owl LAKE

Packet: Two Lowndes County Cases, Commercial on Stewart Circle, Tower on Rocky Ford Road @ GLPC 2025-09-29 [Up]

LAKE blog post:

Item found on lowndescounty.com:

Items received in response to a LAKE open records request:

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!

MMM

[Collage, GLPC Packet, 2025-09-29]
Collage, GLPC Packet, 2025-09-29

GLPC-Agenda-September-2025

[Two Lowndes County Cases 2025-09-29]
Two Lowndes County Cases 2025-09-29
PDF

REZ-2025-15-GLPC-Packet

[to unify the zoning for the property to be developed with a mixture of commercial uses.]
to unify the zoning for the property to be developed with a mixture of commercial uses.
PDF

TWR-2025-01-GLPC-Packet

[to construct a new ~260’ telecommunications tower on a 10,000sf leased area on Rock Ford Road near Watkins Road.]
to construct a new ~260’ telecommunications tower on a 10,000sf leased area on Rock Ford Road near Watkins Road.
PDF

2025-08-25-GLPC-Minutes-DRAFT

[3. REZ-2024-06, Horace Ave.]
3. REZ-2024-06, Horace Ave.
PDF

[Section 4.02.03 (attached) lists supplemental design standards and restricted uses within these]
Section 4.02.03 (attached) lists supplemental design standards and restricted uses within these
PDF

[A. Tabling B. Approval with Conditions]
A. Tabling B. Approval with Conditions
PDF

[C. Deny]
C. Deny
PDF

[4. REZ-2025-14, Dinkins, 6533 Lake Alapaha Blvd.]
4. REZ-2025-14, Dinkins, 6533 Lake Alapaha Blvd.
PDF

[5. LP-2025-01 Lake Park Church of Christ/Steve Magee, 610, 614, 618 Sheavette Rd.,]
5. LP-2025-01 Lake Park Church of Christ/Steve Magee, 610, 614, 618 Sheavette Rd.,
PDF

[6. CU-2025-07, Valeria Dwyer]
6. CU-2025-07, Valeria Dwyer
PDF

[to have living more space for herself.]
to have living more space for herself.
PDF

[7. VA-2025-07, SharpeCo]
7. VA-2025-07, SharpeCo
PDF

[8. VA-2025-08, Andrew Duren]
8. VA-2025-08, Andrew Duren
PDF

[to be able to streamline the process for potential future development/use, particularly with regard to professional office use.]
to be able to streamline the process for potential future development/use, particularly with regard to professional office use.
PDF

[9. VA-2025-09, George T. Biles]
9. VA-2025-09, George T. Biles
PDF

[the proposal is for 64 residential lots for this initial phase and that detention pond and city water/sewer will be utilized. Additionally, the development plan will include a decel lane off Bemiss Rd. as well as 2 points of ingress/egress.]
the proposal is for 64 residential lots for this initial phase and that detention pond and city water/sewer will be utilized. Additionally, the development plan will include a decel lane off Bemiss Rd. as well as 2 points of ingress/egress.
PDF

[10. VA-2025-10, George T. Biles, annex 6.17 acres into the City of Valdosta]
10. VA-2025-10, George T. Biles, annex 6.17 acres into the City of Valdosta
PDF

[11. VA-2025-11, Stoker Development]
11. VA-2025-11, Stoker Development
PDF

[leaves open the “possibility” of up to 9 dwelling units with a quality Planned Development proposal.]
leaves open the “possibility” of up to 9 dwelling units with a quality Planned Development proposal.
PDF

[Commissioner Foreman asked Mr. Martin if the rendering presented is what is intended to be built. Mr. Martin emphasized the rendering is strictly a conceptual plan.]
Commissioner Foreman asked Mr. Martin if the rendering presented is what is intended to be built. Mr. Martin emphasized the rendering is strictly a conceptual plan.
PDF

[12. Reappointment of Commissioner Chip Wildes (by the City of Valdosta), 13. 2025 Comprehensive Plan Update]
12. Reappointment of Commissioner Chip Wildes (by the City of Valdosta), 13. 2025 Comprehensive Plan Update
PDF