{"id":452,"date":"2012-10-02T10:43:54","date_gmt":"2012-10-02T14:43:54","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/2012\/10\/southern-companys-three-legged-nuclear-regulatory-capture-stool.html"},"modified":"2012-10-02T10:43:54","modified_gmt":"2012-10-02T14:43:54","slug":"southern-companys-three-legged-nuclear-regulatory-capture-stool","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2012\/10\/southern-companys-three-legged-nuclear-regulatory-capture-stool.html","title":{"rendered":"Southern Company&#8217;s three-legged nuclear regulatory-capture stool"},"content":{"rendered":"<p><img decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b017c3246a2af970b\" src=\"\/blog\/images\/6a0120a58214e4970b017c3246a2af970b-pi.gif\"    \/><br \/>\nThe<br \/>\n<a href=\"\/blog\/2012\/09\/nrc-rejects-nuke-permit-for-edf-in-maryland.html\"><br \/>\nfailed EDF nuke project at Calvert Cliffs in Maryland<\/a><br \/>\nmakes it clearer why Southern Company (SO) was the first company<br \/>\nto get a nuclear permit in 30 years:<br \/>\nit was the only one big enough and monopolistic enough to pull it off.<br \/>\nEven then it&#8217;s such a<br \/>\n<a href=\"\/blog\/2012\/05\/exit-strategy-for-when-this-big-nuclear-bet-goes-bad-john-s-quarterman-so-2012-05-23.html\"><br \/>\nbet-the-farm risk<\/a><br \/>\nthat even<br \/>\n<a href=\"\/blog\/2012\/05\/big-bet-on-solar-power-sam-booher-shale-and-australia-so-ceo-thomas-a-fanning-so-2012-05-23.html\"><br \/>\n&#8220;great, big company&#8221;<\/a><br \/>\nSO only dared<br \/>\nto deploy its<br \/>\n<a href=\"\/blog\/2012\/05\/supplier-diversity-outreach-david-so-2012-05-23.html\"><br \/>\n&#8220;<em>great big huge scale<\/em>&#8220;<\/a> equipment<br \/>\nwith the regulatory capture triple-whammy<br \/>\nof<br \/>\n<a href=\"#CWIP\">a stealth tax<\/a> on Georgia Power bills,<br \/>\n<a href=\"#overruns\">PSC approval of cost overruns<\/a>,<br \/>\nand<br \/>\n<a href=\"#guarantee\">an $8.33 billion federal loan guarantee:<\/a>\n<\/p>\n<ol>\n<li>\n<a name=\"CWIP\"><\/a><br \/>\n<a href=\"\/blog\/2011\/10\/calculate-how-much-vogtle-is-costing-you-mandy-hancock.html\"><br \/>\n<img loading=\"lazy\" decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b017c3246a2b5970b\" src=\"\/blog\/images\/6a0120a58214e4970b017c3246a2b5970b-pi.png\"   width=\"202\" height=\"80\"  \/><\/a><br \/>\n<a href=\"\/blog\/2012\/05\/who-voted-for-georgia-powers-nuke-rate-hike-cwip.html\"><br \/>\na legislated<\/a><br \/>\nstealth tax in the form of<br \/>\n<a href=\"\/blog\/2011\/10\/calculate-how-much-vogtle-is-costing-you-mandy-hancock.html\"><br \/>\na rate hike on Georgia Power customers<\/a> for<br \/>\npower they won&#8217;t get for years if ever.<br \/>\nIf you&#8217;re a Georgia Power customer,<br \/>\nlook on your bill for Nuclear Construct Cost Recovery Rider.<br \/>\nYou&#8217;ll find it adds about 5% on top of your Current Service Subtotal.<br \/>\nGeorgia is one of only a handful of states where such a<br \/>\nConstruction Work in Progress (CWIP) charge is legal<br \/>\n<a href=\"\/blog\/2012\/05\/who-voted-for-georgia-powers-nuke-rate-hike-cwip.html\"><br \/>\nthanks to our regulatory-captured legislature.<\/a><br \/>\nDoubling down on bad energy bets,<br \/>\nSouthern Company is also<br \/>\n<a href=\"\/blog\/2012\/08\/cwip-for-sos-kemper-coal-plant-in-mississippi.html\"><br \/>\ntrying to use CWIP to build a coal plant in Mississippi.<\/a>\n<\/li>\n<li>\n<a name=\"overruns\"><\/a><br \/>\n<a href=\"\/blog\/2012\/08\/psc-rubberstamps-vogtle-cost-overruns-next-day-fitch-affirms-southern-company-ratings.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b017c3246a2ba970b\" src=\"\/blog\/images\/6a0120a58214e4970b017c3246a2ba970b-pi.jpg\"    \/><\/a><br \/>\nA captive Public Service Commission that<br \/>\n<a href=\"\/blog\/2012\/08\/psc-rubberstamps-vogtle-cost-overruns-next-day-fitch-affirms-southern-company-ratings.html\"><br \/>\nrubber-stamps costs<\/a> for Plant Vogtle.<br \/>\nIn case there was any doubt as to the PSC&#8217;s role in legitimizing those new nukes,<br \/>\nthe very next day Fitch reaffirmed Southern Company&#8217;s bond ratings.<\/p>\n<blockquote>\n<p>\nSouthern Company&#8217;s regulated utility subsidiaries derive predictable<br \/>\ncash flows from low-risk utility businesses, enjoy relatively<br \/>\nfavorable regulatory framework in their service territories, and<br \/>\nexhibit limited commodity price risks due to the ability to recover<br \/>\nfuel and purchased power through separate cost trackers.\n<\/p>\n<\/blockquote>\n<p>Translation: Georgia Power customers subsidize SO&#8217;s bonds<br \/>\nand SO shareholders&#8217; stock dividends.<br \/>\nThe PSC also approved<br \/>\n<a href=\"\/blog\/2011\/07\/georgia-power-wants-taxpayers-to-take-profit-risk-for-new-nukes.html\">cost overruns<\/a> being<br \/>\npassed on to Georgia Power customers,<br \/>\nand those nukes are already over<br \/>\n<a href=\"\/blog\/2012\/07\/dear-southern-company-green-energy-now-protesters.html\"><br \/>\n$400 or $900 million<\/a>, depending on who you ask.<br \/>\nWhat do you expect when<br \/>\n<a href=\"\/blog\/2012\/07\/4-of-5-incumbent-ga-psc-commissioners-accept-massive-utility-campaign-contributions.html\"><br \/>\n4 out of 5 Public Service Commissioners<br \/>\napparently took 70% of their campaign contributions from utilities<br \/>\nthey regulate or their employees or their law firms,<\/a><br \/>\nand the fifth commissioner took about 20% from such sources?<br \/>\nHm, there&#8217;s an election going on right now!\n<\/li>\n<li>\n<a name=\"guarantee\"><\/a><br \/>\n<a href=\"\/blog\/2012\/04\/southern-company-wants-even-more-special-nuke-loan-terms.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b017c3246a2bc970b\" src=\"\/blog\/images\/6a0120a58214e4970b017c3246a2bc970b-pi.jpg\"    \/><\/a><br \/>\nAn<br \/>\n<a href=\"\/blog\/2012\/04\/southern-company-wants-even-more-special-nuke-loan-terms.html\"><br \/>\n$8.33 billion federal loan guarantee.<\/a><br \/>\nEven that&#8217;s not good enough for SO and Georgia Power: SO is<br \/>\nasking for less down payment.\n<\/li>\n<\/ol>\n<p>\nAnd what if even one of that three-legged regulatory capture stool&#8217;s legs<br \/>\nwent away?<\/p>\n<p><!--more--><br \/>\nIf we elect new Public Service Commissioners and legislators this year,<br \/>\none or both of the Georgia legs could get revoked.<br \/>\n<a href=\"\/blog\/2012\/08\/vogtle-circular-firing-squad-delaying-opening.html\"><br \/>\n<img loading=\"lazy\" decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b017d3bde08fd970c at-xid-6a0120a58214e4970b017c3246a2be970b\" src=\"\/blog\/images\/6a0120a58214e4970b017c3246a2be970b-pi.jpg\"   width=\"125\" height=\"82\"  \/><\/a><br \/>\nAnd if we lobby Congress and the federal government, maybe that<br \/>\nfederal loan guarantee, which apparently has never been finalized,<br \/>\nmight never get finalized.<br \/>\nThen we could stop<br \/>\n<a href=\"\/blog\/2012\/08\/vogtle-circular-firing-squad-delaying-opening.html\"><br \/>\npouring money down that rathole on the Savannah River<\/a><br \/>\nand get on with<br \/>\n<a href=\"\/blog\/2012\/07\/will-electricity-demand-increase.html\">efficiency<\/a>,<br \/>\n<a href=\"\/blog\/2012\/09\/pass-the-production-tax-credit-for-georgia-jobs.html\">wind<\/a> power,<br \/>\nand<br \/>\nsolar power,<br \/>\nboth<br \/>\n<a href=\"\/blog\/2012\/02\/private-investment-in-utility-scale-solar-plants-1.html\"><br \/>\nutility scale<\/a>,<br \/>\nsuch as<br \/>\n<a href=\"\/blog\/2012\/09\/where-would-georgia-solar-utilities-inc-get-enough-land-for-80-mw-solar-generation.html\"><br \/>\nGaSU&#8217;s 90MW proposal,<\/a><br \/>\nand<br \/>\n<a href=\"\/blog\/2012\/02\/enabling-a-commodity-market-in-solar-power-dr-smiths-electric-meters.html\"><br \/>\ndistributed rooftop,<\/a><br \/>\nsuch as<br \/>\n<a href=\"\/blog\/2012\/04\/austin-energy-changed-from-anti-solar-to-pro-solar-in-one-year.html\"><br \/>\nAustin Energy pioneered way back in 2003.<\/a><\/p>\n<p>\n<a href=\"\/blog\/2012\/09\/georgia-power-inches-towards-more-solar.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b017c3246a2c0970b\" src=\"http:\/\/farm9.staticflickr.com\/8319\/8028146157_a5b1b0c07d_m.jpg\"\n\/><\/a><br \/>\nIf<br \/>\n<a href=\"\/blog\/2012\/04\/were-just-ripe-for-solar-power-cobb-emc.html\"><br \/>\nCobb EMC can switch from coal to solar<\/a>,<br \/>\nGeorgia Power and Southern Company can switch from nuclear to<br \/>\nefficiency, wind, and solar.<br \/>\nGeorgia Power&#8217;s<br \/>\n<a href=\"\/blog\/2012\/09\/georgia-power-inches-towards-more-solar.html\"><br \/>\nadditional 210 MW solar<\/a><br \/>\nis a move in the right direction, but still a baby step.\n<\/p>\n<p>\nWe&#8217;ll know SO and Georgia Power are serious about<br \/>\nwhen they stop<br \/>\n<a href=\"\/blog\/2012\/05\/in-georgia-competitive-is-not-for-you.html\"><br \/>\ngetting in the way of changing the 1973 Georgia Territorial Electric Service Act<\/a><br \/>\n<a href=\"\/blog\/2012\/06\/the-solar-train-is-leaving-the-station-but-the-nuclear-buggywhip-is-in-the-way.html\"><br \/>\ncatching up with the rest of country and the world<\/a><br \/>\nthat currently only permits you to sell power you generate to your<br \/>\none and only<br \/>\n<a href=\"http:\/\/www.flickr.com\/photos\/98706376@N00\/5632134880\/\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b01676575c0bc970b\" src=\"\/blog\/images\/6a0120a58214e4970b01676575c0bc970b-pi.jpg\"    \/><\/a><br \/>\nelectric utility at whatever rate that utility has set.<br \/>\nWe need to change that law so in Georgia like in most states we can<br \/>\nhave a real energy market.<br \/>\nKick one of the legs out from under that three-legged<br \/>\nregulatory capture stool and the nuke boondoggle will collapse,<br \/>\nleaving SO and Georgia Power no excuse.<br \/>\nThen the clean energy sun can rise on Georgia.\n<\/p>\n<p>\nVote.\n<\/p>\n<p>\n-jsq\n<\/p>\n<p><P><\/p>\n<p>\nPS 2012-10-02 10PM: Here&#8217;s<br \/>\n<a href=\"\/blog\/2012\/05\/who-voted-for-georgia-powers-nuke-rate-hike-cwip.html\"><br \/>\na list of the legislators who voted for CWIP.<\/a><br \/>\nConsider voting for their opponents.\n<\/p>\n<p>\nThe two Public Service Commission candidates challenging the incumbents are:<\/p>\n<ul>\n<li>\n<a href=\"\/blog\/2012\/10\/streetlights-and-georgia-power-hahira-2012-10-01.html\"><br \/>\nSteve Oppenheimer<\/a>, who visited Lowndes County yesterday,<\/p>\n<li>\nand<br \/>\n<a href=\"http:\/\/votestaples.com\/\"><br \/>\nDavid Staples.<\/a>\n<\/ul>\n<p>\n<a href=\"\/blog\/2012\/03\/separate-cwip-payments-to-georgia-power-wace-call-for-action.html\"><br \/>\n<img style=\"float:right;border:none;\"   width=\"112\" height=\"112\"\nsrc=\"http:\/\/sphotos.xx.fbcdn.net\/hphotos-ash4\/s320x320\/430146_10100100207271083_46211743_39653390_1157224289_n.jpg\"><\/a><br \/>\nYou don&#8217;t even have to wait for November. If you&#8217;re a Georgia Power customer,<br \/>\nyou can<br \/>\n<a href=\"\/blog\/2012\/03\/separate-cwip-payments-to-georgia-power-wace-call-for-action.html\"><br \/>\npay your CWIP payment in a separate check<\/a>,<br \/>\nwith a comment saying you&#8217;d rather have renewable energy.<br \/>\nEven if you&#8217;re not, you can write to Georgia Power, or Southern Company,<br \/>\nor the GA PSC.<br \/>\nHere are<br \/>\n<a href=\"\/blog\/2012\/03\/separate-cwip-payments-to-georgia-power-wace-call-for-action.html\"><br \/>\nsome contacts.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The failed EDF nuke project at Calvert Cliffs in Maryland makes it clearer why Southern Company (SO) was the first company to get a nuclear permit in 30 years: it was the only one big enough and monopolistic enough to pull it off. Even then it&#8217;s such a bet-the-farm risk that even &#8220;great, big company&#8221; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[97,606,120,47,141,216,1127,142,14,49,264,265,16,70,17,8,18,2,20,312,104,21,22,32,23,24,3,36],"tags":[8736,8794,8738,8719,8745,8753,8818,1153,1606,8746,8704,8721,8754,8755,8706,8728,8707,102,8701,8708,101,8699,8702,8710,8760,12,7,8737,8711,8712,8715,8713,1605,8714,108,8700,6,8716],"class_list":["post-452","post","type-post","status-publish","format-standard","hentry","category-activism","category-austinenergy","category-biomass","category-climate-change","category-co2","category-coal","category-cobb-emc","category-cwip","category-economy","category-elections","category-energy-conservation","category-energy-efficiency","category-environment","category-ethics","category-ga-psc","category-georgia","category-georgia-power","category-government","category-law","category-lower-rates-for-customers-llc","category-nuclear","category-planning","category-politics","category-pollution","category-renewable-energy","category-solar","category-transparency","category-wind","tag-activism","tag-austinenergy","tag-biomass","tag-climate-change","tag-co2","tag-coal","tag-cobb-emc","tag-corruption","tag-cost-overruns","tag-cwip","tag-economy","tag-elections","tag-energy-conservation","tag-energy-efficiency","tag-environment","tag-ethics","tag-ga-psc","tag-gasu","tag-georgia","tag-georgia-power","tag-georgia-solar-utilities","tag-government","tag-lake","tag-law","tag-lower-rates-for-customers-llc","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-nuclear","tag-planning","tag-politics","tag-pollution","tag-renewable-energy","tag-rooftop-solar","tag-solar","tag-southern-company","tag-transparency","tag-valdosta","tag-wind"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=452"}],"version-history":[{"count":0,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/452\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=452"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}