{"id":16870,"date":"2016-06-09T10:17:06","date_gmt":"2016-06-09T14:17:06","guid":{"rendered":"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86.jpg"},"modified":"2016-06-09T10:17:06","modified_gmt":"2016-06-09T14:17:06","slug":"dc2edf9e1473c57bd1a9334910e7cb86-jpg","status":"inherit","type":"attachment","link":"http:\/\/www.l-a-k-e.org\/blog\/dc2edf9e1473c57bd1a9334910e7cb86-jpg","title":{"rendered":"300&#215;232 Figure 5.1.2.1 Hydraulic Network, in Dukes Bay Canal Sub-Basin, by Valdosta Utilities, 14 January 2011"},"author":3,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":[],"class_list":["post-16870","attachment","type-attachment","status-inherit","hentry"],"description":{"rendered":"<p class=\"attachment\"><a href='http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"232\" src=\"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86-300x232.jpg\" class=\"attachment-medium size-medium\" alt=\"300x232 Figure 5.1.2.1 Hydraulic Network, in Dukes Bay Canal Sub-Basin, by Valdosta Utilities, 14 January 2011\" \/><\/a><\/p>\n300&#215;232 Figure 5.1.2.1 Hydraulic Network, in Dukes Bay Canal Sub-Basin, by Valdosta Utilities, 14 January 2011, \nMaster Stormwater Management Plan       \nhttp:\/\/wwals.net\/2016\/06\/09\/valdosta-force-main-and-new-wwtp-are-online-and-working\/"},"caption":{"rendered":"300&#215;232 Figure 5.1.2.1 Hydraulic Network, in Dukes Bay Canal Sub-Basin, by Valdosta Utilities, 14 January 2011, \nMaster Stormwater Management Plan       \nhttp:\/\/wwals.net\/2016\/06\/09\/valdosta-force-main-and-new-wwtp-are-online-and-working\/"},"alt_text":"300x232 Figure 5.1.2.1 Hydraulic Network, in Dukes Bay Canal Sub-Basin, by Valdosta Utilities, 14 January 2011","media_type":"image","mime_type":"image\/jpg","media_details":{"width":300,"height":232,"file":"2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86.jpg","sizes":{"thumbnail":{"file":"dc2edf9e1473c57bd1a9334910e7cb86-150x150.jpg","width":150,"height":150,"mime_type":"image\/jpeg","source_url":"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86-150x150.jpg"},"medium":{"file":"dc2edf9e1473c57bd1a9334910e7cb86-300x232.jpg","width":300,"height":232,"mime_type":"image\/jpeg","source_url":"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86-300x232.jpg"},"full":{"file":"dc2edf9e1473c57bd1a9334910e7cb86.jpg","width":300,"height":232,"mime_type":"image\/jpg","source_url":"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86.jpg"}},"image_meta":{"aperture":"0","credit":"Valdosta Utilities","camera":"","caption":"300x232 Figure 5.1.2.1 Hydraulic Network, in Dukes Bay Canal Sub-Basin, by Valdosta Utilities, 14 January 2011, \nMaster Stormwater Management Plan       \nhttp:\/\/wwals.net\/2016\/06\/09\/valdosta-force-main-and-new-wwtp-are-online-and-working\/","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"300x232 Figure 5.1.2.1 Hydraulic Network, in Dukes Bay Canal Sub-Basin, by Valdosta Utilities, 14 January 2011","orientation":"0","keywords":[]}},"post":null,"source_url":"http:\/\/www.l-a-k-e.org\/blog\/wp-content\/uploads\/2016\/06\/dc2edf9e1473c57bd1a9334910e7cb86.jpg","filename":"dc2edf9e1473c57bd1a9334910e7cb86.jpg","filesize":15198,"_links":{"self":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media\/16870","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/media"}],"about":[{"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/types\/attachment"}],"author":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.l-a-k-e.org\/blog\/wp-json\/wp\/v2\/comments?post=16870"}]}}