Packet: GLPC appointments, ULDC Amendments, 2 rezonings, Street Lighting, Beer and Wine, UPS, infrastructure acceptance, Regional Transit, Georgia Power, VSU, LMIG, Fire @ LCC 2024-11-12 [Up]
LAKE blog posts:
- Packet: GLPC appointments, ULDC Amendments, 2 rezonings, Street Lighting, Beer and Wine, UPS, infrastructure acceptance, Regional Transit, Georgia Power, VSU, LMIG, Fire @ LCC 2024-11-12.
Collage: GLPC appointments, ULDC text amendments, VSU South Campus Purchase, etc. @ LCC 2024-11-12
PROPOSED AGENDA
The term of Mr. Ed Hightower and the term previously held by Ms. Vicki Biles has expired. Mr. Hightower has expressed a desire to be reappointed. Mr. Calvin Graham, Mr. Brice Evans, and Mr. Blake Robinson have expressed an interest in being appointed.
general amendments to the Code regarding the maximum number of lots accessible from a single point of ingress/egress, the creation, implementation and enforcement of a tree bank, and administrative and/or clerical changes.
to subdivide a portion of the properties into a residential subdivision. road frontage on Loch Laurel and Carroll Ulmer
to allow the property to be used at its highest and best potential.
testing the financial solvency of the addition. Additionally, notice for the proposed district has been
Signature
Subdivision Survey for Quarterman Estates Phase V
Final Plat for Bemiss Springs LLC (south)
Petition for Addition, Hamilton Green
change of ownership
consumption on premises. This is a new location for this establishment.
BUDGET IMPACT: Total: $72,103.12 The current units at the tower sites are reaching their end of life and soon will not be supported. The current UPS at the Valdosta tower was installed on 9/13/2002 (22 years old). The current UPS at the Clyattville tower was installed on 10/31/2002 (22 years old).
BUDGET IMPACT: N/A located in the southern portion of Lowndes County off of White Water Road and includes twenty-nine (29) lots.
The Southern Georgia Regional Commission voted at their August 22nd meeting to apply for the FY2026 5311 Rural Transportation Program Grant Funding from the Georgia Department of Transportation (GDOT) in order to continue operating the regional transit system on behalf of the participating local municipalities.
Hunt Road is an existing county road that intersects with Inner Perimeter Road in the eastern portion of Lowndes County. Valdosta-Lowndes County Development Authority developed an additional 0.29 miles onto the west end of Hunt Road to accommodate industrial growth. Valdosta-Lowndes County Development Authority has made the request for Lowndes County to accept the 0.29 miles of infrastructure which includes the road and drainage pipe.
to run a new underground power line to feed the Francis Lake office and lift station.
BUDGET IMPACT: $2,156,000.00 Staff has negotiated the purchase of a ±4.728 acre tract of real property known as Valdosta State University South located on North Patterson Street across from the Crescent (the “Property”). The seller is the Board of Regents of the University System of Georgia.
Survey
Survey
Page 164
BUDGET IMPACT: $111,223.17 includes restriping 32 linear miles of paved county roads.
GFOA, LRA, GMP
BUDGET IMPACT: $1,656,734.49 If approved, the LRA funds will be used for the Val Del Road at North Valdosta Road Intersection Improvements and restriping approximately 35 miles of paved roads.
BUDGET IMPACT: $85,097.40 Lowndes County solicited bids for 60 SCBA cylinders for the Fire Department. The Fire Department began last year replacing 180 cylinders which would be expiring within three years. This is a continuation of that plan to replace one-third of the cylinders per year. The County received two bids.
|