{"id":6931,"date":"2013-12-06T09:04:23","date_gmt":"2013-12-06T14:04:23","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=6931"},"modified":"2013-12-06T09:08:08","modified_gmt":"2013-12-06T14:08:08","slug":"hear-sabal-trail-transmission-answer-questions-from-the-lowndes-county-commission","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2013\/12\/hear-sabal-trail-transmission-answer-questions-from-the-lowndes-county-commission.html","title":{"rendered":"Hear Sabal Trail Transmission answer questions from the Lowndes County Commission"},"content":{"rendered":"<p style=\"float:right\"><a href=\"http:\/\/spectrabusters.org\/wp-content\/uploads\/2013\/12\/2013-12-05-lcc-pr.pdf\">PDF<\/a><\/p><p>FOR IMMEDIATE RELEASE<\/p>\r\n<p>Valdosta, December 5, 2013\r\n&mdash;Representatives from Spectra Energy or its LLC Sabal Trail\r\nTransmission will speak at the Monday morning Lowndes County\r\nCommission Work Session and answer questions from\r\nCommissioners.<\/p>\r\n<p style=\"margin-left:1em; \">\r\n<a href=\"https:\/\/www.facebook.com\/events\/432702786853161\/\">\r\n<img decoding=\"async\" style=\"float:right;border:none;width:313px\" src=\"https:\/\/scontent-a-atl.xx.fbcdn.net\/hphotos-ash3\/1450123_10152042260667902_1957219883_n.jpg\"><\/a>\r\n<b><big>When:&nbsp;<\/big><\/b>\r\n<big>8:30 AM <br>\r\nMonday, December 9th, 2013<\/big><\/p>\r\n<p style=\"margin-left:1em; \"><big><b>Where:<\/b>\r\nCommission Chambers <br>\r\n327 North Ashley Street, 2<small><sup>nd<\/sup><\/small> Floor <br>\r\nValdosta, GA 31601 <br>\r\n229-671-2442<\/big><\/p>\r\n<p><b>Questions:<\/b> <br>\r\ncommissioner@lowndescounty.com<\/p>\r\n<p><b>Why:<\/b> Spectra Energy\r\nproposes a hundred-foot-wide gash through our lands for\r\ntheir huge 36&nbsp;inch Sabal Trail gas pipeline from\r\nAlabama through Georgia to feed Florida Power and Light\r\n(FPL) for no benefit to local citizens. A one-time payment\r\nis nowhere near adequate for permanent destruction and\r\nhazards when FPL and Spectra would continue to profit\r\nforever.<\/p>\r\n<p><b>Property values:<\/b> A\r\npipeline through your property isn&rsquo;t<!--more--> going to increase\r\nits value, and being a pipeline corridor isn&rsquo;t going\r\nto attract businesses.<\/p>\r\n<p><b>Hazards:<\/b> The\r\nEnvironmental Protection Agency (EPA) fined Spectra a record\r\n$15 million for leaking PCBs at 89 sites along another\r\npipeline. The Pipeline and Hazardous Materials Safety\r\nAdministration (PHMSA) fined Spectra $134,500 in December\r\n2012 for five violations of federal regulations and\r\nSpectra&rsquo;s own company procedures, involving not\r\nmonitoring pipelines and letting them corrode and leak.<\/p>\r\n<p>This 36&nbsp;inch pipeline would\r\nbe bigger than the 30&nbsp;inch gas pipeline that blew up in\r\nOklahoma a few weeks ago, visible from Kansas and Texas, and\r\nfar bigger than the 10&nbsp;inch one that blew up in Texas\r\nlast week.. It is nowhere near safe enough to run anywhere\r\nnear schools, churches, people&rsquo;s houses, or\r\nwildlife.<\/p>\r\n<p><b>Fracking:<\/b> The gas comes\r\nfrom fracking in the Marcellus Shale in Pennsylvania and the\r\nBarnett Shale in Texas, destroying whole watersheds and\r\npoisoning farmlands and drinking water.<\/p>\r\n<p><b>Instead:<\/b> Solar power is\r\ncheaper and brings jobs and energy right here where we need\r\nthem.<\/p>\r\n<p>\r\n<a href=\"https:\/\/www.facebook.com\/spectrabusters\">\r\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"https:\/\/fbcdn-profile-a.akamaihd.net\/hprofile-ak-ash2\/c69.0.652.652\/s200x200\/1378346_171928686336134_1536380753_n.png\"><\/a>\r\n<b>SpectraBusters:<\/b> <i>We\r\nain&rsquo;t afraid a no pipeline!<\/i> <br>\r\nWe are a coalition of landowners and others opposed to the\r\nSabal Trail Transmission gas pipeline through Alabama,\r\nGeorgia, and Florida.<\/p>\r\n<p><b>Contact:<\/b> <br>\r\nspectrabusters@gmail.com <br>\r\nhttp:\/\/spectrabusters.org <br>\r\n<a href=\"https:\/\/www.facebook.com\/events\/432702786853161\/\">\r\nfacebook event<\/a>\r\n<br>\r\n<a href=\"https:\/\/www.facebook.com\/spectrabusters\">facebook page<\/a>\r\n<\/p>\r\n<p>\r\nDon Brotherton\r\n<br>\r\nLowndes Co., GA <br>\r\n229-251-7417<\/p>\r\n<p>\r\nSandra Y. Jones\r\n<br>\r\nColquitt Co., GA <br>\r\n229-941-5774<\/p>\r\n<p>\r\nBeth Gordon\r\n<br>\r\nLevy Co., FL <br>\r\n352-528-0111<\/p>\r\n<p style=\"text-align:center\">\r\n###\r\n<\/p>","protected":false},"excerpt":{"rendered":"PDFFOR IMMEDIATE RELEASE Valdosta, December 5, 2013 &mdash;Representatives from Spectra Energy or its LLC Sabal Trail Transmission will speak at the Monday morning Lowndes County Commission Work Session and answer questions from Commissioners. When:&nbsp; 8:30 AM Monday, December 9th, 2013 Where: Commission Chambers 327 North Ashley Street, 2nd Floor Valdosta, GA 31601 229-671-2442 Questions: commissioner@lowndescounty.com [&hellip;]","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_links_to":"","_links_to_target":""},"categories":[8,88,6124,6687,73,3],"tags":[8701,8702,12,7,8734,562,6076,6597,8731,6966,7122,8700,6],"class_list":["post-6931","post","type-post","status-publish","format-standard","hentry","category-georgia","category-lowndes-county-commission","category-natural-gas-2","category-pipeline-2","category-safety","category-transparency","tag-georgia","tag-lake","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-lowndes-county-commission","tag-natural-gas","tag-pipeline","tag-sabal-trail-transmission","tag-safety","tag-spectra-energy","tag-spectrabusters","tag-transparency","tag-valdosta"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p585fK-1NN","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/6931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=6931"}],"version-history":[{"count":2,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/6931\/revisions"}],"predecessor-version":[{"id":6933,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/6931\/revisions\/6933"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=6931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=6931"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=6931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}