{"id":12952,"date":"2015-04-22T14:16:38","date_gmt":"2015-04-22T18:16:38","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/?p=12952"},"modified":"2015-04-22T14:17:48","modified_gmt":"2015-04-22T18:17:48","slug":"groundbreaking-for-solar-at-fort-benning","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2015\/04\/groundbreaking-for-solar-at-fort-benning.html","title":{"rendered":"Groundbreaking for solar at Fort Benning"},"content":{"rendered":"<p>\n<a href=\"http:\/\/www.wrbl.com\/story\/28834446\/ft-benning-solar-power-project-groundbreaking\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;width:300px\" src=\"http:\/\/wrbl.images.worldnow.com\/images\/7494755_G.jpg\"><\/a><br \/>\nFirst of<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2014\/05\/30-mw-solar-times-3-army-bases-in-georgia-with-georgia-power.html\"><br \/>\nthree 30 MW military solar projects in Georgia<\/a>,<br \/>\nthe other two ag<br \/>\n<a href=\"http:\/\/www.eenews.net\/stories\/1059999687\"><br \/>\nFort Gordon near Augusta and Fort Stewart near Savannah<\/a>,<br \/>\nplus <a href=\"http:\/\/www.l-a-k-e.org\/blog\/2014\/08\/fourth-solar-military-base-project-by-georgia-power.html\"><br \/>\na fourth one at Kings Bay Submarine Base<\/a>.<br \/>\nThe U.S. military has long recognized <a href=\"http:\/\/www.l-a-k-e.org\/blog\/2011\/06\/energy-as-a-national-security-challenge-col-dan-nolan-solar-summit.html\"><br \/>\nfossil fuels are vulnerable supply chains that risk national security<\/a>,<br \/>\nand U.S. DoD is doing something about it.<\/p>\n<p>\nBrennan Reh, wrbl.com, 17 April 2105,<br \/>\n<a href=\"http:\/\/www.wrbl.com\/story\/28834446\/ft-benning-solar-power-project-groundbreaking\"><br \/>\nFt. Benning solar power project groundbreaking<\/a><\/p>\n<blockquote style=\"font-size:100%\">\n<p>\nFort Benning held a groundbreaking ceremony for the U.S. Army&#8217;s<br \/>\nrenewable energy solar project. Georgia Power is building solar<br \/>\npanels that will cover 200 acres on the post.\n<\/p>\n<p>\nThe solar project on Fort Benning will be the army&#8217;s largest power<br \/>\nproject in Georgia.\n<\/p>\n<p>\nThe panels will generate <!--more--><\/p>\n<p>30 megawatts of energy. Georgia Power<br \/>\nofficials said that serves around 11,000 customers.\n<\/p>\n<p>\nPeople in charge of the project said it will be helpful to have<br \/>\nrenewable energy as an extra source power especially during natural<br \/>\ndisasters. They said solar energy will help the army be ready<br \/>\nwhenever they are needed.\n<\/p>\n<p>\nKatherine Hammack, Assistant Secretary of the Army, said solar<br \/>\nenergy will cut down on the army&#8217;s energy costs. She says they could<br \/>\nuse some of the army&#8217;s energy budget for training soldiers.\n<\/p>\n<p>\nCongressman Sanford Bishop said cutting energy costs helps taxpayers<br \/>\nin the end.\n<\/p>\n<p>\n&#8220;A more efficient, effective operation is a win-win for everyone.<br \/>\nFor our community, national security, and for our country,&#8221; said<br \/>\nCongressman Bishop.\n<\/p>\n<\/blockquote>\n<p>\nAnd more construction jobs than either the Sabal Trail or Palmetto<br \/>\npipelines will ever bring to Georgia.<\/p>\n<blockquote style=\"font-size:100%\">\n<p>\nThe project is part of a commitment by the U.S. Army to the<br \/>\nPresident to secure one gigawatt of renewable energy and<br \/>\nsustainability at U.S. Army installations by 2025.\n<\/p>\n<\/blockquote>\n<p>\nAnd<br \/>\nthe Air Force has a goal of<br \/>\n<a href=\"http:\/\/www.l-a-k-e.org\/blog\/2012\/02\/solar-thermal-for-moody-afb.html\"><br \/>\n&#8220;25% of Air Force facility energy use comes from renewable energy sources by 2025&#8221;<\/a>.<\/p>\n<p>\nBoth goals need to be higher and faster, but they&#8217;re both good starts.<\/p>\n<p>\n -jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>First of three 30 MW military solar projects in Georgia, the other two ag Fort Gordon near Augusta and Fort Stewart near Savannah, plus a fourth one at Kings Bay Submarine Base. The U.S. military has long recognized fossil fuels are vulnerable supply chains that risk national security, and U.S. DoD is doing something about [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,570,24],"tags":[6171,8701,8708,8702,12,7,8783,2931,8714,6],"class_list":["post-12952","post","type-post","status-publish","format-standard","hentry","category-georgia-power","category-military","category-solar","tag-fort-benning","tag-georgia","tag-georgia-power","tag-lake","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-military","tag-sanford-bishop","tag-solar","tag-valdosta"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/12952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=12952"}],"version-history":[{"count":2,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/12952\/revisions"}],"predecessor-version":[{"id":12954,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/12952\/revisions\/12954"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=12952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=12952"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=12952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}