{"id":113,"date":"2013-02-14T11:07:33","date_gmt":"2013-02-14T16:07:33","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/2013\/02\/renewable-energy-much-needed-in-georgia-john-s-quarterman.html"},"modified":"2013-02-14T11:07:33","modified_gmt":"2013-02-14T16:07:33","slug":"renewable-energy-much-needed-in-georgia-john-s-quarterman","status":"publish","type":"post","link":"http:\/\/www.l-a-k-e.org\/blog\/2013\/02\/renewable-energy-much-needed-in-georgia-john-s-quarterman.html","title":{"rendered":"Renewable energy much needed in Georgia &mdash;John S. Quarterman"},"content":{"rendered":"<p>\nMy op-ed in the VDT today; I&#8217;ve added links, plus some more after the op-ed.\n<\/p>\n<blockquote>\n<p>\n<a href=\"http:\/\/www.flickr.com\/photos\/98706376@N00\/8473927568\/\"><br \/>\n<img decoding=\"async\" style=\"float:right;border:none;\" class=\"at-xid-6a0120a58214e4970b017ee8833015970d\" src=\"\/blog\/images\/6a0120a58214e4970b017ee8833015970d-pi.jpg\"    \/><\/a><br \/>\nFinally! Kewaunee, Calvert Cliffs, and now Crystal River<br \/>\npermanently closing say it&#8217;s time for Georgia to stop wasting money<br \/>\non Southern Company&#8217;s already over-budget and increasingly-late<br \/>\nnukes and get on with solar power and wind off the coast: for<br \/>\njobs, for energy independence, and for clean air and plenty of<br \/>\nclean water.\n<\/p>\n<dl>\n<dt>\nFebruary 2013:\n<\/dt>\n<dd>\n<a href=\"\/blog\/2013\/02\/duke-energy-is-closing-crystal-river-nuclear-reactor.html\"><br \/>\nDuke Energy is closing<\/a> the Crystal River nuclear<br \/>\nreactor<br \/>\n<a href=\"http:\/\/www.tampabay.com\/news\/business\/energy\/duke-energy-announces-closing-of-crystal-river-nuclear-power-plant\/1273794\"><br \/>\n(Tampa Bay Times, 6 Feb 2013)<\/a>,<br \/>\n160 miles south of us, because<br \/>\n<a href=\"\/blog\/2013\/01\/crystal-river-nuke-still-cant-get-insurance-payoff.html\"><br \/>\nnobody wants to pay to fix it<\/a>:<br \/>\nbetween &#8220;$1.5 billion and $3.4 billion,<br \/>\nplus what it costs to buy power to replace<br \/>\nwhat Crystal River would have produced while it is<br \/>\nbeing repaired&#8221;<br \/>\n<a href=\"\/blog\/2012\/07\/torresol-energy-provides-solar-energy-night-and-day.html\"><br \/>\n[Charlotte Business Journal, 11 Jan 2013]<\/a>.\n<\/dd>\n<dt>\nNovember 2012:<\/dt>\n<dd>\n<a href=\"\/blog\/2012\/11\/calvert-cliffs-nuke-terminated.html\"><br \/>\nNRC terminated<\/a> Maryland&#8217;s Calvert Cliffs 3<br \/>\n<a href=\"http:\/\/www.nirs.org\/nukerelapse\/calvert\/11-01-12terminationorder.pdf\"><br \/>\n(NRC 1 Nov 2012)<\/a><br \/>\nafter<br \/>\n<a href=\"\/blog\/2012\/09\/nrc-rejects-nuke-permit-for-edf-in-maryland.html\"><br \/>\nConstellation Energy dropped out<\/a> because the cost &#8220;is too high<br \/>\nand creates too much risk for Constellation&#8221;<br \/>\n<a href=\"http:\/\/www.bloomberg.com\/news\/2010-10-09\/constellation-drops-maryland-nuclear-plant-loan-denting-edf-s-u-s-plans.html\"><br \/>\n[Bloomberg 10 Oct 2010]<\/a>.\n<\/dd>\n<\/dl>\n<\/blockquote>\n<p><!--more--><\/p>\n<blockquote>\n<dl>\n<dt>\nOctober 2012:<\/dt>\n<dd>\n<a href=\"\/blog\/2012\/12\/kewaunee-nuke-is-shutting-down-why-are-we-building-more-at-vogtle.html\"><br \/>\nDominion Power decided to close<\/a><br \/>\nWisconsin&#8217;s<br \/>\nKewaunee reactor<br \/>\n<a href=\"https:\/\/www.dom.com\/about\/stations\/nuclear\/kewaunee\/index.jsp\"><br \/>\n(Dominion Power PR 22 Oct 2012)<\/a><br \/>\nas not economically viable with no buyer<br \/>\n<a href=\"http:\/\/www.jsonline.com\/news\/opinion\/market-has-spoken-in-kewaunee-shutdown-1b7bcjh-176502791.html\"><br \/>\n(JSOnline 30 Oct 2012)<\/a>.\n<\/dd>\n<dt>\nJanuary 2012:<\/dt>\n<dd>leaks shut down California&#8217;s<\/p>\n<table style=\"float:right;width:30%;\"  >\n<tbody>\n<tr>\n<td style=\"font-size: 120%; font-weight: bold;\">\nGoogle already deployed<br \/>\n2 gigawatts of wind and solar power<br \/>\nfor $1 billion:<br \/>\nalmost as much as<br \/>\nVogtle 3 and 4&#8217;s projected 2.2 GW,<br \/>\nfor less than Georgia Power customers have already paid.\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>San Onofre 3 and 4 in<br \/>\n<a href=\"http:\/\/www.nrc.gov\/info-finder\/reactor\/songs\/tube-degradation.html\"><br \/>\n(NRC 31 Jan 2012)<\/a><br \/>\nand<br \/>\n<a href=\"\/blog\/2012\/12\/nrc-doesnt-publish-nuclear-licensing-documents.html\"><br \/>\ntheir owners want the NRC to let them reopen Unit 4<\/a><br \/>\nas an experiment while refusing to show the public<br \/>\nany evidence that that would be safe<br \/>\n<a href=\"\/blog\/2012\/12\/nrc-says-its-never-been-a-practice-to-show-licensee-documents-to-the-public.html\"><br \/>\n(NRC 18 Dec 2012)<\/a>.<br \/>\n[Actually San Onofre 2 and 3 shut down, and it&#8217;s Unit 2 they want to reopen;<br \/>\nmy error. -jsq]\n<\/dd>\n<dt>\nJune 2009:<\/dt>\n<dd>\n<a href=\"\/blog\/2012\/05\/nuclears-bet-the-farm-risk-moodys.html\"><br \/>\nMoody&#8217;s called nuclear<\/a> a<br \/>\n<a href=\"http:\/\/nukefreetexas.org\/downloads\/Moodys_June_2009.pdf\"><br \/>\n&#8220;bet-the-farm risk&#8221;<\/a>,<br \/>\nand it&#8217;s our farms and houses and businesses the legislature is betting.\n<\/dd>\n<dt>\nApril 2009:<\/dt>\n<dd>\n<a href=\"\/blog\/2012\/05\/who-voted-for-georgia-powers-nuke-rate-hike-cwip.html\"><br \/>\nGeorgia&#8217;s SB 31<br \/>\n&#8220;Energy Rate Increases to Finance Nuclear Power Plant Construction&#8221;<\/a><br \/>\n<a href=\"\/blog\/2012\/11\/georgia-power-raising-rates.html\"><br \/>\nauthorized Georgia Power to charge customers for power nobody<br \/>\nis getting<\/a> from Vogtle 3 and 4,<br \/>\n<a href=\"http:\/\/www.ajc.com\/news\/business\/georgia-power-bills-to-change\/nStgg\/\"><br \/>\n$1.7 billion so far (Kristi Swartz, AJC, 1 Nov 2012)<\/a>,<br \/>\nplus<br \/>\n<a href=\"\/blog\/2012\/12\/15-month-delay-for-new-plant-vogtle-nukes-state-inspector-at-psc.html\"><br \/>\nabout a billion over budget and at least 15 months behind<\/a><br \/>\nschedule<br \/>\n<a href=\"http:\/\/www.gpb.org\/news\/2012\/12\/18\/plant-vogtle-construction-costs-rising\"><br \/>\n(GPB 18 Dec 2012)<\/a>,<br \/>\nwith<br \/>\nconcrete pouring errors<br \/>\n<a href=\"http:\/\/aikenleader.villagesoup.com\/p\/vogtle-ap1000-reactor-vessel-discovered-unprotected-stranded-in-savannah-port-since-december-15\/948156?cid=13129617\"><br \/>\n(Aiken Leader 14 Jan 2013)<\/a><br \/>\nmuch like<br \/>\n<a href=\"\/blog\/2013\/01\/failed-concrete-the-bane-of-nuclear-reactors-1.html\"><br \/>\nthose that ended<\/a> Crystal River<br \/>\n<a href=\"http:\/\/www.nrc.gov\/info-finder\/reactor\/cr3\/concrete-containment-separation.html\"><br \/>\n(NRC 10 Oct 2012)<\/a>.\n<\/dd>\n<dt>\n1987:<\/dt>\n<dd>\n<a href=\"\/blog\/2012\/12\/original-nuclear-plant-vogtle-cost-overruns.html\"><br \/>\nVogtle 1 and 2 cost 26 times<\/a><br \/>\nthe original estimate<br \/>\n<a href=\"http:\/\/www.ajc.com\/news\/business\/a-financial-look-at-plant-vogtle-nuclear-projects\/nQQqb\/\"><br \/>\n(Kristi Swartz, AJC, 30 Jan 2012)<\/a>.\n<\/dd>\n<dt>\nNow:<\/dt>\n<dd>\nIt&#8217;s time for the legislature to revoke SB 31, and to pass<br \/>\n<a href=\"\/blog\/2013\/01\/ga-sb-51-the-the-georgia-cogeneration-and-distributed-generation-act.html\"><br \/>\n2013&#8217;s GA SB 51, &#8220;The Georgia Cogeneration and Distributed Generation Act&#8221;<\/a>,<br \/>\nwhich will enable financing for rooftop solar for jobs and<br \/>\nlower electric bills throughout Georgia.\n<\/dd>\n<\/dl>\n<p>\nAnd<br \/>\n<a href=\"\/blog\/2012\/05\/wind-power-and-the-southern-company-seth-gunning-so-2012-05-23.html\"><br \/>\nit&#8217;s time for Gov. Deal to get on board<\/a> with ten other<br \/>\nAtlantic state governors for wind power off the coast<br \/>\n<a href=\"http:\/\/www.doi.gov\/news\/pressreleases\/Salazar-Signs-Agreement-with-10-East-Coast-Governors-to-Establish-Atlantic-Offshore-Wind-Energy-Consortium.cfm\"><br \/>\n(DOI 8 June 2010)<\/a>.\n<\/p>\n<p>\nGoogle already deployed<br \/>\n2 gigawatts of wind and solar power<br \/>\nfor $1 billion<br \/>\n<a href=\"http:\/\/money.cnn.com\/2013\/01\/09\/technology\/google-wind-farm\/index.html\"><br \/>\n(David Goldman, CNNMoney 10 Jan 2013)<\/a>:<br \/>\nalmost as much as<br \/>\n<a href=\"\/blog\/2013\/01\/googles-invests-in-wind-and-solar.html\"><br \/>\nVogtle 3 and 4&#8217;s projected 2.2 GW,<br \/>\nfor less than Georgia Power customers have already paid<\/a>.<br \/>\nLet&#8217;s get on with real 21st century renewable energy:<br \/>\nconservation, efficiency, and wind and solar power, for jobs,<br \/>\nhealth, air and water!\n<\/p>\n<p>\n<strong>John S. Quarterman Lowndes County<\/strong>\n<\/p>\n<\/blockquote>\n<p>\nSince then<br \/>\n<a href=\"\/blog\/2013\/02\/hb-267-financing-costs-construction-of-nuclear-generating-plant.html\"><br \/>\nHB 267<\/a> to stop Georgia Power from charging customers for Plant Vogtle<br \/>\ncost overruns<br \/>\nhas been proposed in the Georgia General Assembly,<br \/>\nand it turns out reactors closing for financial reasons goes back to<br \/>\n<a href=\"\/blog\/2013\/02\/it-has-to-close-because-of-the-pocketbook-kyle-jones-on-maine-yankee-nuclear-power-plant.html\"><br \/>\nMaine Yankee in 1997 and even before.<\/a><br \/>\nThat (plus Kewaunee and Crystal River)<br \/>\n<a href=\"\/blog\/2013\/02\/as-went-maine-yankee-so-goes-san-onofre-another-reactor-will-close.html\"><br \/>\nbodes well for<\/a><br \/>\nSan Onofre 2 staying closed permanently,<br \/>\nalthough<br \/>\n<a href=\"\/blog\/2013\/02\/vermont-yankee-may-be-next-nuke-to-close.html\">Maine Yankee may close first,<\/a><br \/>\nand<br \/>\n<a href=\"\/blog\/2013\/02\/pilgrim-nuke-shut-down-in-winter-storm-again-this-weekend.html\"><br \/>\nEntergy can&#8217;t keep Pilgrim Station up in a snowstorm<\/a>,<br \/>\nnot to mention Entergy can&#8217;t keep the lights on during the SuperBowl.\n<\/p>\n<p>\nHow about we stop shovelling money into nukes and spend it on dependable<br \/>\nsolar and wind power instead?\n<\/p>\n<p>\n-jsq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>My op-ed in the VDT today; I&#8217;ve added links, plus some more after the op-ed. Finally! Kewaunee, Calvert Cliffs, and now Crystal River permanently closing say it&#8217;s time for Georgia to stop wasting money on Southern Company&#8217;s already over-budget and increasingly-late nukes and get on with solar power and wind off the coast: for jobs, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[97,202,556,40,142,14,264,265,16,70,203,8,18,2,19,20,104,21,22,32,23,24,53,133,55,36],"tags":[8736,8750,8779,634,391,339,630,8717,635,631,437,8746,636,628,143,8704,8754,8755,8706,8728,8751,8701,8708,639,8699,8709,638,627,8702,8710,12,7,632,390,117,8737,633,8711,8712,8715,8713,637,8766,388,400,108,8725,6,8742,626,8727,8716,629],"class_list":["post-113","post","type-post","status-publish","format-standard","hentry","category-activism","category-agriculture","category-air","category-community","category-cwip","category-economy","category-energy-conservation","category-energy-efficiency","category-environment","category-ethics","category-florida","category-georgia","category-georgia-power","category-government","category-history","category-law","category-nuclear","category-planning","category-politics","category-pollution","category-renewable-energy","category-solar","category-sustainability","category-vdt","category-water","category-wind","tag-activism","tag-agriculture","tag-air","tag-behind-schedule","tag-bet-the-farm","tag-california","tag-calvert-cliffs","tag-community","tag-concrete","tag-constellation-energy","tag-cost-overrun","tag-cwip","tag-distributed-energy","tag-dominion","tag-duke-energy","tag-economy","tag-energy-conservation","tag-energy-efficiency","tag-environment","tag-ethics","tag-florida","tag-georgia","tag-georgia-power","tag-google","tag-government","tag-history","tag-housetop","tag-kewaunee","tag-lake","tag-law","tag-lowndes-area-knowledge-exchange","tag-lowndes-county","tag-maryland","tag-moodys","tag-nrc","tag-nuclear","tag-over-budget","tag-planning","tag-politics","tag-pollution","tag-renewable-energy","tag-rooftop","tag-san-onofre","tag-sb-31","tag-sb-51","tag-southern-company","tag-sustainability","tag-valdosta","tag-vdt","tag-vogtle","tag-water","tag-wind","tag-wisconsin"],"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=113"}],"version-history":[{"count":1,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/113\/revisions"}],"predecessor-version":[{"id":4985,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/posts\/113\/revisions\/4985"}],"wp:attachment":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media?parent=113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/categories?post=113"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/tags?post=113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}