{"id":1145,"date":"2012-01-28T10:06:11","date_gmt":"2012-01-28T15:06:11","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/2012\/01\/georgia-power-doubles-solar-capacity-in-dalton-ga.html"},"modified":"2012-01-28T10:06:11","modified_gmt":"2012-01-28T15:06:11","slug":"georgia-power-doubles-solar-capacity-in-dalton-ga","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2012\/01\/georgia-power-doubles-solar-capacity-in-dalton-ga.html","title":{"rendered":"Georgia Power doubles solar capacity in Dalton, GA"},"content":{"rendered":"Dalton, the place that\n<a href=\"\/blog\/2011\/02\/mayor-fretti-at-wiregrass-solar-llc-groundbreaking.html\">\nhad a solar plant bigger and earlier than Valdosta&#8217;s.<\/a>\nDid\n<a href=\"\/blog\/2011\/05\/come-back-and-expand-on-this-one-valdosta-mayor-john-fretti.html\">\nMayor Fretti&#8217;s brag about this location being competitive<\/a>\ngo out with him?\nCrawford Powell is still a County Commissioner.\nThe Industrial Authority is still supposed to be bringing in industry.\nThe Chamber of Commerce is still supposed to be promoting jobs.\nIf\n<a href=\"\/blog\/2012\/01\/car-part-manufacturer-locates-in-dublin-georgia.html\">\nDublin<\/a>\nand Dalton do this, it seems like Valdosta and Lowndes County could&#8230;.\n<p>\nDave Williams wrote for the Atlanta Business Chronicle Thursday,\n<a href=\"http:\/\/www.bizjournals.com\/atlanta\/news\/2012\/01\/26\/georgia-power-tees-up-next-phase-of.html\">\nGeorgia Power tees up next phase of solar plant,<\/a>\n<blockquote>\n<a href=\"http:\/\/www.u-renew.com\/solar_study.php\">\n<img decoding=\"async\" style=\"float:right;border:none;\"   src=\"http:\/\/www.u-renew.com\/images\/case_study_usfloors_dalton.jpg\"><\/a>\nGeorgia Power Co. will begin construction soon on a project that\nwill double the generating capacity of the utility&#8217;s solar plant in\nDalton, Ga., the company announced Thursday.\n<p>\nThe first phase of the plant went on line last March and is\noperating with a capacity of 350 kilowatts.\n<p>\nConstruction of the second phase, due to be completed in about two\nmonths, will bring the plant up to 700 kilowatts, on its way to a\nfull capacity of 1 megawatt of electricity. One megawatt of solar\nphotovoltaic panels produces enough energy to power about 135 homes.\n<\/blockquote>\nLet&#8217;s see some local leadership!\n<p>\n-jsq\n","protected":false},"excerpt":{"rendered":"Dalton, the place that had a solar plant bigger and earlier than Valdosta&#8217;s. Did Mayor Fretti&#8217;s brag about this location being competitive go out with him? Crawford Powell is still a County Commissioner. The Industrial Authority is still supposed to be bringing in industry. The Chamber of Commerce is still supposed to be promoting jobs. [&hellip;]","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_links_to":"","_links_to_target":""},"categories":[97,263,18,21,23,24,178,332],"tags":[3131,8701,8708,2793,7,8714,3132,6,8749,8765],"class_list":["post-1145","post","type-post","status-publish","format-standard","hentry","category-activism","category-dublin-ga","category-georgia-power","category-planning","category-renewable-energy","category-solar","category-vlcia","category-vlcoc","tag-dalton","tag-georgia","tag-georgia-power","tag-leadership","tag-lowndes-county","tag-solar","tag-united-renewable-energy","tag-valdosta","tag-vlcia","tag-vlcoc"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p585fK-it","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/1145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=1145"}],"version-history":[{"count":0,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/1145\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=1145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=1145"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=1145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}