes will average just a little more than 6,000 square feet, with homes mandated to be at least 2,100-sf of indoor heated floor area and a maximum of 2 floors.]
to replat and develop the property with 87 single-family dwellings in phases on small individual lots, arranged throughout a designated open space area along a private street system that has gated access from the public streets outside the development. Lot sizes will average just a little more than 6,000 square feet, with homes mandated to be at least 2,100-sf of indoor heated floor area and a maximum of 2 floors.
PDF

[Staff_Recommendation: Find inconsistent with the Comprehensive Plan and the Planned Development Review Criteria, and recommend DENIAL to the City Council.]
Staff_Recommendation: Find inconsistent with the Comprehensive Plan and the Planned Development Review Criteria, and recommend DENIAL to the City Council.
PDF

[Planning Analysis & Property Information]
Planning Analysis & Property Information
PDF

[Proposed Deviations from “standard development regulations”]
Proposed Deviations from “standard development regulations”
PDF

[Comprehensive Plan Issues]
Comprehensive Plan Issues
PDF

[Supplemental Regulations in the LDR Applicable to the Proposal]
Supplemental Regulations in the LDR Applicable to the Proposal
PDF

[Development Review Comments]
Development Review Comments
PDF

[Attachments]
Attachments
PDF

[Zoning Location Map]
Zoning Location Map
PDF

[Future Development Map]
Future Development Map
PDF

[Aerial Location Map]
Aerial Location Map
PDF

[LETTER of AUTHORIZATION by Phillip Connell]
LETTER of AUTHORIZATION by Phillip Connell
PDF

[LETTER OF INTENT]
LETTER OF INTENT
PDF

[General Overview]
General Overview
PDF

[Site Planning]
Site Planning
PDF

[P-D Overlay Map for: North Park]
P-D Overlay Map for: North Park
PDF

[PD Concept Map]
PD Concept Map
PDF

[Lot Style Map]
Lot Style Map
PDF

[Map just lots no lake]
Map just lots no lake
PDF

[Typical Road Section]
Typical Road Section
PDF

[Conceptual Renderings]
Conceptual Renderings
PDF

[Page 22]
Page 22
PDF

[Public Response Letters & Emails]
Public Response Letters & Emails
PDF

[Lisa Thomas Gill objects]
Lisa Thomas Gill objects
PDF

[James E. Corbett objects]
James E. Corbett objects
PDF

[Page 26]
Page 26
PDF

[Page 27]
Page 27
PDF

[Page 28]
Page 28
PDF

[Amy Woods objects]
Amy Woods objects
PDF

[Stephen Johnson objects]
Stephen Johnson objects
PDF