{"id":8577,"date":"2014-04-30T11:56:10","date_gmt":"2014-04-30T15:56:10","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=8577"},"modified":"2014-05-01T07:50:40","modified_gmt":"2014-05-01T11:50:40","slug":"2-megawatts-solar-in-lanier-county","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2014\/04\/2-megawatts-solar-in-lanier-county.html","title":{"rendered":"2 megaWatts solar in Lanier County"},"content":{"rendered":"<p>\nSomebody told me a few weeks ago there&#8217;s a big solar farm near Lakeland.<br \/>\nHe was not very specific about where, but it&#8217;s big: two megawatts,<br \/>\norganized by a company out of Chicago.<br \/>\nCan anybody point me to where it is so I can go take pictures?<\/p>\n<p>\n<a href=\"http:\/\/www.evergreensolarservices.com\/projects\/index.php#lakeland\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;\" src=\"http:\/\/www.evergreensolarservices.com\/projects\/images\/lakeland\/3-thumb.jpg\"><\/a><br \/>\n<a href=\"http:\/\/www.evergreensolarservices.com\/projects\/index.php#lakeland\"><br \/>\nEvergreen Solar Services says<\/a>,<\/p>\n<blockquote style=\"font-size:100%\">\n<p>\n2.0 MW Lakeland, GA<br \/>\n<br \/>\nCompleted in 2014, 2 &mdash; 1.0 MW Georgia Power ASI projects.<br \/>\nFixed tilt PV with central inverters, medium voltage interconnected.\n<\/p>\n<\/blockquote>\n<p>\nYou can see by this Evergreen Solar Services picture that<!--more--><br \/>\nat least one set of panels (facing south) is next to an east-west road<br \/>\nwhere a north-south road joins at a T intersection.<br \/>\nWhere exactly that is, none of the participating companies seem to say.<\/p>\n<p style=\"text-align:center\">\n<a href=\"http:\/\/www.evergreensolarservices.com\/projects\/index.php#lakeland\"><br \/>\n<img decoding=\"async\" style=\"border:none;width:600px\" src=\"http:\/\/www.evergreensolarservices.com\/projects\/images\/lakeland\/4-large.jpg\"><\/a><\/p>\n<p>\nI can&#8217;t find any mention by Georgia Power of this solar installation.<br \/>\nHowever, GA PSC shows in its<br \/>\n<a href=\"http:\/\/www.psc.state.ga.us\/factsv2\/Docket.aspx?docketNumber=1\"><br \/>\nDocket #1 &#8220;Electric Non-Docket 1997&#8221;<\/a>,<br \/>\nalong with numerous Georgia Power Company filings,<br \/>\n<a href=\"http:\/\/www.psc.state.ga.us\/factsv2\/Document.aspx?documentNumber=150604\"><br \/>\nthis one<\/a>:<\/p>\n<table>\n<tr>\n<th>\nFiling #\n<\/th>\n<th>\nCompany Name:\n<\/th>\n<th>\nFiled Date:\n<\/th>\n<th>\nReceived Date:\n<\/th>\n<th>\nDescription:\n<\/th>\n<\/tr>\n<tr>\n<td>\n150604<\/td>\n<td>Lakeland Solar Energy, LLC<\/td>\n<td>11\/15\/2013<\/td>\n<td>11\/15\/2013<\/td>\n<td>Regulations copy of Notice of Self-Certification of Exempt Wholesale Generator status that Lakeland Solar Energy, LLC filed with FERC.<\/td>\n<\/tr>\n<\/table>\n<p>\nThat links to<br \/>\n<a href=\"http:\/\/www.gpo.gov\/fdsys\/pkg\/FR-2014-02-27\/pdf\/2014-04280.pdf\"><br \/>\na Federal Register page<\/a><br \/>\nthat gives a docket number of EG14-13-000.<br \/>\nLooking that up gets:<br \/>\n<a href=\"https:\/\/www.federalregister.gov\/articles\/2014\/02\/27\/2014-04280\/notice-of-effectiveness-of-exempt-wholesale-generator-or-foreign-utility-company-status\"><br \/>\nNotice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status:<br \/>\nA Notice by the Federal Energy Regulatory Commission on 02\/27\/2014<\/a>,<\/p>\n<blockquote style=\"font-size:100%\">\n<table>\n<tr>\n<td>Lakeland Solar Energy LLC<\/td>\n<td>EG14-13-000<\/td>\n<\/tr>\n<tr>\n<td>New AERG, LLC<\/td>\n<td>EG14-14-000<\/td>\n<\/tr>\n<tr>\n<td>Ameren Energy Generating Company<\/td>\n<td>EG14-15-000<\/td>\n<\/tr>\n<tr>\n<td>Soci\u00e9t\u00e9 de cog\u00e9n\u00e9ration de St-F\u00e9licien, Soci\u00e9t\u00e9 en commandite<\/td>\n<td>FC14-10-000<\/td>\n<\/tr>\n<\/table>\n<p>\nTake notice that during the month of January 2014, the status of the above-captioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission&#8217;s regulations. 18 CFR 366.7(a).Show citation box<\/p>\n<p>\nDated: February 20, 2014.<br \/>\n<br \/>\nKimberly D. Bose,<br \/>\n<br \/>\nSecretary.<br \/>\n<br \/>\n[FR Doc. 2014-04280 Filed 2-26-14; 8:45 am]\n<\/p><\/blockquote>\n<p>\nOK, so using FERC&#8217;s document search finds<br \/>\nInvenergy&#8217;s 28 April 2014 filing with FERC of<br \/>\n<a href=\"http:\/\/elibrary.ferc.gov\/idmws\/file_list.asp\"><br \/>\nForm 561 Annual Report of Interlocking Positions for calendar year 2013 under ID-4613, et. al.<\/a>,<br \/>\nwhich<br \/>\nshows five Invenergy people with interlocking positions with Lakeland Solar Energy LLC:<br \/>\nMichael J. Baird, Joseph Condo, James T. Murphy, Michael Polsky, and James J. Shield.<br \/>\nWhich is fascinating, but still doesn&#8217;t tell us where Lakeland Solar Farm is.<\/p>\n<p>\nLakeland Solar Energy LLC is filed with<br \/>\n<a href=\"https:\/\/cgov.sos.state.ga.us\/Account.aspx\/ViewEntityData?entityId=4778929\"><br \/>\nGeorgia Secretary of State<\/a><br \/>\nas a Delaware LLC, with principal office One South Wacker Drive Suite 1900, Chicago, IL 60606.<br \/>\nIt shows no officers and no local address in Georgia.<br \/>\nLanier County Tax Assessor shows no land owned by Lakeland Solar Energy,<br \/>\nnor by Invenergy.<\/p>\n<p>\nThe engineering company, Blue Oak Energy Inc., doesn&#8217;t seem to have<br \/>\nanything on this installation; they apparently usually go for much<br \/>\nbigger ones.<\/p>\n<p>\nHere&#8217;s Invenergy PR of 23 December 2013,<br \/>\n<a href=\"http:\/\/www.invenergyllc.com\/Portals\/0\/LakelandSolar%20COD%20PrsRls%20(FINAL).pdf\"><br \/>\nInvenergy Announces Commercial Operations at Lakeland Solar Farms<\/a><\/p>\n<blockquote style=\"font-size:100%\">\n<p>\n<a href=\"http:\/\/www.invenergyllc.com\/ProjectsbyCountry\/UnitedStates\/Lakeland.aspx\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.invenergyllc.com\/Portals\/_default\/Skins\/ProjectPage\/images\/Invenergy-Logo.png\"><\/a><br \/>\nCHICAGO, Illinois&mdash;(December 23, 2013) &mdash; Today, Invenergy<br \/>\nClean Power LLC (&ldquo;Invenergy&rdquo;) announced the recent<br \/>\ncompletion of construction and the start of commercial operations of<br \/>\nits Lakeland Solar Farms (&ldquo;Lakeland&rdquo;), located<br \/>\napproximately 20 miles northeast of Valdosta, Georgia.\n<\/p>\n<p>\n<a href=\"http:\/\/www.invenergyllc.com\/ProjectsbyCountry\/UnitedStates\/Lakeland.aspx\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.invenergyllc.com\/portals\/0\/Lakeland%20-%20solar%20farm%20-%20both%20projects%20(2).jpg\"><\/a><br \/>\nLakeland consists of two 1 MW solar photovoltaic facilities in<br \/>\nLanier County. Output from the plants is sold to Georgia Power under<br \/>\nlong-term power purchase agreements, awarded to Invenergy under the<br \/>\nutility&#8217;s Medium-Scale Advanced Solar Initiative.\n<\/p>\n<p>\n&ldquo;Lakeland is our first power generation facility in Georgia,<br \/>\nand we&#8217;re really pleased to create a new source of clean, homegrown<br \/>\nenergy in Lanier County,&rdquo; said Jim Shield, Chief Development<br \/>\nOfficer at Invenergy. &ldquo;We greatly appreciate the support we&#8217;ve<br \/>\nreceived, and are proud to invest in the local area. Invenergy looks<br \/>\nforward to a longterm, successful relationship with our host<br \/>\ncommunity.&rdquo;\n<\/p>\n<p>\nConstruction on Lakeland began in October of 2013 and created 50<br \/>\ntemporary jobs. Evergreen Solar Services served as the general<br \/>\n<a href=\"http:\/\/www.blueoakenergy.com\/\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.blueoakenergy.com\/images\/logo.gif\"><\/a><br \/>\ncontractor, and Blue Oak Energy Inc. performed engineering duties.<br \/>\nThe solar farms bring further economic benefit through annual<br \/>\nproperty tax payments.\n<\/p>\n<p>\nLakeland, which features more than 6,800 photovoltaic (PV) solar<br \/>\nmodules, is operated and maintained by Invenergy Services, an<br \/>\naffiliate of Invenergy.\n<\/p>\n<p><H4>About Invenergy<\/H4><\/p>\n<p>\nInvenergy and its affiliated companies develop, own and operate<br \/>\nlarge-scale renewable and other clean energy generation facilities<br \/>\nin North America and Europe. North America&#8217;s largest independent<br \/>\nwind power generation company, Invenergy is committed to clean power<br \/>\nalternatives and continued innovation in electricity generation. The<br \/>\ncompany&#8217;s home office is located in Chicago and it has regional<br \/>\ndevelopment offices throughout the United States and in Canada and<br \/>\nEurope.\n<\/p>\n<p>\nInvenergy has developed approximately 8,000 MW of clean energy<br \/>\nprojects that are in operation, in construction, or under contract,<br \/>\nincluding 63 wind, solar, and natural gas power facilities. For more<br \/>\ninformation, please visit<br \/>\n<a href=\"http:\/\/www.invenergyllc.com\/\"><br \/>\nwww.invenergyllc.com<\/a>.\n<\/p>\n<p style=\"text-align:center\">\n# # #<\/p>\n<p>\nContact:<br \/>\n<br \/>\nAlissa Krinsky<br \/>\n<br \/>\nDirector of Communications<br \/>\n<br \/>\n312-582-1554 or akrinsky@invenergyllc.com\n<\/p><\/blockquote>\n<p>\n<strong>Update 7:50 AM 1 May 2014:<\/strong> And <a href=\"http:\/\/www.l-a-k-e.org\/blog\/2014\/05\/burnt-church-road-2-megawatts-solar-in-lanier-county.html\">here&#8217;s the location<\/a>.<\/p>\n<p>\n -jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Somebody told me a few weeks ago there&#8217;s a big solar farm near Lakeland. He was not very specific about where, but it&#8217;s big: two megawatts, organized by a company out of Chicago. Can anybody point me to where it is so I can go take pictures? Evergreen Solar Services says, 2.0 MW Lakeland, GA [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[202,14,17,18,2676,24],"tags":[8750,7615,1275,8704,7614,7616,785,8707,8701,8708,1276,7613,8702,8858,1733,12,7,8714,6],"class_list":["post-8577","post","type-post","status-publish","format-standard","hentry","category-agriculture","category-economy","category-ga-psc","category-georgia-power","category-lakeland","category-solar","tag-agriculture","tag-blue-oak-energy","tag-chicago","tag-economy","tag-evergreen-solar-services","tag-federal-register","tag-ferc","tag-ga-psc","tag-georgia","tag-georgia-power","tag-illinois","tag-invenergy","tag-lake","tag-lakeland","tag-lanier-county","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-solar","tag-valdosta"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/8577","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=8577"}],"version-history":[{"count":6,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/8577\/revisions"}],"predecessor-version":[{"id":8614,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/8577\/revisions\/8614"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=8577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=8577"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=8577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}