{"id":6274,"date":"2013-10-23T06:16:58","date_gmt":"2013-10-23T10:16:58","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=6274"},"modified":"2013-10-23T06:30:26","modified_gmt":"2013-10-23T10:30:26","slug":"dominion-buying-up-solar-projects","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2013\/10\/dominion-buying-up-solar-projects.html","title":{"rendered":"Dominion buying up solar projects"},"content":{"rendered":"<p>\nA Virginia electric utility bought a solar project near Georgia Power&#8217;s<br \/>\nnuclear plant Vogtle, and has been busily buying up four more,<br \/>\nin Indiana and Connecticut.<br \/>\nThe Georgia electric customer is<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2012\/04\/were-just-ripe-for-solar-power-cobb-emc.html\"><br \/>\nrecent coal-to-solar convert Cobb EMC<\/a>, not Georgia Power.<br \/>\nThis is the same Dominion Power that got Virginia to legalize its<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/10\/georgia-power-wants-to-charge-you-for-your-solar-power.html\"><br \/>\n&#8220;standby charge&#8221; of a monthly fee for individuals to connect solar to its grid<\/a>.<br \/>\nIs Dominion trying to beat <a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/04\/solar-could-burn-utility-business-model.html\"><br \/>\nEdison Electric&#8217;s warning of the disruptive challenge of rooftop solar<\/a><br \/>\nby building large solar plants?<br \/>\nIf so, it&#8217;s a start, with quite a few construction jobs.<br \/>\nAnd all of this new solar power is expected to be online this year,<br \/>\na lot faster than nuclear&#8230;.<\/p>\n<p>\nDominion says of its<br \/>\n<a href=\"https:\/\/www.dom.com\/about\/stations\/renewable\/solar\/azalea-solar-power-facility.jsp\"><br \/>\nAzalea Solar Power Facility<\/a>:<\/p>\n<blockquote>\n<p><img decoding=\"async\" style=\"float:right;border:none\" title=\"Location of Azalea Solar Power Facility \" alt=\"Location of Azalea Solar Power Facility \" src=\"http:\/\/www.dom.com\/about\/stations\/renewable\/solar\/images\/azalea-map.jpg\" \/>Dominion announced on March 1, 2013, that it has acquired a solar energy development project in Georgia from Smart Energy Capital and Jacoby Development. The expected start of commercial operations is Dec. 1, 2013. (&gt; <a href=\"http:\/\/dom.mediaroom.com\/2013-03-01-Dominion-to-Build-Solar-Power-Project-in-Georgia\">View our news release<\/a> for complete details.)<\/p>\n<p>Dominion&#8217;s Azalea Solar Power Facility is planned to produce approximately 7.7 megawatts (AC) using photovoltaic technology. Dominion will select a contractor and oversee the construction of the project. The 40-acre project is located on<!--more--> 100 acres of farm and forest land about 60 miles southwest of Augusta, Ga.<\/p>\n<p>The project has a 25-year power purchase agreement with Cobb Electric Membership Corp., one of the largest electric cooperatives in Georgia, serving roughly 200,000 customers.<\/p>\n<hr \/>\n<p>As of July 2013, construction is well underway, and the photo below shows some initial solar panels that have been installed.<\/p>\n<\/blockquote>\n<p>\nDominion currently summarizes its<br \/>\n<a href=\"https:\/\/www.dom.com\/about\/stations\/renewable\/solar\/index.jsp\"><br \/>\nSolar Projects<\/a>:<\/p>\n<blockquote><p>\n<a href=\"https:\/\/www.dom.com\/about\/stations\/renewable\/solar\/indianapolis-solar-power-projects.jsp\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;width:345px\" src=\"https:\/\/www.dom.com\/about\/stations\/renewable\/solar\/images\/indy-solar-map.gif\"><\/a><\/p>\n<p>We recently announced the addition of Dominion&#8217;s first major generation-scale <a href=\"https:\/\/www.dom.com\/about\/stations\/renewable\/solar\/azalea-solar-power-facility.jsp\">solar project in Georgia<\/a>, a 7.7 megawatt facility capable of powering more than 1,900 homes. We since have acquired <a href=\"https:\/\/www.dom.com\/about\/stations\/renewable\/solar\/indianapolis-solar-power-projects.jsp\">three solar-power development projects<\/a> near Indianapolis, Ind., known as Indy Solar I, Indy Solar II and Indy Solar III. The projects will generate a peak combined output of 28.6 megawatts of electricity.<\/p>\n<\/blockquote>\n<p>\nThat&#8217;s an interesting start.<br \/>\nBut Dominion is still naming solar installations with small numbers,<br \/>\nlike nuclear reactors.<br \/>\nWhen electric utilities get on with installing so much rooftop solar<br \/>\nthey have to use large numbers and they stop bothering to make<br \/>\npress releases for each one, we&#8217;ll know they&#8217;re serious.<br \/>\nYou know, like<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2012\/04\/austin-energy-changed-from-anti-solar-to-pro-solar-in-one-year.html\"><br \/>\nAustin Energy already started back in 2003<\/a>.<\/p>\n<blockquote>\n<p>The addition of these facilities is consistent with our philosophy to balance our <a href=\"https:\/\/www.dom.com\/about\/stations\/index.jsp\">generation portfolio<\/a> with of all types of fuel sources: nuclear, clean coal, biomass, natural gas, hydro-power, wind and solar.<\/p>\n<\/blockquote>\n<p>\nAnd there&#8217;s more.<br \/>\nYesterday Power Engineering reported<br \/>\n<a href=\"http:\/\/www.power-eng.com\/articles\/2013\/10\/dominion-acquires-solar-project-in-north-central-connecticut.html\"><br \/>\nDominion acquires solar project in north-central Connecticut<\/a>,<\/p>\n<blockquote><p>\n<a href=\"http:\/\/www.power-eng.com\/articles\/2013\/10\/dominion-acquires-solar-project-in-north-central-connecticut.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;width:300px\" src=\"http:\/\/www.power-eng.com\/content\/pe\/en\/articles\/2013\/10\/dominion-acquires-solar-project-in-north-central-connecticut\/_jcr_content\/leftcolumn\/article\/headerimage.img.jpg\/1382472135511.jpg\"><\/a><\/p>\n<p>Dominion (NYSE: <a adhocenable=\"false\"\nhref=\"http:\/\/www.power-eng.com\/index\/power-generation-company-news\/dominion.html\"\ntarget=\"_blank\">D<\/a>) has acquired a solar project<br \/>\nin Somers, Ct., capable of producing approximately<br \/>\n5 megawatts (AC) of electricity, from <a adhocenable=\"false\"\nhref=\"http:\/\/www.power-eng.com\/articles\/2013\/05\/solar-pv-completed-and-sending-power-to-the-grid.html\"\ntarget=\"_blank\">Kyocera<\/a> (NYSE: KYO) in a deal that closed Tuesday<br \/>\nfor an undisclosed sum.<\/p>\n<p>Kyocera and CleanPath, a San Francisco-based clean-energy company,<br \/>\nhad jointly developed the Somers project, which is expected to begin<br \/>\ncommercial operation within the 4th quarter of 2013.<\/p>\n<p>The Somers Solar Center will use Kyocera Solar Inc.&#8217;s,<br \/>\nphotovoltaic technology to produce enough electricity to supply<br \/>\nnearly 1,400 homes. The electricity will go to <a adhocenable=\"false\"\nhref=\"http:\/\/www.power-eng.com\/articles\/2013\/06\/pge-tops-list-of-leading-utilities-for-renewable-energy.html\"\ntarget=\"_blank\">Connecticut Light &amp; Power Co.<\/a> under a 20-year<br \/>\npurchased-power agreement.<\/p>\n<p>Somers Solar Center is located on 90 leased acres in north-central<br \/>\nConnecticut, roughly 4 miles south of the Massachusetts state<br \/>\nline. Prime Solutions Inc., a Connecticut-based company, is the<br \/>\ncenter&#8217;s engineering and construction contractor. The project provided<br \/>\nabout 80 jobs during the peak of construction, most of which came from<br \/>\nlocally-owned companies. Once in operation, the center will be serviced<br \/>\nby a contractor.<\/p>\n<\/blockquote>\n<p>\nSo 7.7 + 28.6 + 5 is 41.3 megawatts of solar power Dominion<br \/>\nhas bought this year.<br \/>\nAll of which is expected to be online this year.<br \/>\nHm, solar seems to get installed a lot quicker than nuclear&#8230;.<\/p>\n<p>\n -jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Virginia electric utility bought a solar project near Georgia Power&#8217;s nuclear plant Vogtle, and has been busily buying up four more, in Indiana and Connecticut. The Georgia electric customer is recent coal-to-solar convert Cobb EMC, not Georgia Power. This is the same Dominion Power that got Virginia to legalize its &#8220;standby charge&#8221; of a [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1127,14,18,104,23,24],"tags":[7123,8818,749,8704,8701,8708,7124,8702,12,7,8737,8713,8714,7125,6],"class_list":["post-6274","post","type-post","status-publish","format-standard","hentry","category-cobb-emc","category-economy","category-georgia-power","category-nuclear","category-renewable-energy","category-solar","tag-azalea-solar","tag-cobb-emc","tag-dominion-power","tag-economy","tag-georgia","tag-georgia-power","tag-indy-solar","tag-lake","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-nuclear","tag-renewable-energy","tag-solar","tag-somers-solar-center","tag-valdosta"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/6274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=6274"}],"version-history":[{"count":5,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/6274\/revisions"}],"predecessor-version":[{"id":6279,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/6274\/revisions\/6279"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=6274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=6274"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=6274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}