{"id":14248,"date":"2015-09-07T14:50:41","date_gmt":"2015-09-07T18:50:41","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=14248"},"modified":"2015-09-08T09:16:13","modified_gmt":"2015-09-08T13:16:13","slug":"work-and-regular-sessions-both-tuesday-lcc-work-2015-09-08","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2015\/09\/work-and-regular-sessions-both-tuesday-lcc-work-2015-09-08.html","title":{"rendered":"Work and Regular Sessions both Tuesday @ LCC Work 2015-09-08"},"content":{"rendered":"<p>\nBoth LCC meetings Tuesday, plus <a href=\"http:\/\/www.l-a-k-e.org\/blog\/2015\/09\/brief-agenda-at-unusual-time-and-day-vlcia-2015-09-08.html\">Development Authority 10AM<\/a>, <a href=\"http:\/\/www.l-a-k-e.org\/blog\/2015\/09\/chamber-members-to-be-heard.html\">Chamber members to be Heard 3:30PM<\/a>, and Board of Elections 4:30PM, before the Commission votes 5:30 PM.<\/p>\n<p><strong>Update 2015-09-08:<\/strong><br \/>\nLAKE did what the county staff didn&#8217;t:<br \/>\nturned a mound of paper into electronic format and<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/\"><br \/>\nposted it<\/a>.<br \/>\nThe added material is for the<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#X6b-Indication-of-Roundabout-Support-for-Shiloh-Road\"><br \/>\nShiloh Road Roundabout<\/a> (county has to maintain lighting and landscaping)<br \/>\nand<br \/>\nthe bids for the<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#X6c-Bevel-Creek-Lift-Station-Pump\">Bevel Creek<\/a><br \/>\nand<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#X6d-Coleman-Road-Lift-Station-Pump\"><br \/>\nColeman Road<\/a> lift stations.<br \/>\nExcept there&#8217;s no bid from Xylem for replacing the Coleman Road pump.<br \/>\nDid they not bid, or did the Clerk&#8217;s office not supply that bid?<br \/>\n(Also updated links to other meetings in first line of this post.)<\/p>\n<p>\n<a title=\"Parcel 0259 034\" id=\"14244\" width=\"764\" height=\"571\" href=\"http:\/\/www.l-a-k-e.org\/blog\/?attachment_id=14244\"><br \/>\n<img loading=\"lazy\" decoding=\"async\" style=\"border:none;float:right\" id=\"14245\" width=\"300\" height=\"224\" alt=\"Parcel 0259 034\" src=\"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2015\/09\/b5c68c1bcdb618ba98d3674638e25411.jpg\"><\/a><br \/>\nThe Lowndes County Commission<br \/>\nwill consider a<br \/>\n<a href=\"#REZ-2015-15\">church rezoning on Mullins Road<\/a><br \/>\nthat&#8217;s so close to a county water line near the Lake Alapaha development<br \/>\non the Alapaha River that the County staff felt they had to warn the applicant.<br \/>\nBid awards for the utilities extension to Lowndes Middle School is on the agenda as<br \/>\n<a href=\"#South-Perimeter-Road-Utility-Extension\">South Perimeter Road Utility Extension<\/a>,<br \/>\nand it appears staff may have outsourced this million-dollar decision to Lovell Engineering.<br \/>\nUtilities also wants<br \/>\n<a href=\"#Bevel-Creek-Lift-Station-Pump\"><br \/>\n$38,930.50 for Bevel Creek<\/a><br \/>\nand<br \/>\n<a href=\"#Coleman-Road-Lift-Station-Pump\"><br \/>\n$35,144.20 for Coleman Road<\/a><br \/>\nfor new Wilo lift station pumps.<br \/>\nTheir one-paragraph writeups sound like a good deal with substantial savings,<br \/>\nbut they reference multiple quotes which were not included.<br \/>\nWhere are those quotes? (They were on paper; see above.)<\/p>\n<p>\nThe county staff also wants<br \/>\nwants<br \/>\n<a href=\"#Indication-of-Roundabout-Support-for-Shiloh-Road\">a roundabout for Shiloh Road<\/a>!<br \/>\nNext they&#8217;ll be wanting<br \/>\n<a href=\"http:\/\/www.okraparadisefarms.com\/blog\/2010\/04\/gretchen-and-paige-on-wctv-about-quarterman-road.html\">speed humps<\/a> on county roads<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2012\/07\/closing-one-end-of-brinson-drive-to-stop-speeders-lcc-2012-06-26.html\">they&#8217;ve made unsafe by paving<\/a> (don&#8217;t hold your breath).<\/p>\n<p>\nHere&#8217;s<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/\"><br \/>\nwhat LAKE got online for the commission packet<\/a><br \/>\nand the Lowndes County Commission<br \/>\n<a href=\"http:\/\/lowndescounty.com\/AgendaCenter\/ViewFile\/Agenda\/09082015-178?html=true\"><br \/>\nagenda<\/a>. See also the <a href=\"http:\/\/www.l-a-k-e.org\/blog\/2015\/09\/videos-3-small-rezonings-dasher-lowndes-valdosta-glpc-2015-08-31.html\">LAKE videos of the preceding Planning Commission meeting<\/a>.<\/p>\n<blockquote style=\"font-size:100%\">\n<p style=\"text-align:center\">\nLOWNDES COUNTY BOARD OF COMMISSIONERS<br \/>\n<br \/>\nPROPOSED AGENDA<br \/>\n<br \/>\nWORK SESSION, TUESDAY, SEPTEMBER 8, 2015,  8:30 a.m.<br \/>\n<br \/>\nREGULAR SESSION, TUESDAY, SEPTEMBER 8, 2015,  5:30 p.m.<br \/>\n<br \/>\n327 N. Ashley Street &#8211; 2nd Floor\n<\/p>\n<p><!--more--><\/p>\n<ol>\n<li>\n<a name=\"Call-to-Order\" href=\"#Call-to-Order\">Call to Order<\/a><\/p>\n<li>\n<a name=\"Invocation\" href=\"#Invocation\">Invocation<\/a><\/p>\n<li>\n<a name=\"Pledge\" href=\"#Pledge\">Pledge of Allegiance to the Flag<\/a><\/p>\n<li>\n<a name=\"Minutes-for-Approval\" href=\"#Minutes-for-Approval\">Minutes for Approval<\/a><\/p>\n<ol style=\"list-style-type: lower-alpha\">\n<li>\n<a name=\"Work-Session-Minutes-August-24-2015\" href=\"#Work-Session-Minutes-August-24-2015\">Work Session Minutes- August 24, 2015<\/a><br \/>\n<\/p>\n<li>\n<a name=\"Regular-Session-Minutes-August-25-2015\" href=\"#Regular-Session-Minutes-August-25-2015\">Regular Session Minutes- August 25, 2015<\/a><br \/>\n\n<\/ol>\n<li>\n<a name=\"Public-Hearings\" href=\"#Public-Hearings\">Public Hearings<\/a><\/p>\n<ol style=\"list-style-type: lower-alpha\">\n<li>\n<a name=\"REZ-2015-15\" href=\"#REZ-2015-15\">REZ-2015-15 Grant, 6309 Mullins Ln, E-A to R-A, Well\/Septic, 2.69 acres<\/a><br \/>\n<br \/>\n\t\t\tTRC Recommendation: Approval<br \/>\nGLPC Recommendation: Approval\t\t<\/p>\n<p style=\"font-style:normal\">\nIs the water line mentioned<br \/>\n<a href=\"http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/364?fileID=671\"><br \/>\nin the agenda item sheet<\/a><br \/>\nthe one<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2015\/07\/videos-four-board-appointments-plus-justice-water-and-alcohol-lcc-2015-06-23.html\"><br \/>\nthe one they agreed to spend $16,915 to upgrade for a developer<\/a>?<\/p>\n<blockquote>\n<p>\nThis request represents a change in zoning from Estate Agricultural<br \/>\n(BA) zoning to Residential Agricultural (R-A) zoning. The motivation<br \/>\nfor the zoning change is aimed at allowing for the subject property<br \/>\nto sell a portion of its property (Tract &ldquo;I&rdquo; 2) to the<br \/>\nsouthern property owner for the development ofa church t~150 seats).<br \/>\nAccess to and from the property is gained off of Mullins Lana. This<br \/>\nsection ot&#8217;Mullins Lane is a county&mdash;maintained unimproved<br \/>\nlocal road, Typical tratfic tlow capacity ot&#8217;a local road is less<br \/>\nthan 750 AADT. Per <u>GDOT definition<\/u> the Annual Average Daily Traffic<br \/>\n(AADT) is the average number of vehicles that pass by a counter<br \/>\nduring a 24-hour period in a certain year, Concerning the 2030<br \/>\nComprehensive Plan Future Development Map the subject property is<br \/>\nwithin the Rural Service Area and depicted as an Agricultural Area.<br \/>\nPer Comprehensive Plan guidance R-A zoning is listed as a permitted<br \/>\nzoning within an Agricultural Area. With this request the following<br \/>\nfactors should be considered the dominant E-A zoning pattern to the<br \/>\nnorth of US Hwy 84 East, the current lot size of the southern<br \/>\nproperty (447 acres), the precedent set for R-A in the area (if<br \/>\napproved), the existing C-C and R-21 zoning to the south (Lake<br \/>\nAlanaha), and the potential investment in the southern property<br \/>\nrelated to this rezoning. Ultimately. Planning found this request<br \/>\noverall consistent with the Comprehensive Plan and the TRC<br \/>\nrecommended for its approval. The GLPC reviewed this request at<br \/>\ntheir August regular meeting and unanimously recommended for its<br \/>\napproval. No one either spoke for or against the request during the<br \/>\nGLPC public hearing.\n<\/p>\n<p>\nAlthough the TRC did not believe that it should he a condition of<br \/>\napproval we did want the applicant and the future church to be aware<br \/>\nof the distance to the Lowttdes County wztier line to the south.<br \/>\nCunent regulations require a water connection ifthc water line is<br \/>\nwithin 1000&#8242; ofthe subject property. Right now, due to recent<br \/>\nconstruction, the water line to the south is around 1,400&#8242; away.\n<\/p>\n<\/blockquote>\n<p>\n<strong>Documents:<\/strong><a href=\"http:\/\/lowndescounty.com\/http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/364?fileID=671\">REZ-2015-15.pdf<\/a>\n<\/p>\n<p style=\"font-style:normal;text-align:center;font-size:80%\">\n<a title=\"Parcel 0259 034\" id=\"14244\" width=\"764\" height=\"571\" href=\"http:\/\/www.l-a-k-e.org\/blog\/?attachment_id=14244\"><br \/>\n<img loading=\"lazy\" decoding=\"async\" style=\"border:none\" id=\"14247\" width=\"600\" height=\"448\" alt=\"Parcel 0259 034\" src=\"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2015\/09\/874cbeecbc48a05509b90de1e4ecb2b7.jpg\"><\/a><br \/>\n<br \/>\n6309 Mullins Road, Parcel 0259 034.\n<\/p>\n<\/ol>\n<li>\n<a name=\"For-Consideration\" href=\"#For-Consideration\">For Consideration<\/a><\/p>\n<ol style=\"list-style-type: lower-alpha\">\n<li>\n<a name=\"South-Perimeter-Road-Utility-Extension\" href=\"#South-Perimeter-Road-Utility-Extension\">South Perimeter Road Utility Extension<\/a><br \/>\n<br \/>\n\t\t\tBoard&#8217;s Pleasure\t\t<\/p>\n<p>\n<strong>Documents:<\/strong><a href=\"http:\/\/lowndescounty.com\/http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/368?fileID=672\">South Perimeter Road Utility Extension Project.pdf<\/a>\n<\/p>\n<p style=\"font-size:normal\">\nAccording to the<br \/>\n<a href=\"http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/368?fileID=672\"><br \/>\nagenda item sheet<\/a>, the staff doesn&#8217;t actually recommend awarding<br \/>\na contract for the Lowndes Middle School utilities lines.<br \/>\nHowever, Lovell Engineering made a recommendation that<br \/>\nwas included in the county response to the LAKE open records request as<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#X6a-South-Perimeter-Road-Utility-Extension:Notice-of-Award\"><br \/>\nNotice of Award<\/a>,<br \/>\nso maybe county staff outsourced the decision to Lovell Engineering,<br \/>\nto the tune of either<br \/>\n$1,041,714.50 or $1,109,582.00.<\/p>\n<p style=\"font-size:normal\">\nThe<br \/>\n<a href=\"http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/368?fileID=672\">agenda item sheet<\/a>:<\/p>\n<blockquote>\n<p>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#X6a-South-Perimeter-Road-Utility-Extension\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/small\/South-Perimeter-Road-Utility-Extension-Project-001.jpg\"><\/a><br \/>\nHISTORY, FACTS AND ISSUES: The Lowndes County Engineering and Utilities<br \/>\nDepartment has requested proposals for the South Perimeter Road<br \/>\nUtility Extension Project. This project will consist of installing a<br \/>\n12&#8243; water main to service the south Perimeter Road area<br \/>\ndevelopments as well as Lowndes Middle School and will include the<br \/>\ninstallation of a booster pump for additional flow to this area. The<br \/>\nproject will also include the installation of an 8&#8243; sewer force main<br \/>\nand regional lift station to service this area with public sewer.<br \/>\nAttached Is a copy of the bid tabulation sheet, notice of award and<br \/>\nassociated contract.\n<\/p>\n<p>\nOPTIONS:<\/p>\n<ol>\n<li>\nAward Contract to Radney Plumbing for Alternate #1<br \/>\n<br \/>\nAward<br \/>\nContract to Standard Contractors for Alternate #2<\/p>\n<li> Board&#8217;s Pleasure\n<\/ol>\n<p>RECOMMENDED ACTION: Board&#8217;s Pleasure\n<\/p>\n<\/blockquote>\n<p style=\"font-style:normal\">\nThe<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#X6a-South-Perimeter-Road-Utility-Extension:Notice-of-Award\">Notice of Award by Lovell Engineering<\/a>:<\/p>\n<blockquote>\n<p>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#X6a-South-Perimeter-Road-Utility-Extension:Notice-of-Award\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none\" src=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/small\/S.XInnerXPerimeter-XNoticeXofXAward-001.jpg\"><\/a><br \/>\nRe: South Inner Perimeter Utility Extension<\/p>\n<p>\nMr. Fletcher,<\/p>\n<p>\nIt is our recommendation that the contract for the referenced<br \/>\nproject be awarded to the apparent low bidder for each alternative,<br \/>\nfollowing the normal process of review and approval per the Lowndes<br \/>\nCounty Board of Commissioners. The apparent low bidder for<br \/>\nAlterative No. 1 is Radney Plumbing, Inct in the amount of<br \/>\n$1,041,714.50 and for Alternative No. 2 is Standard Contractors,<br \/>\nInc. in the amount of $1,109,582.00,\n<\/p>\n<p>\nIf you have any questions please call me at (229) 253-0900,<br \/>\n<P><br \/>\nClayton Milligan, PE<br \/>\n<br \/>\nProfessional Engineer\n<\/p><\/blockquote>\n<li>\n<a name=\"Indication-of-Roundabout-Support-for-Shiloh-Road\" href=\"#Indication-of-Roundabout-Support-for-Shiloh-Road\">Indication of Roundabout Support for Shiloh Road<\/a><br \/>\n<br \/>\n\t\t\tAuthorize Chairman to Sign Indication of Roundabout Support for Shiloh Road\t\t<\/p>\n<p>\n<strong>Documents:<\/strong><a href=\"http:\/\/lowndescounty.com\/http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/367?fileID=670\">Indication of Roundabout Support for Shiloh Road.pdf<\/a>\n<\/p>\n<li>\n<a name=\"Bevel-Creek-Lift-Station-Pump\" href=\"#Bevel-Creek-Lift-Station-Pump\">Bevel Creek Lift Station Pump<\/a><br \/>\n<br \/>\n\t\t\tApprove the purchase of the Wilo pump at the&nbsp;Bevel Creek&nbsp;lift station\t\t<\/p>\n<p>\n<strong>Documents:<\/strong><a href=\"http:\/\/lowndescounty.com\/http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/365?fileID=668\">Bevel Creek Lift Station Pump.pdf<\/a>\n<\/p>\n<p style=\"font-style:normal\">\nThe <a href=\"http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/365?fileID=668\">agenda sheet<\/a> says the county got several quotes<br \/>\nand settled on<br \/>\n$38,930.50 for a new Wilo pump.<br \/>\nWho were those quotes from, and where are they?<br \/>\nNot in<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/govt\/loco\/2015-09-08--commission-packet\/#Other-6-For-Consideration:X6c-Bevel-Creek-Lift-Station-Pump\"><br \/>\nthe electronic documents the county sent LAKE<\/a> in response to its open records request.<\/p>\n<blockquote>\n<p>\nHISTORY, FACTS AND ISSUES: The Bevel Creek lift station is a triplex<br \/>\nstation that delivers over 60% of the wastewater flow to Land<br \/>\nApplication System. Currently, the county is mnning on two pumps at<br \/>\nthis station. The pump that is out of service is a Flygt pump that<br \/>\nwas built in 1992. Staff received a quote to repair this pump for<br \/>\n$40,063.50. Two additional quotes were received for a new Flygt pump<br \/>\nfor $58,097.10 and a new Wilo pump for $38,930.50 After considerable<br \/>\nresearch staff recommends the purchase of the Wilo pump at the Bevel<br \/>\nCreek lift station.\n<\/p>\n<\/blockquote>\n<li>\n<a name=\"Coleman-Road-Lift-Station-Pump\" href=\"#Coleman-Road-Lift-Station-Pump\">Coleman Road Lift Station Pump<\/a><br \/>\n<br \/>\n\t\t\tApprove the purchase of the Wilo pump at the&nbsp;Coleman Road&nbsp;lift station\t\t<\/p>\n<p>\n<strong>Documents:<\/strong><a href=\"http:\/\/lowndescounty.com\/http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/366?fileID=669\">Coleman Road Lift Station Pump.pdf<\/a>\n<\/p>\n<p style=\"font-style:normal\">\nThe<br \/>\n<a href=\"http:\/\/www.lowndescounty.com\/AgendaCenter\/ViewFile\/Item\/366?fileID=669\"><br \/>\nagenda item sheet<\/a><br \/>\nsays<br \/>\nstaff wants another $35,144.20 for a lift station pump after<br \/>\nseveral quotes.<br \/>\nWhere are those quotes?\n<\/p>\n<blockquote>\n<p>\nHISTORY, FACTS AND ISSUES: The Coleman Road lifi station is a duplex<br \/>\nstation that is currently running on one pump. The pump that is out<br \/>\nof service is a Flygt pump that was built in 1995. Staff received a<br \/>\nquote to have to pump repaired for $32,554.90. Two additional quotes<br \/>\nwere received for a new Flygt pump for $69,755.00 and a new Wllo<br \/>\npump for $35,144.20. After considerable research staff recommends the<br \/>\npurchase of the Wilo pump at the Coleman Road lift stationt\n<\/p>\n<\/blockquote>\n<\/ol>\n<li>\n<a name=\"Reports\" href=\"#Reports\">Reports &#8211; County Manager<\/a><\/p>\n<li>\n<a name=\"CWTBH\" href=\"#CWTBH\">Citizens Wishing to be Heard-Please State Your Name and Address<\/a><br \/>\n<\/p>\n<li>\n<a name=\"Adjournment\" href=\"#Adjournment\">Adjournment<\/a>\n<\/ol>\n<\/blockquote>\n<p>\n -jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Both LCC meetings Tuesday, plus Development Authority 10AM, Chamber members to be Heard 3:30PM, and Board of Elections 4:30PM, before the Commission votes 5:30 PM. Update 2015-09-08: LAKE did what the county staff didn&#8217;t: turned a mound of paper into electronic format and posted it. The added material is for the Shiloh Road Roundabout (county [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,88,3,449,55],"tags":[8692,453,8701,8699,10,8702,2448,8693,7232,12,7,8734,8694,5221,2504,8000,8700,8767,6,294,8727,90],"class_list":["post-14248","post","type-post","status-publish","format-standard","hentry","category-government","category-lowndes-county-commission","category-transparency","category-transportation","category-water","tag-8-september-2015","tag-alapaha-river","tag-georgia","tag-government","tag-gretchen-quarterman","tag-lake","tag-lake-alapaha","tag-lcc-work","tag-lift-station","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-lowndes-county-commission","tag-mullins-lane","tag-perimeter-road","tag-sewer","tag-shiloh-road","tag-transparency","tag-transportation","tag-valdosta","tag-wastewater","tag-water","tag-work-session"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/14248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=14248"}],"version-history":[{"count":6,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/14248\/revisions"}],"predecessor-version":[{"id":14268,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/14248\/revisions\/14268"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=14248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=14248"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=14248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}