{"id":4918,"date":"2013-07-28T12:33:20","date_gmt":"2013-07-28T16:33:20","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=4918"},"modified":"2013-07-28T12:39:44","modified_gmt":"2013-07-28T16:39:44","slug":"local-hospital-opens-1950s-style-diesel-power-plant","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2013\/07\/local-hospital-opens-1950s-style-diesel-power-plant.html","title":{"rendered":"Local hospital opens 1950s-style diesel power plant"},"content":{"rendered":"<p>\r\nAnd still not a single solar panel at South Georgia Medical Center.\r\nYes, I know that won&#8217;t work for emergency power during the night,\r\nbut it would do fine for peak load during the afternoon.\r\nPlus, did anybody see a request for bids for that new power plant?\r\n<p>\r\n<a href=\"https:\/\/maps.google.com\/maps?q=South+Georgia+Medical+Center,+North+Patterson+Street,+Valdosta,+GA&#038;hl=en&#038;ll=30.862562,-83.288835&#038;spn=0.004909,0.006652&#038;sll=37.0625,-95.677068&#038;sspn=37.052328,54.492188&#038;oq=south+georgia+medical+center&#038;t=h&#038;hq=South+Georgia+Medical+Center,+North+Patterson+Street,+Valdosta,+GA&#038;z=17&#038;layer=c&#038;cbll=30.862562,-83.288835&#038;panoid=k1wb0KXknnZukxPLoO5LPA&#038;cbp=12,241.74,,3,0\"\r\ntitle=\"Valdosta Electric always parked across the street from SGMC; google streetview\">\r\n<img decoding=\"async\" style=\"float:right;border:none;\" src=\"http:\/\/farm8.staticflickr.com\/7302\/9386318314_f9576ba977_n.jpg\" alt=\"Valdosta Electric always parked across the street from SGMC; google streetview\"><\/a>\r\nEames Yates posted SGMC PR for WCTV Friday 19 July 2013 verbatim including\r\nthe title, plus a smoking smokestack image,\r\n<a href=\"http:\/\/www.wctv.tv\/news\/georgianews\/headlines\/State-Of-The-Art-Power-Plant-Opens-At-SGMC-216183031.html\">\r\nState-Of-The-Art Power Plant Opens At SGMC<\/a>, while\r\nWALB posted a slightly shortened version,\r\n<a href=\"http:\/\/lowndescounty.walb.com\/news\/news\/84013-s-ga-medical-boasts-brand-new-power-plant\">\r\nS. GA Medical boasts brand new power plant<\/a>.\r\nHere&#8217;s the <a href=\"http:\/\/www.sgmc.org.beta2.inpowercms.com\/Articles\/state-of-the-art_power_plant_opens_at_sgmc.aspx\">SGMC PR<\/a>;\r\nI&#8217;ve added a few links:<!--more-->\r\n<blockquote>\r\n<p>\r\n<a title=\"Randy Sauls, CEO, SGMC\" href=\"https:\/\/www.sgmc.org\/Articles\/sauls_named_sgmc_ceo.aspx\">\r\n<img decoding=\"async\" alt=\"Randy Sauls, CEO, SGMC\" style=\"float:right;border:none;width:160px\" src=\"https:\/\/www.sgmc.org\/Uploads\/Images\/News\/Sauls1-mid.jpg\"><\/a>\r\nSouth Georgia Medical Center&#8217;s Engineering Department hosted an open\r\nhouse for the hospital&#8217;s new $10 million emergency power plant on\r\nJuly  16. During the opening ceremonies,\r\n<a href=\"https:\/\/www.sgmc.org\/Articles\/sauls_named_sgmc_ceo.aspx\">\r\nSGMC CEO Randy Sauls<\/a>\r\nrecognized  guests and gave a special thanks to the construction\r\nteams for  confronting the challenges and bringing the project to\r\nfruition. Mr.  Sauls also commended Valdosta Electric and the SGMC\r\nEngineering  Department for the 12 minutes of downtime in 530 hours\r\nof cutover time.  Cutover activity involved moving the backup power\r\nsupply from the  original power plant over to the new one.\r\n<\/p>\r\n<p>\r\n<a title=\"Trav Paulk of Valdosta Electric\" href=\"http:\/\/valdostadailytimes.com\/local\/x1669710220\/Giving-Back-Boys-and-Girls-Club-honors-volunteers\">\r\n<img decoding=\"async\" alt=\"Trav Paulk of Valdosta Electric\" style=\"float:right;border:none;\" src=\"http:\/\/d6673sr63mbv7.cloudfront.net\/archive\/x1456442678\/g0a0000000000000000df0760e4525cd1ee2f9b24e9ec058f8374c414de.jpg\"><\/a>\r\n<a href=\"http:\/\/valdostadailytimes.com\/local\/x1669710220\/Giving-Back-Boys-and-Girls-Club-honors-volunteers\">\r\nTrav Paulk with Valdosta Electric<\/a> thanked the\r\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/01\/hospital-authority-meets-wednesday-vlcha-2013-01-16.html\">\r\nHospital Authority of Valdosta &#038; Lowndes County, Georgia<\/a>\r\nfor\r\n<a href=\"https:\/\/maps.google.com\/maps?q=South+Georgia+Medical+Center,+North+Patterson+Street,+Valdosta,+GA&#038;hl=en&#038;ll=30.862562,-83.288835&#038;spn=0.004909,0.006652&#038;sll=37.0625,-95.677068&#038;sspn=37.052328,54.492188&#038;oq=south+georgia+medical+center&#038;t=h&#038;hq=South+Georgia+Medical+Center,+North+Patterson+Street,+Valdosta,+GA&#038;z=17&#038;layer=c&#038;cbll=30.862562,-83.288835&#038;panoid=k1wb0KXknnZukxPLoO5LPA&#038;cbp=12,241.74,,3,0\">\r\nusing Valdosta Electric<\/a> and a\r\nhost of other local contractors to complete this big task. Paulk \r\nreminded everyone of the almost daily rainfall that was experienced \r\nlast winter and spring and how his crews would spend the morning \r\npumping water out of the construction site only to have it refilled\r\nby  the afternoon rains. By looking at the beautiful building and \r\nlandscaped surroundings today, you would never know those problems \r\nexisted.\r\n<\/p>\r\n<p>\r\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2013\/01\/hospital-authority-meets-wednesday-vlcha-2013-01-16.html\">\r\n<img decoding=\"async\" style=\"float:right;border:none;\" src=\"http:\/\/www.sgmc.org\/images\/logo.jpg\"><\/a>\r\nThe power plant was designed and built to provide emergency power\r\nfor the SGMC Main Campus including the new Dasher Memorial Heart\r\nCenter and  Patient Tower. The power plant houses 42 miles of cables\r\nand conduit.  When the big diesel generators are fired up the system\r\nuses 180 gallons  of diesel fuel per hour to operate key systems\r\nwithin the hospital.\r\n<\/p>\r\n<p>\r\n<a href=\"http:\/\/www.wctv.tv\/news\/georgianews\/headlines\/State-Of-The-Art-Power-Plant-Opens-At-SGMC-216183031.html\">\r\n<img decoding=\"async\" style=\"float:right;border:none;width:250px\" src=\"http:\/\/media.graytvinc.com\/images\/PowerPlant5.jpg\"><\/a>\r\nThe original power plant was opened in the 1950s with upgrades to \r\nequipment in the 1980s. The new power plant is one of the most \r\nsophisticated of its kind.\r\n<\/p>\r\n<p>\r\nFor more information, contact Community Relations at 229-259-4421.\r\n<\/p>\r\n<\/blockquote>\r\n<p>\r\n -jsq\r\n<\/p>","protected":false},"excerpt":{"rendered":"And still not a single solar panel at South Georgia Medical Center. Yes, I know that won&#8217;t work for emergency power during the night, but it would do fine for peak load during the afternoon. Plus, did anybody see a request for bids for that new power plant? Eames Yates posted SGMC PR for WCTV [&hellip;]","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_links_to":"","_links_to_target":""},"categories":[41,559,24,914,204,177],"tags":[2311,8701,8718,8702,12,7,8782,2539,139,8714,138,6729,6,6728,2487,8809,8752,8748],"class_list":["post-4918","post","type-post","status-publish","format-standard","hentry","category-health-care","category-oil","category-solar","category-vlcha","category-walb","category-wctv","tag-diesel","tag-georgia","tag-health-care","tag-lake","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-oil","tag-randy-sauls","tag-sgmc","tag-solar","tag-south-georgia-medical-center","tag-trav-paulk","tag-valdosta","tag-valdosta-electric","tag-valdosta-lowndes-county-hospital-authority","tag-vlcha","tag-walb","tag-wctv"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p585fK-1hk","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/4918","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=4918"}],"version-history":[{"count":4,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/4918\/revisions"}],"predecessor-version":[{"id":4922,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/4918\/revisions\/4922"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=4918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=4918"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=4918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}