{"id":26034,"date":"2026-08-26T20:32:03","date_gmt":"2026-08-27T00:32:03","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=26034"},"modified":"2026-08-26T20:32:03","modified_gmt":"2026-08-27T00:32:03","slug":"sabal-trail-pipeline-easement-with-lowndes-county-commission-2026-01-26-html","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2026\/08\/sabal-trail-pipeline-easement-with-lowndes-county-commission-2026-01-26-html.html","title":{"rendered":"Sabal Trail pipeline Easement with Lowndes County Commission 2026-01-26"},"content":{"rendered":"<p>\r\nThis is the easement for a 36-inch fracked methane pipeline that <a href=\"https:\/\/www.l-a-k-e.org\/blog\/2016\/01\/videos-sold-out-to-sabal-trail-lcc-2016-01-26.html\">\r\nthe Lowndes County Commission approved on January 26, 2016<\/a>,\r\nsaying it was a good business decision.\r\n<\/p><p>\r\nNevermind the letter that the Chairman sent to FERC on April 11, 2014,\r\n<a href=\"https:\/\/spectrabusters.org\/2014\/04\/12\/sabal-trail-will-be-expected-to-adhere-and-honor-all-lowndes-county-ordinances-bill-e-slaughter-jr-to-ferc\/\">\r\nSabal Trail will be expected to adhere and honor all Lowndes County Ordinances -Bill E Slaughter, JR to FERC<\/a>.\r\n<\/p><p>\r\nAnyway, this easement has a couple of interesting clauses.\r\n<\/p><p>\r\nOn page 2, &ldquo;4.a. Single Pipeline; Pipeline Depth. This Easement allows a single underground Pipeline with a maximum pipe outer diameter of thirty-six (36) inches, and with the\r\nmaximum allowable operating pressure&rdquo; of natural gas\r\ntransported within the pipeline as permitted by applicable law, rule\r\nor regulation.&rdquo;\r\n<\/p>\r\n<p>\r\nNow that <a href=\"https:\/\/wwals.net\/2026\/08\/14\/sabal-trail-wants-a-second-pipeline-and-bigger-compressor-stations-2026-08-03\/\">\r\nSabal Trail wants a second pipeline<\/a>,\r\nit will have to negotiate with landowners again, including the Lowndes County government.\r\nAnd it is already doing so; see a following post.\r\n<\/p><p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"Sabal Trail pipeline Easement with Lowndes County 2016-01-26, Between Railroad Ave. and Madison Highway\" name=\"MMM:Sabal-Trail-pipeline-Easement-with-Lowndes-County-20160126-Between-Railroad-Ave-and-Madison-Highway\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/igmany.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/igmany.jpg\"  alt=\"[Sabal Trail pipeline Easement with Lowndes County 2016-01-26, Between Railroad Ave. and Madison Highway]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/igmany.html\">Sabal Trail pipeline Easement with Lowndes County 2016-01-26, Between Railroad Ave. and Madison Highway<\/a>\r\n<\/p>\r\n<p>\r\nAnother interesting clause is on page 5, &ldquo;13. Taxes. Grantee shall assume and pay the amount of any taxes lawfully assessed and applicable to Grantee and due and owing on the Pipeline, Pipeline Facilities or Easement Area.&rdquo;\r\n<\/p><p>\r\nEvidently if you have enough leverage, you can get Sabal Trail to agree to things\r\nthey never would have offered.\r\n<\/p><p>\r\nThe property is between Railroad Avenue and Madison Highway, south of Clyattville.\r\nIt is near Clyatt Mill Creek, and uphill from the Withlacoochee River.\r\nIt has an old landfill on one of the parcels; thus the monitoring wells in the easement.\r\n<\/p><p>\r\nPDF of the easement, received in response to a LAKE open records request, is\r\n<a href=\"https:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\">\r\non the LAKE website<\/a>.\r\n<\/p><p>\r\nImages of each page are below.\r\n<\/p><p>\r\nBut first, here is a Sabal Trail alignment map that covers the subject property.\r\nFor such alignment maps for the entire pipeline in all three states, see\r\n<a href=\"https:\/\/www.l-a-k-e.org\/govt\/ferc\/2016-04-07--stt-supp\/\">\r\nLAKE: Sabal Trail Transmission alignment maps 2016-04-07<\/a>.<!--more-->\r\n\r\n\r\n<\/p><p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"1657-PL-DG-70197-246, STA. 12859+00 TO STA. 12912+00, MP 243.54, MP 244.55, 12868+90, 2016-03-14, CL CREEK, Railroad Ave., Clyatt Mill Creek, KINDER MORGAN PIPELINE, LOWNDES COUNTY, GEORGIA,\" name=\"AS:X1657PLDG70197246-STA-1285900-TO-STA-1291200-MP-24354-MP-24455-1286890-20160314-CL-CREEK-Railroad-Ave-Clyatt-Mill-Creek-KINDER-MORGAN-PIPELINE-LOWNDES-COUNTY-GEORGIA\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/20160407-5081-31369076-0001.html\">\r\n<img decoding=\"async\" border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/20160407-5081-31369076-0001.jpg\"  alt=\"[1657-PL-DG-70197-246, STA. 12859+00 TO STA. 12912+00, MP 243.54, MP 244.55, 12868+90, 2016-03-14, CL CREEK, Railroad Ave., Clyatt Mill Creek, KINDER MORGAN PIPELINE, LOWNDES COUNTY, GEORGIA, 30.6805050, -83.3264430]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/20160407-5081-31369076-0001.html\">1657-PL-DG-70197-246, STA. 12859+00 TO STA. 12912+00, MP 243.54, MP 244.55, 12868+90, 2016-03-14, CL CREEK, Railroad Ave., Clyatt Mill Creek, KINDER MORGAN PIPELINE, LOWNDES COUNTY, GEORGIA,<\/a> <span style=\"font-size:80%\">https:\/\/www.google.com\/maps\/@30.6805050,-83.3264430,17z\/data=!3m1!4b1!4m2!3m1!1s0x0:0x0<\/span>\r\n<\/p>\r\n<h4><a name=\"STT\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/#STT\">STT<\/a><\/h4>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"NATURAL GAS UNDERGROUND PIPELINE EASEMENT AND AGREEMENT\" name=\"STT:NATURAL-GAS-UNDERGROUND-PIPELINE-EASEMENT-AND-AGREEMENT\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0001.html\">\r\n<img decoding=\"async\" border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0001.jpg\"  alt=\"[NATURAL GAS UNDERGROUND PIPELINE EASEMENT AND AGREEMENT]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0001.html\">NATURAL GAS UNDERGROUND PIPELINE EASEMENT AND AGREEMENT<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0001.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"4.a. Single Pipeline; Pipeline Depth. This Easement allows a single underground Pipeline with a maximum pipe outer diameter of thirty-six (36) inches, and with the...\" name=\"STT:X4a-Single-Pipeline-Pipeline-Depth-This-Easement-allows-a-single-underground-Pipeline-with-a-maximum-pipe-outer-diameter-of-thirtysix-36-inches-and-with-the\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0002.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0002.jpg\"  alt=\"[4.a. Single Pipeline; Pipeline Depth. This Easement allows a single underground Pipeline with a maximum pipe outer diameter of thirty-six (36) inches, and with the...]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0002.html\">4.a. Single Pipeline; Pipeline Depth. This Easement allows a single underground Pipeline with a maximum pipe outer diameter of thirty-six (36) inches, and with the&#8230;<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0002.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"7. Pipeline Construction and Maintenance.\" name=\"STT:X7-Pipeline-Construction-and-Maintenance\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0003.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0003.jpg\"  alt=\"[7. Pipeline Construction and Maintenance.]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0003.html\">7. Pipeline Construction and Maintenance.<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0003.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"8. As-Built Survey. By May 1, 2018, Grantee shall provide Grantor with an as-built survey (2 mylar copies, 2 hardcopies, and 1 electronic copy), which accurately reflects the location of the Pipeline, including its depth and diameter, Pipeline Systems and the Easement Area, prepared by and stamped and signed by a registered surveyor.\" name=\"STT:X8-AsBuilt-Survey-By-May-1-2018-Grantee-shall-provide-Grantor-with-an-asbuilt-survey-2-mylar-copies-2-hardcopies-and-1-electronic-copy-which-accurately-reflects-the-location-of-the-Pipeline-including-its-depth-and-diameter-Pipeline-Systems-and-the-Easement-Area-prepared-by-and-stamped-and-signed-by-a-registered-surveyor\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0004.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0004.jpg\"  alt=\"[8. As-Built Survey. By May 1, 2018, Grantee shall provide Grantor with an as-built survey (2 mylar copies, 2 hardcopies, and 1 electronic copy), which accurately reflects the location of the Pipeline, including its depth and diameter, Pipeline Systems and the Easement Area, prepared by and stamped and signed by a registered surveyor.]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0004.html\">8. As-Built Survey. By May 1, 2018, Grantee shall provide Grantor with an as-built survey (2 mylar copies, 2 hardcopies, and 1 electronic copy), which accurately reflects the location of the Pipeline, including its depth and diameter, Pipeline Systems and the Easement Area, prepared by and stamped and signed by a registered surveyor.<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0004.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"13. Taxes. Grantee shall assume and pay the amount of any taxes lawfully assessed and applicable to Grantee and due and owing on the Pipeline, Pipeline Facilities or Easement Area.\" name=\"STT:X13-Taxes-Grantee-shall-assume-and-pay-the-amount-of-any-taxes-lawfully-assessed-and-applicable-to-Grantee-and-due-and-owing-on-the-Pipeline-Pipeline-Facilities-or-Easement-Area\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0005.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0005.jpg\"  alt=\"[13. Taxes. Grantee shall assume and pay the amount of any taxes lawfully assessed and applicable to Grantee and due and owing on the Pipeline, Pipeline Facilities or Easement Area.]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0005.html\">13. Taxes. Grantee shall assume and pay the amount of any taxes lawfully assessed and applicable to Grantee and due and owing on the Pipeline, Pipeline Facilities or Easement Area.<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0005.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"15. Insurance. ... d. Environmental Liability; ($5,000,000.00 per occurrence minimum coverage; which Environmental Liability coverage amount may be a part of the General Liability coverage amount).\" name=\"STT:X15-Insurance-d-Environmental-Liability-500000000-per-occurrence-minimum-coverage-which-Environmental-Liability-coverage-amount-may-be-a-part-of-the-General-Liability-coverage-amount\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0006.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0006.jpg\"  alt=\"[15. Insurance. ... d. Environmental Liability; ($5,000,000.00 per occurrence minimum coverage; which Environmental Liability coverage amount may be a part of the General Liability coverage amount).]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0006.html\">15. Insurance. &#8230; d. Environmental Liability; ($5,000,000.00 per occurrence minimum coverage; which Environmental Liability coverage amount may be a part of the General Liability coverage amount).<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0006.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"17.a. Monitoring Wells; Landfill Monument. Grantee acknowledges and agrees that there are\" name=\"STT:X17a-Monitoring-Wells-Landfill-Monument-Grantee-acknowledges-and-agrees-that-there-are\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0007.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0007.jpg\"  alt=\"[17.a. Monitoring Wells; Landfill Monument. Grantee acknowledges and agrees that there are, in each case as shown on the Surveys, presently located within or near the Easement Area:...]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0007.html\">17.a. Monitoring Wells; Landfill Monument. Grantee acknowledges and agrees that there are<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0007.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"17.e. Environmental Matters. Grantee shall be responsible for and shall comply with all applicable laws, rules and regulations, including any required authorizations, approvals, permits, licenses, or fees relating thereto or arising from Grantee\u2019s use of the lands described....\" name=\"STT:X17e-Environmental-Matters-Grantee-shall-be-responsible-for-and-shall-comply-with-all-applicable-laws-rules-and-regulations-including-any-required-authorizations-approvals-permits-licenses-or-fees-relating-thereto-or-arising-from-Grantees-use-of-the-lands-described\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0008.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0008.jpg\"  alt=\"[17.e. Environmental Matters. Grantee shall be responsible for and shall comply with all applicable laws, rules and regulations, including any required authorizations, approvals, permits, licenses, or fees relating thereto or arising from Grantee\u2019s use of the lands described....]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0008.html\">17.e. Environmental Matters. Grantee shall be responsible for and shall comply with all applicable laws, rules and regulations, including any required authorizations, approvals, permits, licenses, or fees relating thereto or arising from Grantee\u2019s use of the lands described&#8230;.<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0008.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"17.g. Governing Law. This Grant of Easement and Agreement shall be construed, enforced and interpreted in accordance with the laws of the State of Georgia without regard to its conflicts of laws provisions.\" name=\"STT:X17g-Governing-Law-This-Grant-of-Easement-and-Agreement-shall-be-construed-enforced-and-interpreted-in-accordance-with-the-laws-of-the-State-of-Georgia-without-regard-to-its-conflicts-of-laws-provisions\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0009.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0009.jpg\"  alt=\"[17.g. Governing Law. This Grant of Easement and Agreement shall be construed, enforced and interpreted in accordance with the laws of the State of Georgia without regard to its conflicts of laws provisions.]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0009.html\">17.g. Governing Law. This Grant of Easement and Agreement shall be construed, enforced and interpreted in accordance with the laws of the State of Georgia without regard to its conflicts of laws provisions.<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0009.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"Page 10\" name=\"STT:Page-10\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0010.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0010.jpg\"  alt=\"[Page 10]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0010.html\">Page 10<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0010.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"IN WITNESS WHEREOF, this instrument is executed under seal as of the date first above written. GRANTOR:\" name=\"STT:IN-WITNESS-WHEREOF-this-instrument-is-executed-under-seal-as-of-the-date-first-above-written-GRANTOR\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0011.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0011.jpg\"  alt=\"[IN WITNESS WHEREOF, this instrument is executed under seal as of the date first above written. GRANTOR:]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0011.html\">IN WITNESS WHEREOF, this instrument is executed under seal as of the date first above written. GRANTOR:<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0011.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"GRANTEE: [SEAL] SABAL TRAIL TRANSMISSION, LLC By: Sabal Trail Management, LLC, its Operator\" name=\"STT:GRANTEE-SEAL-SABAL-TRAIL-TRANSMISSION-LLC-By-Sabal-Trail-Management-LLC-its-Operator\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0012.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0012.jpg\"  alt=\"[GRANTEE: [SEAL] SABAL TRAIL TRANSMISSION, LLC By: Sabal Trail Management, LLC, its Operator]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0012.html\">GRANTEE: [SEAL] SABAL TRAIL TRANSMISSION, LLC By: Sabal Trail Management, LLC, its Operator<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0012.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<h4><a name=\"ExhibitA\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/#ExhibitA\">ExhibitA<\/a><\/h4>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT &#038; TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 003\" name=\"ExhibitA:PLAT-OF-SURVEY-OF-PERMANENT-PIPELINE-EASEMENT-TEMPORARY-WORKSPACE-AREAS-20140827-Parcel-0098-003\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0013.html\">\r\n<img decoding=\"async\" border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0013.jpg\"  alt=\"[PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT &#038; TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 003]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0013.html\">PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT &#038; TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 003<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0013.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"AREA OF PERMANENT EASEMENT FOR SABAL TRAIL TRANSMISSION 0098 003\" name=\"ExhibitA:AREA-OF-PERMANENT-EASEMENT-FOR-SABAL-TRAIL-TRANSMISSION-0098-003\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0014.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0014.jpg\"  alt=\"[AREA OF PERMANENT EASEMENT FOR SABAL TRAIL TRANSMISSION 0098 003]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0014.html\">AREA OF PERMANENT EASEMENT FOR SABAL TRAIL TRANSMISSION 0098 003<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0014.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT &#038; TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 004\" name=\"ExhibitA:PLAT-OF-SURVEY-OF-PERMANENT-PIPELINE-EASEMENT-TEMPORARY-WORKSPACE-AREAS-20140827-Parcel-0098-004\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0015.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0015.jpg\"  alt=\"[PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT &#038; TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 004]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0015.html\">PLAT OF SURVEY OF PERMANENT PIPELINE EASEMENT &#038; TEMPORARY WORKSPACE AREAS 2014-08-27 Parcel 0098 004<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0015.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<h4><a name=\"ExhbitB\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/#ExhbitB\">ExhbitB<\/a><\/h4>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"Detail maps with monitor wells and SONAT pipeline, 2014-08-27\" name=\"ExhbitB:Detail-maps-with-monitor-wells-and-SONAT-pipeline-20140827\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0016.html\">\r\n<img decoding=\"async\" border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0016.jpg\"  alt=\"[Detail maps with monitor wells and SONAT pipeline, 2014-08-27]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0016.html\">Detail maps with monitor wells and SONAT pipeline, 2014-08-27<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0016.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p style=\"text-align:center;font-size:80%;font-style:italic\">\r\n<a title=\"AREA OF PERMANENT EASEMENT FOR SABAL TRAIL TRANSMISSION PARCEL NO. 0098 004\" name=\"ExhbitB:AREA-OF-PERMANENT-EASEMENT-FOR-SABAL-TRAIL-TRANSMISSION-PARCEL-NO-0098-004\" href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0017.html\">\r\n<img decoding=\"async\"  width=\"600\"  border=\"0\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0017.jpg\"  alt=\"[AREA OF PERMANENT EASEMENT FOR SABAL TRAIL TRANSMISSION PARCEL NO. 0098 004]\"\/><\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0017.html\">AREA OF PERMANENT EASEMENT FOR SABAL TRAIL TRANSMISSION PARCEL NO. 0098 004<\/a>\r\n<br \/><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2026-01-26--sabal-trail-easement-lcc\/Sabal-Trail-Pipeline-Easement-recorded-0017.pdf\"><strong>PDF<\/strong><\/a>\r\n<\/p>\r\n<p>\r\n -jsq\r\n<\/p>","protected":false},"excerpt":{"rendered":"This is the easement for a 36-inch fracked methane pipeline that the Lowndes County Commission approved on January 26, 2016, saying it was a good business decision. Nevermind the letter that the Chairman sent to FERC on April 11, 2014, Sabal Trail will be expected to adhere and honor all Lowndes County Ordinances -Bill E [&hellip;]","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2028,19,88,6687,11286],"tags":[258,13711,8848,8701,8709,8702,154,12,7,8734,13713,656,6076,7144,6597,13712,60,13710,6,58],"class_list":["post-26034","post","type-post","status-publish","format-standard","hentry","category-clyattville","category-history","category-lowndes-county-commission","category-pipeline-2","category-tax","tag-bill-slaughter","tag-clyatt-mill-creek","tag-clyattville","tag-georgia","tag-history","tag-lake","tag-landfill","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-lowndes-county-commission","tag-natural-gas-underground-pipeline-easement-and-agreement","tag-paige-dukes","tag-pipeline","tag-sabal-trail-management","tag-sabal-trail-transmission","tag-single-pipeline","tag-tax","tag-tina-faraca","tag-valdosta","tag-withlacoochee-river"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/26034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=26034"}],"version-history":[{"count":2,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/26034\/revisions"}],"predecessor-version":[{"id":26036,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/26034\/revisions\/26036"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=26034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=26034"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=26034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}