{"id":14904,"date":"2015-12-03T17:44:18","date_gmt":"2015-12-03T22:44:18","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=14904"},"modified":"2015-12-03T17:54:35","modified_gmt":"2015-12-03T22:54:35","slug":"withlacoochee-river-wastewater-treatment-plant-packet-materials-glpc-2015-11-30","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2015\/12\/withlacoochee-river-wastewater-treatment-plant-packet-materials-glpc-2015-11-30.html","title":{"rendered":"Withlacoochee River Wastewater Treatment Plant packet materials @ GLPC 2015-11-30"},"content":{"rendered":"<p>\nThe mysterious missing materials from Monday&#8217;s Planning Commission meeting<br \/>\nare <a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/\"><br \/>\non the LAKE website now<\/a>,<br \/>\nthanks to Lowndes County Planner Jason Davenport, by electronic mail today, 3 December 2015.<\/p>\n<p><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/REZ-2015-20XAGENDAXITEMX1XofX2-0017.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/small\/REZ-2015-20XAGENDAXITEMX1XofX2-0017.jpg\"><\/a><\/p>\n<p>He explained that this requested zoning, REZ-2015-20, was a followon to<br \/>\nrezoning <a href=\"#REZ201015\"><br \/>\nREZ-2010-15<\/a> from 2010 for the new Withlacoochee River Wastewater Treatment Plant, plus since then Valdosta had bought another adjoining parcel.<br \/>\nThe materials explain the current concerns about buffers, setbacks, roads, other uses, noise, lights, etc.; see<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/#REZ201520-text\">the text pages<\/a>.<br \/>\nThe County Planner said the packet for next week&#8217;s County Commission meetings<br \/>\nwill also include an agenda item cover sheet.<\/p>\n<p>\nFor all the other packet items from Monday&#8217;s GLPC meeting, see<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2015\/11\/valdosta-packet-items-glpc-2015-11-30.html#REZ-2015-20\">the previous post<\/a>.<br \/>\nSee also<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2015\/11\/cell-tower-cemetery-sewer-and-radio-tower-zboa-2015-12-01.html#VAR-2015-16\"><br \/>\nthe related variance VAR-2015-16<\/a><br \/>\nthat was before the Zoning Board of Appeals (ZBOA) Tuesday.<\/p>\n<p>\nHere&#8217;s the beginning of the overview from the GLPC materials: <\/p>\n<blockquote>\n<p>\nThe main reason for this request is the current conditional<br \/>\nrequirement of a bermed buffer along the norther boundary of the<br \/>\nsubject property. Right now if the previously approved conditions<br \/>\n(Attached toward the end of the packet), approved site plan<br \/>\n(Attached . . ,), and ULDC are combined it looks like what is<br \/>\ncurrently required to be constructed is<!--more--><\/p>\n<p> a ~1000&#8242; long 80&#8242; wide<br \/>\nlandscaped buffer. Within a portion of the buffer area there should<br \/>\nbe a 10&#8242; tall landscaped berm (Conditions 5, 6, and 7 and ULDC<br \/>\nSection 4.03.20). For reference, since the buffer is dominantly<br \/>\nwooded, existing trees and shrubs are eligible to be counted toward<br \/>\nbuffer requirements. In addition to the primary motivation to reduce<br \/>\nthe buffer related requirements staff is also proposing to remove<br \/>\nother conditions and is currently considering recommending to move<br \/>\nforward with the following conditions:\n<\/p>\n<p>Current Staff Recommended Conditions:<\/p>\n<p style=\"padding-left:5em;text-indent:-5em\">\nCondition #3.<br \/>\nThe streams within the northwest portion of the property zoned M-Z<br \/>\nillustrated on the Conceptual Planned Development Map prepared by<br \/>\nKimley-Hom and Associates, Inc. dated 11\/23\/10 hearing project no.<br \/>\n14224100 herein incorporated (the &ldquo;Site Plan&rdquo;) shall be<br \/>\nbuffered by a 100&#8242; wide natural vegetative buffer on the north and<br \/>\nwest sides of such streams as illustrated on the Site Plan measured<br \/>\nfrom the centerline of the existing streams.\n<\/p>\n<p>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/REZ-2015-20XAGENDAXITEMX2XofX2-0002.html\"><br \/>\n<img decoding=\"async\" style=\"border:none\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/REZ-2015-20XAGENDAXITEMX2XofX2-0002.jpg\"><\/a>\n<\/p>\n<p style=\"padding-left:5em;text-indent:-5em\">\n<p>\nCondition #7. A minimum 90&#8242; setback (inclusive of all buffers) shall<br \/>\nbe established between all property currently zoned R-1 or<br \/>\nR-10 and .all of the following types of development on the<br \/>\nproperty: buildings, outdoor storage of materials, outdoor storage<br \/>\nof equipment, parking, loading areas, driveways associated with<br \/>\nregular operations, tanks, and all sanitation facilities (temporary<br \/>\nand permanent). Driveways used for emergency response or building<br \/>\nmaintenance shall be permitted within this setback.\n<\/p>\n<p style=\"padding-left:5em;text-indent:-5em\">\nCondition #8. If the County Engineer determines that the development<br \/>\nof the property necessitates any improvements to Wetherington Lane<br \/>\nor Joseph Road, the owner of the property shall be responsible for<br \/>\nthe design, any acquisition of necessary iight-of-way, relocation of<br \/>\nutilities, and construction costs of or required for such<br \/>\nimprovements to the extent necessitated by the development of the<br \/>\nproperty.\n<\/p>\n<p style=\"padding-left:5em;text-indent:-5em\">\nCondition #10. The following uses are not allowed on the subject<br \/>\nproperty: Transitional Care Facilities, Correctional Facilities, and<br \/>\nLandfills (Sanitary or Inert), all within the meaning of the ULDC.\n<\/p>\n<p style=\"padding-left:5em;text-indent:-5em\">\nCondition #13. Loudspeakers or paging systems located on the<br \/>\nproperty shall be designed, installed, and used such that they are<br \/>\nnot heard at any abutting property line of a property currently<br \/>\nzoned R-1 or R-10.\n<\/p>\n<p style=\"padding-left:5em;text-indent:-5em\">\nCondition #14. Lighting located on the property shall be shielded<br \/>\nand directed to avoid direct illumination of adjacent properties<br \/>\ncurrently zoned R-1 or R-10.\n<\/p>\n<p style=\"padding-left:5em;text-indent:-5em\">\nCondition #15. Electromagnetic interference generated by uses of the<br \/>\nproperty shall not be discemable on adjacent properties currently<br \/>\nzoned R-1 or R-10.\n<\/p>\n<p><a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/REZ-2015-20XAGENDAXITEMX1XofX2-0010.html\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/small\/REZ-2015-20XAGENDAXITEMX1XofX2-0010.jpg\"><\/a><br \/>\nAdditionally, please note that supplemental standards, dumpster<br \/>\nstandards, other minimum buffering requirements, minimum setbacks,<br \/>\nlandscaping, and other applicable regulations apply beyond any<br \/>\nproposed conditions. Pending the results of the variance that is<br \/>\nbeing pursued, please plan on current and future connections to both<br \/>\nCounty water and County sewer services.\n<\/p>\n<p>\nFor additional reference please find information below related to<br \/>\nthe applicable standards for the current zoning and proposed use<br \/>\n(Heavy Manufacturing (M-Z) zoning used for a Wastewater Treatment<br \/>\nPlant (WWTP))\n<\/p>\n<\/blockquote>\n<p>\nThat overview continues with tables of such standards.<\/p>\n<p>\nSee also the<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/#REZ201520-text:Lovell-Engineering-request-to-remove-conditions-1-of-2\">Lovell Engineering request to remove conditions<\/a><br \/>\nand<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-11-30--glpc-wwtp\/#REZ201520-text:Lovell-Engineering-request-to-remove-conditions-1-of-2\"><br \/>\nall the other materials<\/a>.<\/p>\n<p>\n -jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The mysterious missing materials from Monday&#8217;s Planning Commission meeting are on the LAKE website now, thanks to Lowndes County Planner Jason Davenport, by electronic mail today, 3 December 2015. He explained that this requested zoning, REZ-2015-20, was a followon to rezoning REZ-2010-15 from 2010 for the new Withlacoochee River Wastewater Treatment Plant, plus since then [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[325,2,88,21,3,54,55],"tags":[8947,3303,8701,8764,8699,326,10,655,8702,12,7,8734,8711,4,8700,6,8726,294,8727,58,8951,6257,328],"class_list":["post-14904","post","type-post","status-publish","format-standard","hentry","category-glpc","category-government","category-lowndes-county-commission","category-planning","category-transparency","category-valdosta-city-council","category-water","tag-30-november-2015","tag-county-planner","tag-georgia","tag-glpc","tag-government","tag-greater-lowndes-planning-commission","tag-gretchen-quarterman","tag-jason-davenport","tag-lake","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-lowndes-county-commission","tag-planning","tag-regular-session","tag-transparency","tag-valdosta","tag-valdosta-city-council","tag-wastewater","tag-water","tag-withlacoochee-river","tag-withlacoochee-river-wastewater-treatment-plant","tag-wwtp","tag-zoning"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/14904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=14904"}],"version-history":[{"count":4,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/14904\/revisions"}],"predecessor-version":[{"id":14908,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/14904\/revisions\/14908"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=14904"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=14904"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=14904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}