{"id":7257,"date":"2013-12-25T11:37:15","date_gmt":"2013-12-25T16:37:15","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=7257"},"modified":"2013-12-25T11:40:21","modified_gmt":"2013-12-25T16:40:21","slug":"warren-buffett-moves-from-nuclear-to-wind","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2013\/12\/warren-buffett-moves-from-nuclear-to-wind.html","title":{"rendered":"Warren Buffett moves from nuclear to wind"},"content":{"rendered":"<p>\n<a href=\"http:\/\/www.siemens.com\/press\/en\/feature\/2013\/energy\/2013-12-fort-madison.php?content[]=CC&#038;content[]=E&#038;content[]=ES&#038;content[]=EW&#038;stop_mobi=true\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.siemens.com\/press\/pool\/de\/feature\/2013\/energy\/feature-2013-12-Fort-Madison.jpg\"><\/a><br \/>\nHow to get Georgia Power and Southern Company off of<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/hot-topics\/nuclear.html\"><br \/>\nnuclear<\/a><br \/>\nand onto offshore wind and onshore solar power: stop approving<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/category\/cwip\"><br \/>\nConstruction Work in Progress (CWIP)<\/a><br \/>\nrate hikes for nukes that are already a billion dollars<br \/>\nover budget and more than a year late.<br \/>\nSo far Mississippi is doing better about this than Georgia,<br \/>\nby<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/11\/mississippi-psc-required-spending-docs-for-kemper-coal-what-about-plant-vogtle.html\"><br \/>\ncapping ratepayer and taxpayer costs for Kemper Coal<\/a>.<br \/>\nIowa did, and look what happened.<\/p>\n<p>\nSimplyInfo wrote 23 December 2013,<br \/>\n<a href=\"http:\/\/www.fukuleaks.org\/web\/?p=11970\"><br \/>\nWhat Power Companies Do When Nuclear Is No Longer An Easy Option<\/a>,<!--more--><\/p>\n<blockquote style=\"font-size:100%\"><p>\nMidAmerican Energy in the US tried for years to force Iowa<br \/>\nresidents to pre-pay for a nuclear power plant. Those <a\nhref=\"http:\/\/www.fukuleaks.org\/web\/?p=6037\" target=\"_blank\">efforts<br \/>\nfailed twice<\/a>, causing the company to stop trying to pass the new<br \/>\nlaw. As of February 2013 MidAmerican Energy owner Warren Buffett <a\nhref=\"http:\/\/www.fukuleaks.org\/web\/?p=9652\" target=\"_blank\">continued<br \/>\nto express his interest in building two nuclear power plants in<br \/>\nIowa<\/a>. Without public funding for nuclear and a public that has<br \/>\nbeen strongly against any new nuclear plants in Iowa, Buffett changed<br \/>\nhis mind.<\/p>\n<p>MidAmerican Holdings <a\nhref=\"http:\/\/www.daynews.com\/environment\/environmental-news\/2013\/12\/warren-buffet-makes-largest-land-based-wind-power-investment-purchases-wind-turbines-1b-23282\"\ntarget=\"_blank\">ordered 1 billion USD worth of new wind turbines<\/a>. This<br \/>\nwill purchase 448 wind turbines that will make 1050 megawatts of power,<br \/>\nabout equal to one new nuclear power plant in capacity. Without public<br \/>\nsupport and public money to risk for the investment Buffet in the end<br \/>\nwas unwilling to risk his own money and invested in wind instead.<\/p>\n<\/blockquote>\n<p>\nThe windmill parts are by Siemens, but manufactured in the U.S.,<br \/>\naccording to<br \/>\n<a href=\"http:\/\/www.midamericanenergy.com\/wind_news.aspx\"><br \/>\nPR by MidAmerican Energy 16 December 2013<\/a>:<\/p>\n<blockquote style=\"font-size:100%\">\n<p>\n<a href=\"http:\/\/www.kcrg.com\/home\/top-9\/Siemens-Energy-Wind-Turbine-Plant-Recalls-Workers-189490101.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;width:235px\" src=\"http:\/\/media.kcrg.com\/images\/470*264\/4461667+-+WIR+-+SIEMENS+ENERGY+WIND+TURBINE+BLADES+-+03_04_2009+-+14.42.261.jpg\"><\/a><br \/>\nSiemens Energy&#8217;s Fort Madison, Iowa, facility will manufacture all<br \/>\nthe blades, while the nacelles and hubs will be assembled at the<br \/>\nSiemens plant in Hutchinson, Kansas. All projects will utilize<br \/>\nSiemens&#8217; 2.3-megawatt, G2 platform wind turbines and will be<br \/>\ninstalled at MidAmerican Energy&#8217;s 500-megawatt Highland wind project<br \/>\nin O&#8217;Brien County; 250-megawatt Lundgren wind project in Webster<br \/>\nCounty; 138.6-megawatt Wellsburg wind project in Grundy County; and<br \/>\n117-megawatt Macksburg wind project located in Madison County. The<br \/>\norder also called for 19 wind turbines at the 44-megawatt Vienna II<br \/>\nwind project expansion in Marshall County, which is fully<br \/>\nconstructed and delivering energy to Iowans. In addition to the wind<br \/>\nturbines, the contract also includes a service, maintenance and<br \/>\nwarranty agreement.\n<\/p>\n<\/blockquote>\n<p>\n<a href=\"http:\/\/www.siemens.com\/press\/en\/feature\/2013\/energy\/2013-12-fort-madison.php?content[]=CC&#038;content[]=E&#038;content[]=ES&#038;content[]=EW&#038;stop_mobi=true\"><br \/>\nSiemens PR of 16 Dec 2013<\/a> concurs.<br \/>\nThis is still big baseload capacity thinking, but it&#8217;s<br \/>\nmuch better than FPL and Duke&#8217;s plan for<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/12\/duke-spokesman-for-closed-nuke-rate-hikes-touts-new-plant-for-sabal-trail-gas.html\"><br \/>\na 100-foot gash through here<br \/>\nfor an unneeded methane pipeline<\/a><br \/>\nwhen they could get just as much power through<br \/>\n<a href=\"www.l-a-k-e.org\/blog\/2013\/01\/rooftop-solar-the-most-direct-route-to-clean-energy-industries.html\"><br \/>\nrooftop solar rebates<\/a> and build local industry at the same time.<\/p>\n<p>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2012\/06\/solar-lowndes-high.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.l-a-k-e.org\/blog\/images\/6a0120a58214e4970b017d406fdeeb970c-pi.jpg\"><\/a><br \/>\nHey, what if Georgia Power ordered a gigawatt of solar panels from<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/category\/mage-solar\"><br \/>\nMAGE SOLAR in Dublin, GA<\/a> or<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/category\/suniva\"><br \/>\nSuniva of Norcross<\/a>?<br \/>\nThen Georgia Power could make Georgia and Southern Company could make the southeast<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/07\/sos-plan-to-make-the-southeast-a-net-exporter-of-the-energy-from-solar-and-wind-john-s-quarterman-so-2013-05-22.html\"><br \/>\na net exporter of the energy from solar<\/a>.<\/p>\n<p>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/12\/solar-oakland-schools-expect-45-savings.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;\" src=\"http:\/\/tessant.wpengine.netdna-cdn.com\/wp-content\/uploads\/sunpower-solar-academy.jpg\"><\/a><br \/>\nAnd we don&#8217;t have to wait on hidebound 20th century utilities.<br \/>\nOur own Industrial Authority could issue<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/12\/green-bonds-for-rooftop-solar.html\"><br \/>\ngreen bonds for rooftop solar<\/a>.<br \/>\nOur own school districts could<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/07\/moodys-confirms-excellent-bond-rating-for-lowndes-county-school-district.html\"><br \/>\nissue bonds for rooftop solar electricity bill savings<\/a><br \/>\nlike<br \/>\n<a href=\"http:\/\/www.ajc.com\/news\/ap\/energy\/ga-solar-panels-show-utility-vulnerabilities\/nYSR6\/\">Dublin, GA<\/a> already did.<br \/>\nOakland, CA schools just did that, and expects<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/12\/solar-oakland-schools-expect-45-savings.html\"><br \/>\n45% savings<\/a>.<\/p>\n<p>\n -jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How to get Georgia Power and Southern Company off of nuclear and onto offshore wind and onshore solar power: stop approving Construction Work in Progress (CWIP) rate hikes for nukes that are already a billion dollars over budget and more than a year late. So far Mississippi is doing better about this than Georgia, by [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[216,14,18,1105,104,22,23,24,178],"tags":[8753,8704,8701,8708,171,8702,8815,12,7,8737,6327,107,8712,8713,8714,108,6,8749,3292,8716],"class_list":["post-7257","post","type-post","status-publish","format-standard","hentry","category-coal","category-economy","category-georgia-power","category-lcboe","category-nuclear","category-politics","category-renewable-energy","category-solar","category-vlcia","tag-coal","tag-economy","tag-georgia","tag-georgia-power","tag-kemper-coal","tag-lake","tag-lcboe","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-nuclear","tag-plant-ratcliffe","tag-plant-vogtle","tag-politics","tag-renewable-energy","tag-solar","tag-southern-company","tag-valdosta","tag-vlcia","tag-warren-buffett","tag-wind"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/7257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=7257"}],"version-history":[{"count":2,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/7257\/revisions"}],"predecessor-version":[{"id":7259,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/7257\/revisions\/7259"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=7257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=7257"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=7257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}