{"id":1178,"date":"2012-01-13T08:00:00","date_gmt":"2012-01-13T13:00:00","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/2012\/01\/cobb-emc-backing-off-of-coal-at-plant-washington.html"},"modified":"2012-01-13T08:00:00","modified_gmt":"2012-01-13T13:00:00","slug":"cobb-emc-backing-off-of-coal-at-plant-washington","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2012\/01\/cobb-emc-backing-off-of-coal-at-plant-washington.html","title":{"rendered":"Cobb EMC backing off of coal at Plant Washington"},"content":{"rendered":"<p>Could Plant Ben Hill be next?<\/p>\n<p>\nKim Isaza wrote for MDJOnline yesterday,<br \/>\n<a href=\"http:\/\/mdjonline.com\/view\/full_story\/17084357\/article-Cobb-EMC\u2019s-pursuit-cools-on-coal-fired-power-plant?instance=home_news_bullets\"><br \/>\nCobb EMC\u2019s pursuit cools on coal-fired power plant<\/a><\/p>\n<blockquote><p>\nCobb EMC&#8217;s interest in building the coal-fired Plant Washington<br \/>\n<a href=\"http:\/\/www.gipl.org\/blog\/BlogView.asp?BlogId=40968263&#038;CategoryID=6&#038;title=Submit+Written+Comments+on+Plant+Washington\"><br \/>\n<img loading=\"lazy\" decoding=\"async\" style=\"float:right;border:none;\"   width=\"189\" height=\"181\" src=\"http:\/\/www.gipl.org\/images\/Customer-images\/Plant_Washington.png\"><\/a><br \/>\nappears to be dead, and the company has begun soliciting bids for<br \/>\nits future power supplies.<\/p>\n<p>\nThe electric cooperative has already spent $13.5 million toward<br \/>\npermitting for the coal plant, which would be a new direction for<br \/>\nthe company from simply delivering electricity to also generating<br \/>\nit.<\/p>\n<p>\nOn Jan. 24, Dean Alford, a spokesman for the Power 4 Georgians<br \/>\nconsortium of EMCs behind Plant Washington, is slated to address the<br \/>\nCobb EMC board, presumably in an effort to save the plant, for which<br \/>\nhis company, Allied Energy, got a no-bid development contract from<br \/>\nP4G.<\/p>\n<p>\nThe Cobb EMC board could decide at that meeting whether to put any<br \/>\nmore money toward the project.<\/p>\n<p>\nMany details of the 850-megawatt Plant Washington, including exactly<br \/>\nwhy it is needed and any firm idea of what it will cost to build and<br \/>\noperate, have been kept quiet, sparking critical questions from EMC<br \/>\nmembers and environmental groups. It was proposed under former EMC<br \/>\nhead Dwight Brown, who is facing 34 criminal charges of theft and<br \/>\nracketeering relating to his leadership at EMC.\n<\/p><\/blockquote>\n<p>So can somebody come up with an 850 MW solar plant to propose by 24 Jan 2012?<\/p>\n<p>\n-jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Could Plant Ben Hill be next? Kim Isaza wrote for MDJOnline yesterday, Cobb EMC\u2019s pursuit cools on coal-fired power plant Cobb EMC&#8217;s interest in building the coal-fired Plant Washington appears to be dead, and the company has begun soliciting bids for its future power supplies. The electric cooperative has already spent $13.5 million toward permitting [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[97,216,1127,14,19,20,24],"tags":[8753,8818,969,8710,3155,2741,8714],"class_list":["post-1178","post","type-post","status-publish","format-standard","hentry","category-activism","category-coal","category-cobb-emc","category-economy","category-history","category-law","category-solar","tag-coal","tag-cobb-emc","tag-economics","tag-law","tag-plant-ben-hill","tag-plant-washington","tag-solar"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/1178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=1178"}],"version-history":[{"count":0,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/1178\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=1178"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=1178"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=1178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}